Three scenarios, one site: why 1.15 MWh delivers more than 5 MWh
One site, one question: what is the battery actually for?
An industrial site in Düren (NRW): 9.3 GWh annual consumption, 1.15 MWp existing PV, 2.95 MW grid connection at medium voltage. Instead of guessing the storage system size, we ran the numbers. Three scenarios, two regulatory periods, a 20-year horizon.
The three scenarios
S1 Classic: peak shaving and self-consumption
Flat tariff, the battery is meant to smooth the load peak. Result: the optimiser does not build a single kWh. The reason is in the price sheet of the grid operator. Below 2,500 utilisation hours, the peak costs only €15.38 per kW and year here. That does not support a storage system.
S2 Smart: dynamic tariff and arbitrage with 1.15 MWh
Switch to Day-Ahead purchasing. The storage system becomes a price hunter: charge cheaply at night, buffer the PV midday peak, cover expensive hours from storage. Result: €290k lower electricity costs in the first year, a reduction of 25%. Initial investment €323k, net present value (NPV) €2.86 million over 20 years, payback period of around 1.1 years. A battery replacement at the end of the horizon is included.
S3 Multi-Use: the big combination with 5 MWh / 2.5 MW
Day-Ahead purchasing, arbitrage and atypische Netznutzung under § 19(2) StromNEV. The storage system does three jobs at once. In the HLZF (high-load time windows set by the German grid operator), it reduces the billable demand from 4,977 kW to 1,848 kW. That is 63% less, while the requirement at medium voltage is 20%. Result: €423k lower electricity costs in the first year, a reduction of 36%. Investment €1.4 million.
The twist: the regulation changes. So does the battery.
From 2029, the AgNes draft from the Bundesnetzagentur (BNetzA, Germany's Federal Network Agency) proposes a capacity charge to replace today's demand charge. That removes the lever from load peaks and atypische Netznutzung. The roadmap therefore recalculates the requirement from 2029: instead of 5 MWh, the site needs only 782 kWh.
What happens to the remaining 4.2 MWh? We calculate conservatively and write them off completely in 2029. Across both phases, this gives S3 an NPV of €2.0 million and a payback period of 3.9 years. S3 earns more than S2 in the first two years. Over 20 years, S2 comes out ahead.
The result at a glance
- S1 Peak shaving: 0 kWh battery, no investment, no added value compared with today.
- S2 Dynamic: 1.15 MWh, €323k initial investment, NPV €2.86 million, payback period 1.1 years.
- S3 Multi-Use: 5 MWh / 2.5 MW, requirement of 782 kWh from €2029,1.4 million initial investment, NPV €2.0 million, payback period 3.9 years.
NPV in each case over 20 years at 8% WACC.
The takeaway
The answer to "How big does the battery need to be?" is not a number. It depends on the tariff, on the grid fees regime and on how long the rules apply. The 5 MWh earns well as long as atypische Netznutzung exists. After that, the site needs only a fraction of it. If you build big today, you need a plan for the capacity after 2029. Without that plan, the smaller storage system with a dynamic tariff is the better choice. With a quarter of the capital.
Assumptions
- Site: industrial, medium voltage, 2.95 MW grid connection, 1,150 kWp existing PV. Grid operator Leitungspartner GmbH, grid fees 2026 (ene't).
- Financing: 8% WACC, 20-year period under review (2027 to 2046).
- Battery: €280/kWh, 7,500 full cycles, 2% calendar ageing per year, 0.5 C, 95% charge and 95% discharge efficiency. Lifetime calculated on a cycle basis.
- Electricity purchasing: flat 13.0 ct/kWh plus 4.1 ct/kWh levies (base case) or Day-Ahead (EPEX 2025), each plus 2% per year.
- Roadmap in two phases: 2027 to 2028 with interval metering demand charge, from 2029 with capacity charge (BNetzA draft GBK-25-01-1).
Note: the optimisation assumes perfect price and load foresight, so it shows the theoretical optimum. Uncertainties in market price development are not modelled. The AgNes parameters come from the current draft, and the final rates may differ. The results page in the platform credits the capacity no longer needed in 2029 with its residual value of €1.08 million, for example for resale or use at another site. S3 therefore ranks higher there. The figures on this page are calculated without this credit.