Commercial site with an existing PV system (1,000 kWp), an electricity demand of 4,749 MWh/a and a heat demand of 1,200 MWh/a, so far covered almost entirely by gas (1,333 MWh/a). Operating costs in the baseline: €831,833/a. Calculated with MiSpeL (German BNetzA rules for storage that charges both grid power and on-site renewable power) 2026 (beta), WACC 6%, 20 years.
Scenario 1: Heat pump + BESS + thermal storage
The heat pump (581.1 kW), battery storage (1,688.6 kWh) and thermal storage (462 kWh) are designed as an integrated system. The thermal storage decouples heat pump operation from the actual heat demand. The heat pump can run specifically when electricity is cheap. In parallel, the battery optimises self-consumption and load peaks.
Gas consumption falls from 1,333 to 294 MWh/a (−78%). Operating costs: €720,082/a (−13%). Net present value (NPV): €623,854, return: 16.4%, payback period: 5.8 years.
Scenario 2: Scenario 1 + atypische Netznutzung
Identical components, identical investment (€637,241), only one difference: atypische Netznutzung is activated. The battery specifically shaves load peaks in the HLZF (high-load time windows set by the German grid operator), which reduces the grid connection from 1,011.4 to 918.8 kW and permanently lowers grid fees.
Operating costs: €706,860/a (−15%). NPV: €751,196, return: 18.5%, payback period: 5.2 years.
Result
With an identical investment, configuring atypische Netznutzung correctly raises the return from 16.4% to 18.5%. That equals +€127,000 NPV and a payback period 0.6 years shorter. If you don't know about this lever or don't plan for it, you systematically leave return on the table. minimum.energy identifies and calculates this effect automatically.