A logistics site in Bochum runs a diesel fleet with an annual fuel consumption of 2,347 MWh diesel/a and a grid connection of 368.4 kW (Bochum municipal utilities). The goal: full conversion to e-trucks without costly grid expansion.
Methodology
In minimum energy, five scenarios were modelled and compared directly, from the status quo to the fully integrated solution with storage, dynamic tariff and PV.
1. Existing | Diesel fleet (status quo)
Baseline: 1,187 MWh/a electricity demand, 2,347 MWh/a diesel. Operating costs: €1,192,737/year, emissions: 1,104,000 kg CO₂/year.
2. Switch to e-vehicles (without storage)
The grid connection is not sufficient. It has to be upgraded to 414.9 kW. Investment: €2,500,000. Operating costs: €525,814/year (-56%). Payback period: 3.7 years, return: 27.8%/year.
3. E-vehicles + grid connection limiting (229.6 kWh BESS)
Battery storage limits the grid connection power, so the grid connection stays at 368.4 kW, no expansion needed. Investment: €2,565,788. Operating costs: €524,552/year (-56%). Payback period: 3.8 years, return: 27.1%/year.
4. E-vehicles + grid connection limiting + dynamic power purchasing (302.8 kWh BESS)
The storage system is also used for Day-Ahead arbitrage, and the optimal storage size rises to 302.8 kWh. Investment: €2,586,284. Operating costs: €435,024/year (-64%). Payback period: 3.4 years, return: 30.3%/year. This is the economic optimum.
5. E-vehicles + dyn. power purchasing + PV (204.5 kWh BESS + 750 kWp)
PV complements the system: self-sufficiency 35%, self-consumption 92%, electricity sales 51 MWh/a. Investment: €3,046,254. Operating costs: €360,314/year (-70%). Payback period: 3.6 years, return: 28.2%/year. CO₂ emissions: -43% to 630,000 kg/year.
Result
The key lever: A 229.6 kWh storage system (grid connection limiting) makes the grid connection upgrade unnecessary, at almost identical costs to the scenario without storage. If you also integrate dynamic power purchasing, you reach the economic optimum: payback period of 3.4 years, return of 30.3%/year.
The case shows: Fleet conversion without storage sizing is incomplete. minimum energy calculates all scenarios in minutes, with real grid fees, real load profiles and real capital expenditure.