Use Cases
Explore a wide range of use cases showing how our software supports the design of battery storage in different applications.
Model calculation for a commercial business with 500 MWh consumption and 99 kWp PV, under current law and under the draft EEG 2027. Because the business consumes 87% of its PV power itself, the feed-in limit barely changes the result. With a market premium, the benefit of the storage system rises by 10%.

87 %
0,3 %
19,2 %
5.0 years
Model calculation for a 20 MWp solar park in the other Direktvermarktung (selling generated power via a direct marketer under the German EEG), under current law and with the redispatch reservation from the draft grid package. Without storage, the internal rate of return falls from 7.0 to 5.4%. With a green electricity storage system, it falls from 9.1 to 8.7%.
5,4 %
2.5 GWh
60 %
8,7 %
Same site, same storage system, new grid fee system: the value contribution from peak shaving falls from €19,602/a to minus €4,258/a. The return falls from 11.8 to around 7 per cent.
11,8%
7,3%
-100%
43.5k
The site has a 750 kW grid connection and uses 413.7 kW of it. How a BESS investor uses the free 336 kW in line with MiSpeL, and what is left for the site and the direct marketer.
12,8%
-44%
103k
336 kW
A commercial site with 750 kWp of PV is assessing a 2 MWh storage system. The same storage system, calculated twice: with full grid fees and levies on the trading electricity, and MiSpeL-compliant. The net present value (NPV) rises from €287,000 to €762,000.
132k
762k
3.8 yrs
2,7×
Same site, same PV, but depending on the contract model, the business case ends up almost 10× larger. And the best part: the investor earns, the consumer saves, with no CAPEX of their own.
22,2%
4.8 yrs
7.59M
-33%
5 MWp ground-mounted PV as grid-scale storage co-location: how a green power storage system optimises PV revenues, and how a second trading BESS scales the net present value (NPV) from €563k to €3.15 million.
13,5%
6.5 yrs
3.15M
1.14M
10 MW grid connection, standalone BESS: arbitrage alone delivers a net present value of €6.3 million. With FCR and aFRR in the stack, it becomes €17.3 million, and a grid operator's ramping requirement can be quantified to the euro.
40,9 %
17.3 million
2.4 yrs
2,7×
Sector coupling with BESS for commercial sites: how a heat pump, BESS and thermal storage as an integrated system save 78% of gas consumption, and how atypische Netznutzung raises the return to 18.5% without additional investment.
18,5%
5.2 yrs
751.2k
-15%
A 10 MW storage system in a wind grid, five contract scenarios: The rule-based feed-in limit from the grid model costs 0.6% of revenue. Excluding balancing services costs 33% and halves the net present value (NPV).
−0,6 %
−33 %
36,6 %
14.9 million
The same 10 MW storage system in the PV grid: the limit applies at midday from April to August, when power costs 35 €/MWh and the storage system is charging. Revenue loss 0.07%. Without a grid model, you would not know this.
−0,07 %
6,4 %
35 €/MWh
36,7 %
Industrial site in NRW with 9.3 GWh consumption and existing PV: three storage system scenarios across two grid fees regimes. The smaller storage system with a dynamic tariff beats 5 MWh Multi-Use.
323k
1.1 yrs
2.86M
-23%
Large industrial site with a near 1:1 ratio of electricity to heat demand: why BESS or thermal storage alone fall short of their potential, and why the combination with PV ends at a 72.2% return and a 1.4-year payback period.
72,2%
1.4 yrs
71.7M
-26%
Existing building with gas heating: a heat pump alone cuts operating costs by only 10%, while heat pump + battery raises the net present value from €42k to €353k.
11,8%
7.6 yrs
353k
-53%
Convert a diesel fleet to e-trucks without upgrading the grid connection: how a 229 kWh BESS makes the expansion unnecessary, and dynamic power purchasing drives the return to 30%.
30,3%
3.4 yrs
-64%
-43%
An EPC operates a PV system under an on-site PPA and wants to calculate an economically optimal Multi-Use storage system on a leasing basis for the customer.
543k
12,8%
+269k
7 years
6 scenarios show that flexibility-based grid fees alone do not carry the BESS investment. Only the combination with dynamic electricity procurement delivers an NPV of +€141,223 at a 12.1% return.
+141k
12,1%
7.5 yrs
57.7k
An industrial business wants to invest comprehensively in PV, storage and charging infrastructure for the first time. This is how the ROI is calculated.
28,9%
3.5 yrs
294.2k
951.1k
Five investments at the same available 5 MW of connection capacity: why the highest return (25.3%) and the highest net present value (€35.3 million) are not the same investment.

25,3 %
€35.3 million
3.9 yrs
5
Three stages front of the meter: how each additional revenue stream increases the net present value almost eightfold, from PV only to a mixed storage system with arbitrage.

10,2 %
1.3 million
~8×
3