An example paper mill in Kreuzau (Westnetz GmbH, 3,200 kW grid connection, ~22 GWh/a consumption) serves as a demo case to calculate the economic impact of the BNetzA pilot concept for flexibility-based grid fees (February 2026). Data year 2025, WACC 8%, observation period 20 years. All assumptions and data are fictitious and serve purely for demonstration and validation purposes.
Starting point and question
Today, individual grid fee agreements under § 19(2) StromNEV are based on atypical grid use, meaning proof that you are not at maximum quarter-hourly demand during 15 high-load hours a year. The new BNetzA pilot concept replaces this logic with daily flexibility requirements in defined time windows: HLZF (high-load time windows set by the German grid operator) and NLZF. The question: does a BESS investment pay for itself through grid fee optimisation alone, and what changes when additional revenue sources are added?
Methodology
In minimum.energy, 6 scenarios were modelled and compared directly, from the starting point without a storage system to the integrated solution with a large BESS, dynamic electricity procurement and a grid connection increase.
1. Starting point: without BESS (reference)
Operating costs: €2,793,822/a. No storage system, no active flexibility management. Net present value (NPV): €0 (reference).
2. Model A: spot market flexibility (BESS 865 kWh / 433 kW, 114 cycles/a)
The storage system optimises against Day-Ahead price signals. Investment: €243,787. NPV: -€283,141, return: -9.1%, no payback period. Savings over 20 years: -€31,788. The grid fee model alone does not carry the investment.
3. Model B: grid-supportive flexibility / HLZF (BESS 574 kWh / 287 kW, 396 cycles/a)
The distribution system operator defines high-load and low-load time windows. Smaller storage system, lower investment: €162,192. NPV: -€227,557, return: -12.7%, no payback period. Savings over 20 years: -€121,580. Here too: no positive business case from the grid fee model alone.
4. Model A + dynamic electricity procurement (BESS 1,539 kWh / 770 kW, 344 cycles/a)
The storage system is used for grid fee optimisation and Day-Ahead arbitrage at the same time. Investment: €432,459. NPV: +€141,223, return: +12.1%, payback period: 7.5 years. First-year savings: €57,702. Operating costs: €2,736,120/a (-2%). Stacking revenue sources makes the difference.
5. Model B: HLZF + dynamic electricity procurement (BESS 1,448 kWh / 724 kW, 417 cycles/a)
A combination of time windows defined by the distribution system operator and arbitrage. Investment: €406,853. NPV: +€47,519, return: +9.6%, payback period: 8.1 years. Savings over 20 years: €957,561.
6. Model A (30%) + grid connection increase to 4.2 MW (BESS 5,564 kWh / 2,782 kW, 389 cycles/a)
Grid-scale storage with an extended grid connection and an aggressive arbitrage strategy. Investment: €1,114,258. NPV: +€817,195, return: +17%, payback period: 5.5 years. Savings over 20 years: €3,985,573. Operating costs: €2,592,535/a (-7%).
Result
The key finding: Flexibility-based grid fees alone (Model A or B) do not finance the BESS investment. The rebate covers operating costs, but not capital costs. Only the combination with dynamic electricity procurement turns the case positive. The jump from an NPV of -€228,000 (Model B alone) to +€141,000 (Model A + dynamic procurement) does not come from higher grid fee rebates, but from using the storage system at the same time to optimise electricity procurement.
minimum.energy calculates all 6 scenarios in minutes, with real grid fees, real HLZF time windows and realistic capital expenditure. Once AgNes (the BNetzA's digital signalling system) goes live, you can translate these cases directly into operating strategies.