04.12.2026

lcmd onsiteOur next webinar

Grid connection in 2031, charging park in 2027: how you bridge the gap with a storage system and still make the numbers work
Use Case

AgNes capacity charge: what happens to the peak shaving calculation from 2029

Same site, same storage system, new grid fee system: the value contribution from peak shaving falls from €19,602/a to minus €4,258/a. The return falls from 11.8 to around 7 per cent.

Use Case key data

11,8%

Return until 2028

7,3%

Return from 2029

-100%

Value contribution from peak shaving

43.5k

Additional costs p.a. from AgNes

An illustrative commercial site in Bochum with around 9 GWh annual consumption and 2,036 kW annual peak load is used as a demo case to model the AgNes draft determination of the Bundesnetzagentur (BNetzA, Germany's Federal Network Agency) against today's grid fee system. The inputs are a 15-minute load profile, Day-Ahead prices from the ENTSO-E Transparency Platform, an interest rate of 6 per cent and an analysis period of 20 years. All assumptions and data are illustrative and serve demonstration and validation purposes.

Starting point and question

Today the site pays a demand charge on its annual peak load, here €80.34 per kW, plus an energy charge of 2.29 ct/kWh in the category above 2,500 full-load hours. A single 15-minute value therefore determines the demand component for the whole year. Every peak shaving calculation rests on exactly this.

From 1 January 2029, the AgNes draft replaces this logic with a capacity charge and energy charge model. The site orders a capacity and pays a capacity charge on it. The ordered capacity must lie between 10 per cent of the previous year's annual peak load and the contractually agreed grid connection capacity. Consumption below the ordered capacity costs AP1, and every exceedance costs AP2, in the draft 200 to 350 per cent of AP1. The BNetzA itself describes the marginal cost of an exceedance as comparatively low.

So the question is not whether AgNes gets more expensive. It is this: what happens to a storage system whose business case rests a quarter on peak shaving when the load peak is no longer priced?

Methodology

In minimum.energy, four scenarios were calculated on the identical load profile. The capacity charge is available as a component in the software. The translation module converts today's demand-based grid fees into capacity charge logic.

1. Baseline under StromNEV, without storage (reference)
Operating costs of €1,566,751 a year. Of this, €368,844 is grid fees and €1,197,908 is electricity purchasing. Net present value (NPV) of €0 as reference.

2. Baseline under the capacity charge, without storage
Operating costs of €1,610,209 a year, so €43,458 more purely because of the system change, an increase of 2.8 per cent. More interesting than the total is the decision beneath it: the optimisation orders only 1,305 kW, which is 64 per cent of the annual peak load, and deliberately accepts 783,609 kWh of exceedance. The AP2 surcharge is cheaper than a higher ordered capacity. This is an optimisation result with no investment at all.

3. Storage system under StromNEV
Battery storage of 1,722.5 kWh and 861 kW, €280 per kWh, investment of €482,300, around 294 cycles a year. The storage system lowers the peak from 2,036 to 1,778 kW and optimises purchasing at the same time. Net present value (NPV) plus €259,443, return 11.8 per cent, payback period 7.6 years, first-year saving €65,204. Breakdown of the value contribution: €19,602 from peak shaving and €55,249 from purchase optimisation, less €9,646 operating costs.

4. Same storage system under the capacity charge
The purchasing benefit remains at €56,123 a year. The grid fee benefit does not just disappear, it reverses: minus €4,258. The storage system charges at high power in low-price hours and thereby creates additional exceedance volumes, 939,649 kWh instead of 783,609 kWh. First-year saving of €42,218, net present value (NPV) just positive, return around 6 per cent. The case does not tip over, but it sits at the cost-of-capital threshold.

Result

The key finding: under the capacity charge, the value contribution from peak shaving disappears completely. It goes from €19,602 a year to minus €4,258. What remains is purchase optimisation, and on its own it only just covers the investment.

An investor decides once, not twice. In 2027 and 2028 StromNEV continues to apply, and from 2029 the capacity charge. Calculated over the whole term, this gives a return of around 7.3 per cent instead of 11.8 per cent and a simple payback in the eleventh year instead of the eighth. If you calculate today with a payback period of 7.6 years, you rely on a revenue source that exists in this form for only two years.

What this means for the design

Three consequences follow directly from the calculation. First, the target variable shifts from power to ordered capacity. The question is no longer how strongly the storage system cuts the peak, but which ordered capacity is optimal against which exceedance volume. Second, the charging strategy becomes a cost factor. A storage system that charges unchecked in low-price hours buys electricity cheaply and grid fees expensively. Third, the grid connection capacity remains the hard limit, because the ordered capacity cannot exceed it.

And something else that often gets lost in the debate: the biggest single lever in the capacity charge regime costs nothing. Scenario 2 shows that the right ordered capacity needs no investment at all. Every site should make this calculation before the storage decision, not after.

Context

The basis is the draft determination on the general grid fee system of the Large Ruling Chamber Energy, reference GBK-25-01-1#3. This is a draft and not a decision, and the consultation runs until 18 September 2026. The announcement is planned for 1 January 2027, and the new system applies from 1 January 2029. Individual parameters, in particular the range of AP2, may still change.

The storage system in this case charges exclusively from the grid and does not feed in. It is therefore part of the consumption point and not a grid-connected storage system within the meaning of point 10.1 of the draft. A separate capacity fee on the grid connection capacity therefore does not apply here.

minimum.energy calculates both regimes on the same load profile and shows the difference instead of a forecast. If you want to know how robust your own storage calculation is after 2029, you can check it in minutes.

Sign up once and stay informed

Here is how you can calculate it:

What our customers calculate with it.

Commercial roof with 99 kWp: EEG 2027 calculated with feed-in limit and market premium

Model calculation for a commercial business with 500 MWh consumption and 99 kWp PV, under current law and under the draft EEG 2027. Because the business consumes 87% of its PV power itself, the feed-in limit barely changes the result. With a market premium, the benefit of the storage system rises by 10%.

87 %

Self-consumption rate of the PV system

0,3 %

of generation lies above the feed-in limit

19,2 %

Return on storage system with market premium (today 15.7%)

5.0 years

Payback period with market premium (today 6.0)
View Use Case →

20 MWp solar park: redispatch reservation calculated with and without a green electricity storage system

Model calculation for a 20 MWp solar park in the other Direktvermarktung (selling generated power via a direct marketer under the German EEG), under current law and with the redispatch reservation from the draft grid package. Without storage, the internal rate of return falls from 7.0 to 5.4%. With a green electricity storage system, it falls from 9.1 to 8.7%.

5,4 %

Rate of return without storage (today 7.0%)

2.5 GWh

additionally curtailed per year

60 %

of the revenue loss is offset by the storage system

8,7 %

Rate of return with storage (today 9.1%)
View Use Case →

AgNes capacity charge: what happens to the peak shaving calculation from 2029

Same site, same storage system, new grid fee system: the value contribution from peak shaving falls from €19,602/a to minus €4,258/a. The return falls from 11.8 to around 7 per cent.

11,8%

Return until 2028

7,3%

Return from 2029

-100%

Value contribution from peak shaving

43.5k

Additional costs p.a. from AgNes
View Use Case →

MiSpeL BTM with three stakeholders: The free grid connection as a business case

The site has a 750 kW grid connection and uses 413.7 kW of it. How a BESS investor uses the free 336 kW in line with MiSpeL, and what is left for the site and the direct marketer.

12,8%

Investor IRR

-44%

Site operating costs

103k

Total benefit per year

336 kW

Free grid connection
View Use Case →

C&I (commercial and industrial): one storage system, all revenues. The same storage system with and without MiSpeL

A commercial site with 750 kWp of PV is assessing a 2 MWh storage system. The same storage system, calculated twice: with full grid fees and levies on the trading electricity, and MiSpeL-compliant. The net present value (NPV) rises from €287,000 to €762,000.

132k

Savings/year (previously 80k)

762k

NPV (previously 287k)

3.8 yrs

Payback period (previously 6.3)

2,7×

NPV through MiSpeL
View Use Case →

From PPA to energy contracting: how the contract model decides the battery business case

Same site, same PV, but depending on the contract model, the business case ends up almost 10× larger. And the best part: the investor earns, the consumer saves, with no CAPEX of their own.

22,2%

Return

4.8 yrs

Payback period

7.59M

Net present value

-33%

Ongoing costs
View Use Case →