04.12.2026

lcmd onsiteOur next webinar

Grid connection in 2031, charging park in 2027: how you bridge the gap with a storage system and still make the numbers work
Use Case

Cross-market instead of arbitrage-only: How FCR and aFRR almost triple the net present value of a 10 MW BESS

10 MW grid connection, standalone BESS: arbitrage alone delivers a net present value of €6.3 million. With FCR and aFRR in the stack, it becomes €17.3 million, and a grid operator's ramping requirement can be quantified to the euro.

Use Case key data

40,9 %

Return (max.)

17.3 million

Net present value (max.)

2.4 yrs

Payback period (min.)

2,7×

vs. arbitrage-only

Starting point. A 10 MW grid connection and a standalone storage system in front of the meter. The question is not whether the battery pays off, but on which markets. Day-Ahead arbitrage only? Or cross-market with FCR and aFRR? And what does it cost if the grid operator limits the power change at the connection to 1% per minute?

Methodology

Four scenarios were optimised in minimum energy: arbitrage-only with and without a ramping requirement, cross-market with a fixed design (20 MWh / 10 MW), and cross-market with a freely optimised battery size. Assumptions: 2025 as the reference year, EPEX spot markets, balancing services prices from Regelleistung.net, WACC of 8%, 20 years, 2% degradation per year.

Result

Arbitrage alone delivers €1.22 million in revenue per year and a net present value of €6.3 million at a return of 21%. Add FCR and aFRR and revenue almost doubles to €2.29 million, with an identical battery and the same investment of €5.6 million. The net present value rises to €17.3 million, the return to 40.9%, and the payback period falls to 2.4 years. At 241 per year, the number of cycles is even lower than in arbitrage-only operation.

The ramping requirement of 1%/min costs €66,000 in revenue per year and around €560,000 in net present value in arbitrage operation. It is a technical constraint that nobody models in Excel. Here it is shown in euros, side by side with the other scenarios.

If you leave the design open, the optimiser selects 33.3 MWh and achieves a net present value of €19.4 million. The return falls to 30.6% with €3.7 million of additional investment. Whether net present value or capital efficiency matters more is the investor's call. The software shows both routes.

Conclusion

The business case is decided not by the battery, but by the market stack. The same €5.6 million investment delivers a net present value of €6.3 million or €17.3 million, depending on the marketing strategy. And grid operator requirements such as ramping are no longer a gut-feel risk, but a quantifiable item.

Sign up once and stay informed

Here is how you can calculate it:

What our customers calculate with it.

Commercial roof with 99 kWp: EEG 2027 calculated with feed-in limit and market premium

Model calculation for a commercial business with 500 MWh consumption and 99 kWp PV, under current law and under the draft EEG 2027. Because the business consumes 87% of its PV power itself, the feed-in limit barely changes the result. With a market premium, the benefit of the storage system rises by 10%.

87 %

Self-consumption rate of the PV system

0,3 %

of generation lies above the feed-in limit

19,2 %

Return on storage system with market premium (today 15.7%)

5.0 years

Payback period with market premium (today 6.0)
View Use Case →

20 MWp solar park: redispatch reservation calculated with and without a green electricity storage system

Model calculation for a 20 MWp solar park in the other Direktvermarktung (selling generated power via a direct marketer under the German EEG), under current law and with the redispatch reservation from the draft grid package. Without storage, the internal rate of return falls from 7.0 to 5.4%. With a green electricity storage system, it falls from 9.1 to 8.7%.

5,4 %

Rate of return without storage (today 7.0%)

2.5 GWh

additionally curtailed per year

60 %

of the revenue loss is offset by the storage system

8,7 %

Rate of return with storage (today 9.1%)
View Use Case →

AgNes capacity charge: what happens to the peak shaving calculation from 2029

Same site, same storage system, new grid fee system: the value contribution from peak shaving falls from €19,602/a to minus €4,258/a. The return falls from 11.8 to around 7 per cent.

11,8%

Return until 2028

7,3%

Return from 2029

-100%

Value contribution from peak shaving

43.5k

Additional costs p.a. from AgNes
View Use Case →

MiSpeL BTM with three stakeholders: The free grid connection as a business case

The site has a 750 kW grid connection and uses 413.7 kW of it. How a BESS investor uses the free 336 kW in line with MiSpeL, and what is left for the site and the direct marketer.

12,8%

Investor IRR

-44%

Site operating costs

103k

Total benefit per year

336 kW

Free grid connection
View Use Case →

C&I (commercial and industrial): one storage system, all revenues. The same storage system with and without MiSpeL

A commercial site with 750 kWp of PV is assessing a 2 MWh storage system. The same storage system, calculated twice: with full grid fees and levies on the trading electricity, and MiSpeL-compliant. The net present value (NPV) rises from €287,000 to €762,000.

132k

Savings/year (previously 80k)

762k

NPV (previously 287k)

3.8 yrs

Payback period (previously 6.3)

2,7×

NPV through MiSpeL
View Use Case →

From PPA to energy contracting: how the contract model decides the battery business case

Same site, same PV, but depending on the contract model, the business case ends up almost 10× larger. And the best part: the investor earns, the consumer saves, with no CAPEX of their own.

22,2%

Return

4.8 yrs

Payback period

7.59M

Net present value

-33%

Ongoing costs
View Use Case →