04.12.2026

lcmd onsiteOur next webinar

Grid connection in 2031, charging park in 2027: how you bridge the gap with a storage system and still make the numbers work
Use Case

Commercial and industrial (C&I): retrofitting BESS, Multi-Use scenarios

Industrial site in NRW with 9.3 GWh consumption and existing PV: three storage system scenarios across two grid fees regimes. The smaller storage system with a dynamic tariff beats 5 MWh Multi-Use.

Use Case key data

323k

Initial investment

1.1 yrs

Payback period

2.86M

Net present value (NPV)

-23%

Electricity costs year 1

Three scenarios, one site: why 1.15 MWh delivers more than 5 MWh

One site, one question: what is the battery actually for?

An industrial site in Düren (NRW): 9.3 GWh annual consumption, 1.15 MWp existing PV, 2.95 MW grid connection at medium voltage. Instead of guessing the storage system size, we ran the numbers. Three scenarios, two regulatory periods, a 20-year horizon.

The three scenarios

S1 Classic: peak shaving and self-consumption
Flat tariff, the battery is meant to smooth the load peak. Result: the optimiser does not build a single kWh. The reason is in the price sheet of the grid operator. Below 2,500 utilisation hours, the peak costs only €15.38 per kW and year here. That does not support a storage system.

S2 Smart: dynamic tariff and arbitrage with 1.15 MWh
Switch to Day-Ahead purchasing. The storage system becomes a price hunter: charge cheaply at night, buffer the PV midday peak, cover expensive hours from storage. Result: €290k lower electricity costs in the first year, a reduction of 25%. Initial investment €323k, net present value (NPV) €2.86 million over 20 years, payback period of around 1.1 years. A battery replacement at the end of the horizon is included.

S3 Multi-Use: the big combination with 5 MWh / 2.5 MW
Day-Ahead purchasing, arbitrage and atypische Netznutzung under § 19(2) StromNEV. The storage system does three jobs at once. In the HLZF (high-load time windows set by the German grid operator), it reduces the billable demand from 4,977 kW to 1,848 kW. That is 63% less, while the requirement at medium voltage is 20%. Result: €423k lower electricity costs in the first year, a reduction of 36%. Investment €1.4 million.

The twist: the regulation changes. So does the battery.

From 2029, the AgNes draft from the Bundesnetzagentur (BNetzA, Germany's Federal Network Agency) proposes a capacity charge to replace today's demand charge. That removes the lever from load peaks and atypische Netznutzung. The roadmap therefore recalculates the requirement from 2029: instead of 5 MWh, the site needs only 782 kWh.

What happens to the remaining 4.2 MWh? We calculate conservatively and write them off completely in 2029. Across both phases, this gives S3 an NPV of €2.0 million and a payback period of 3.9 years. S3 earns more than S2 in the first two years. Over 20 years, S2 comes out ahead.

The result at a glance

  • S1 Peak shaving: 0 kWh battery, no investment, no added value compared with today.
  • S2 Dynamic: 1.15 MWh, €323k initial investment, NPV €2.86 million, payback period 1.1 years.
  • S3 Multi-Use: 5 MWh / 2.5 MW, requirement of 782 kWh from €2029,1.4 million initial investment, NPV €2.0 million, payback period 3.9 years.

NPV in each case over 20 years at 8% WACC.

The takeaway

The answer to "How big does the battery need to be?" is not a number. It depends on the tariff, on the grid fees regime and on how long the rules apply. The 5 MWh earns well as long as atypische Netznutzung exists. After that, the site needs only a fraction of it. If you build big today, you need a plan for the capacity after 2029. Without that plan, the smaller storage system with a dynamic tariff is the better choice. With a quarter of the capital.

Assumptions

  • Site: industrial, medium voltage, 2.95 MW grid connection, 1,150 kWp existing PV. Grid operator Leitungspartner GmbH, grid fees 2026 (ene't).
  • Financing: 8% WACC, 20-year period under review (2027 to 2046).
  • Battery: €280/kWh, 7,500 full cycles, 2% calendar ageing per year, 0.5 C, 95% charge and 95% discharge efficiency. Lifetime calculated on a cycle basis.
  • Electricity purchasing: flat 13.0 ct/kWh plus 4.1 ct/kWh levies (base case) or Day-Ahead (EPEX 2025), each plus 2% per year.
  • Roadmap in two phases: 2027 to 2028 with interval metering demand charge, from 2029 with capacity charge (BNetzA draft GBK-25-01-1).

Note: the optimisation assumes perfect price and load foresight, so it shows the theoretical optimum. Uncertainties in market price development are not modelled. The AgNes parameters come from the current draft, and the final rates may differ. The results page in the platform credits the capacity no longer needed in 2029 with its residual value of €1.08 million, for example for resale or use at another site. S3 therefore ranks higher there. The figures on this page are calculated without this credit.

Sign up once and stay informed

Here is how you can calculate it:

What our customers calculate with it.

Commercial roof with 99 kWp: EEG 2027 calculated with feed-in limit and market premium

Model calculation for a commercial business with 500 MWh consumption and 99 kWp PV, under current law and under the draft EEG 2027. Because the business consumes 87% of its PV power itself, the feed-in limit barely changes the result. With a market premium, the benefit of the storage system rises by 10%.

87 %

Self-consumption rate of the PV system

0,3 %

of generation lies above the feed-in limit

19,2 %

Return on storage system with market premium (today 15.7%)

5.0 years

Payback period with market premium (today 6.0)
View Use Case →

20 MWp solar park: redispatch reservation calculated with and without a green electricity storage system

Model calculation for a 20 MWp solar park in the other Direktvermarktung (selling generated power via a direct marketer under the German EEG), under current law and with the redispatch reservation from the draft grid package. Without storage, the internal rate of return falls from 7.0 to 5.4%. With a green electricity storage system, it falls from 9.1 to 8.7%.

5,4 %

Rate of return without storage (today 7.0%)

2.5 GWh

additionally curtailed per year

60 %

of the revenue loss is offset by the storage system

8,7 %

Rate of return with storage (today 9.1%)
View Use Case →

AgNes capacity charge: what happens to the peak shaving calculation from 2029

Same site, same storage system, new grid fee system: the value contribution from peak shaving falls from €19,602/a to minus €4,258/a. The return falls from 11.8 to around 7 per cent.

11,8%

Return until 2028

7,3%

Return from 2029

-100%

Value contribution from peak shaving

43.5k

Additional costs p.a. from AgNes
View Use Case →

MiSpeL BTM with three stakeholders: The free grid connection as a business case

The site has a 750 kW grid connection and uses 413.7 kW of it. How a BESS investor uses the free 336 kW in line with MiSpeL, and what is left for the site and the direct marketer.

12,8%

Investor IRR

-44%

Site operating costs

103k

Total benefit per year

336 kW

Free grid connection
View Use Case →

C&I (commercial and industrial): one storage system, all revenues. The same storage system with and without MiSpeL

A commercial site with 750 kWp of PV is assessing a 2 MWh storage system. The same storage system, calculated twice: with full grid fees and levies on the trading electricity, and MiSpeL-compliant. The net present value (NPV) rises from €287,000 to €762,000.

132k

Savings/year (previously 80k)

762k

NPV (previously 287k)

3.8 yrs

Payback period (previously 6.3)

2,7×

NPV through MiSpeL
View Use Case →

From PPA to energy contracting: how the contract model decides the battery business case

Same site, same PV, but depending on the contract model, the business case ends up almost 10× larger. And the best part: the investor earns, the consumer saves, with no CAPEX of their own.

22,2%

Return

4.8 yrs

Payback period

7.59M

Net present value

-33%

Ongoing costs
View Use Case →