Starting point. The same standalone storage system, 10 MW and 20 MWh, this time in a PV-dominated grid area in Lower Bavaria. Here too, the grid operator is proposing a rule-based feed-in limit that follows the state of the grid: when the grid is full of PV power, the permitted feed-in capacity of the storage system drops. The question: what does this limit cost a storage system that mainly wants to charge at midday?
Model case, not a customer reference: the storage system is generic, the feed-in limit is real. inframind calculated it in the grid simulation for the grid area, for every quarter-hour of 2025.
Methodology
Two runs in minimum energy, the same storage system, calculated twice. The reference is the full connection without an FCA. The second run adds the feed-in limit as a constraint in the dispatch optimisation, across all 35,040 quarter-hours, with balancing services still permitted. The framework is the same as in North Frisia: Day-Ahead, Intraday auction and continuous Intraday, FCR and aFRR, price year 2025 (ENTSO-E, regelleistung.net), investment of €5.6 million (280 €/kWh), 20 years, 8% interest rate, maximum of 730 full cycles per year. The net present value (NPV) is calculated here without residual value and is therefore not directly comparable with the North Frisia figure.
Result
Without restriction, the storage system earns €2.18 million per year, net present value (NPV) €14.66 million, return 36.8%, payback period 2.7 years. With the limit: revenue of €2.17 million, net present value (NPV) €14.64 million, return 36.7%, payback period 2.7 years. The difference in revenue is €1,574 per year, or 0.07%.
The limit applies in 2,238 quarter-hours, 6.4% of the year. Of these, 98% fall between April and August and 94% between 08:00 and 20:00, with a peak from 12:00 to 16:00. In these quarter-hours, power on the Day-Ahead market costs 35 €/MWh on average, below 50 €/MWh in 60% of cases and zero or below in 36%. In two thirds of these quarter-hours the storage system is charging, and in 5% it is feeding in. Only 1.1% of its total fed-in energy falls in quarter-hours in which the limit applies. Here, a feed-in limit hits a storage system that is doing exactly the opposite.
What the limit changes is not arbitrage but the reservation of positive balancing services during the midday hours: €6,605 less balancing services revenue, €5,030 more arbitrage, a net loss of €1,574.
Context
The comparison with North Frisia shows why the grid model is decisive. In the north, the same clause binds in 14% of quarter-hours, around the clock during the storm months, and costs 0.6%. In the south, it binds in 6.4% of quarter-hours, at midday in summer, and costs 0.07%. Both are small. But you only know which case you have once you have the grid model. If you derive a limit from rules of thumb or a fixed time of day, you are calculating a different storage system from the one that gets built. External calculations using a static PV envelope curve arrive at a revenue loss of around 16% (EERA Consulting, Battery Beats 02/2026, price year 2025). We have not yet calculated a rigid time-of-day limit for this site.
Perfect foresight applies here too: the optimiser knows prices and limit for the whole year. Real trading results are typically 10 to 20% below the optimum, equally for both runs.
Conclusion
In a PV grid, the rule-based feed-in limit at midday hardly matters for a storage system. In talks with the grid operator, it is worth looking at everything else the contract fixes rigidly: exclusion from balancing services, ramps, fixed time windows. The North Frisia case shows what these clauses cost. The joint study with inframind is in the Grid Connection Report Vol. 2. There is also the webinar with inframind.