Grid connection in 2031, charging park in 2027: how you bridge the gap with a storage system and still make the numbers work
Use Case

Flexibility-based grid fees: § 19 StromNEV vs. the AgNes pilot concept

6 scenarios show that flexibility-based grid fees alone do not carry the BESS investment. Only the combination with dynamic electricity procurement delivers an NPV of +€141,223 at a 12.1% return.

Use Case key data

+141k

NPV

12,1%

Return

7.5 yrs

Payback period

57.7k

First-year savings

An example paper mill in Kreuzau (Westnetz GmbH, 3,200 kW grid connection, ~22 GWh/a consumption) serves as a demo case to calculate the economic impact of the BNetzA pilot concept for flexibility-based grid fees (February 2026). Data year 2025, WACC 8%, observation period 20 years. All assumptions and data are fictitious and serve purely for demonstration and validation purposes.

Starting point and question

Today, individual grid fee agreements under § 19(2) StromNEV are based on atypical grid use, meaning proof that you are not at maximum quarter-hourly demand during 15 high-load hours a year. The new BNetzA pilot concept replaces this logic with daily flexibility requirements in defined time windows: HLZF (high-load time windows set by the German grid operator) and NLZF. The question: does a BESS investment pay for itself through grid fee optimisation alone, and what changes when additional revenue sources are added?

Methodology

In minimum.energy, 6 scenarios were modelled and compared directly, from the starting point without a storage system to the integrated solution with a large BESS, dynamic electricity procurement and a grid connection increase.

1. Starting point: without BESS (reference)
Operating costs: €2,793,822/a. No storage system, no active flexibility management. Net present value (NPV): €0 (reference).

2. Model A: spot market flexibility (BESS 865 kWh / 433 kW, 114 cycles/a)
The storage system optimises against Day-Ahead price signals. Investment: €243,787. NPV: -€283,141, return: -9.1%, no payback period. Savings over 20 years: -€31,788. The grid fee model alone does not carry the investment.

3. Model B: grid-supportive flexibility / HLZF (BESS 574 kWh / 287 kW, 396 cycles/a)
The distribution system operator defines high-load and low-load time windows. Smaller storage system, lower investment: €162,192. NPV: -€227,557, return: -12.7%, no payback period. Savings over 20 years: -€121,580. Here too: no positive business case from the grid fee model alone.

4. Model A + dynamic electricity procurement (BESS 1,539 kWh / 770 kW, 344 cycles/a)
The storage system is used for grid fee optimisation and Day-Ahead arbitrage at the same time. Investment: €432,459. NPV: +€141,223, return: +12.1%, payback period: 7.5 years. First-year savings: €57,702. Operating costs: €2,736,120/a (-2%). Stacking revenue sources makes the difference.

5. Model B: HLZF + dynamic electricity procurement (BESS 1,448 kWh / 724 kW, 417 cycles/a)
A combination of time windows defined by the distribution system operator and arbitrage. Investment: €406,853. NPV: +€47,519, return: +9.6%, payback period: 8.1 years. Savings over 20 years: €957,561.

6. Model A (30%) + grid connection increase to 4.2 MW (BESS 5,564 kWh / 2,782 kW, 389 cycles/a)
Grid-scale storage with an extended grid connection and an aggressive arbitrage strategy. Investment: €1,114,258. NPV: +€817,195, return: +17%, payback period: 5.5 years. Savings over 20 years: €3,985,573. Operating costs: €2,592,535/a (-7%).

Result

The key finding: Flexibility-based grid fees alone (Model A or B) do not finance the BESS investment. The rebate covers operating costs, but not capital costs. Only the combination with dynamic electricity procurement turns the case positive. The jump from an NPV of -€228,000 (Model B alone) to +€141,000 (Model A + dynamic procurement) does not come from higher grid fee rebates, but from using the storage system at the same time to optimise electricity procurement.

minimum.energy calculates all 6 scenarios in minutes, with real grid fees, real HLZF time windows and realistic capital expenditure. Once AgNes (the BNetzA's digital signalling system) goes live, you can translate these cases directly into operating strategies.

Sign up once and stay informed

Here is how you can calculate it:

What our customers calculate with it.

Commercial roof with 99 kWp: EEG 2027 calculated with feed-in limit and market premium

Model calculation for a commercial business with 500 MWh consumption and 99 kWp PV, under current law and under the draft EEG 2027. Because the business consumes 87% of its PV power itself, the feed-in limit barely changes the result. With a market premium, the benefit of the storage system rises by 10%.

87 %

Self-consumption rate of the PV system

0,3 %

of generation lies above the feed-in limit

19,2 %

Return on storage system with market premium (today 15.7%)

5.0 years

Payback period with market premium (today 6.0)
View Use Case →

20 MWp solar park: redispatch reservation calculated with and without a green electricity storage system

Model calculation for a 20 MWp solar park in the other Direktvermarktung (selling generated power via a direct marketer under the German EEG), under current law and with the redispatch reservation from the draft grid package. Without storage, the internal rate of return falls from 7.0 to 5.4%. With a green electricity storage system, it falls from 9.1 to 8.7%.

5,4 %

Rate of return without storage (today 7.0%)

2.5 GWh

additionally curtailed per year

60 %

of the revenue loss is offset by the storage system

8,7 %

Rate of return with storage (today 9.1%)
View Use Case →

AgNes capacity charge: what happens to the peak shaving calculation from 2029

Same site, same storage system, new grid fee system: the value contribution from peak shaving falls from €19,602/a to minus €4,258/a. The return falls from 11.8 to around 7 per cent.

11,8%

Return until 2028

7,3%

Return from 2029

-100%

Value contribution from peak shaving

43.5k

Additional costs p.a. from AgNes
View Use Case →

MiSpeL BTM with three stakeholders: The free grid connection as a business case

The site has a 750 kW grid connection and uses 413.7 kW of it. How a BESS investor uses the free 336 kW in line with MiSpeL, and what is left for the site and the direct marketer.

12,8%

Investor IRR

-44%

Site operating costs

103k

Total benefit per year

336 kW

Free grid connection
View Use Case →

C&I (commercial and industrial): one storage system, all revenues. The same storage system with and without MiSpeL

A commercial site with 750 kWp of PV is assessing a 2 MWh storage system. The same storage system, calculated twice: with full grid fees and levies on the trading electricity, and MiSpeL-compliant. The net present value (NPV) rises from €287,000 to €762,000.

132k

Savings/year (previously 80k)

762k

NPV (previously 287k)

3.8 yrs

Payback period (previously 6.3)

2,7×

NPV through MiSpeL
View Use Case →

From PPA to energy contracting: how the contract model decides the battery business case

Same site, same PV, but depending on the contract model, the business case ends up almost 10× larger. And the best part: the investor earns, the consumer saves, with no CAPEX of their own.

22,2%

Return

4.8 yrs

Payback period

7.59M

Net present value

-33%

Ongoing costs
View Use Case →