04.12.2026

lcmd onsiteOur next webinar

Grid connection in 2031, charging park in 2027: how you bridge the gap with a storage system and still make the numbers work
Use Case

Sector coupling with BESS for commercial sites: heat pump, battery and thermal storage as one system

Sector coupling with BESS for commercial sites: how a heat pump, BESS and thermal storage as an integrated system save 78% of gas consumption, and how atypische Netznutzung raises the return to 18.5% without additional investment.

Use Case key data

18,5%

Return

5.2 yrs

Payback period

751.2k

Net present value (NPV)

-15%

Operating costs

Commercial site with an existing PV system (1,000 kWp), an electricity demand of 4,749 MWh/a and a heat demand of 1,200 MWh/a, so far covered almost entirely by gas (1,333 MWh/a). Operating costs in the baseline: €831,833/a. Calculated with MiSpeL (German BNetzA rules for storage that charges both grid power and on-site renewable power) 2026 (beta), WACC 6%, 20 years.

Scenario 1: Heat pump + BESS + thermal storage

The heat pump (581.1 kW), battery storage (1,688.6 kWh) and thermal storage (462 kWh) are designed as an integrated system. The thermal storage decouples heat pump operation from the actual heat demand. The heat pump can run specifically when electricity is cheap. In parallel, the battery optimises self-consumption and load peaks.

Gas consumption falls from 1,333 to 294 MWh/a (−78%). Operating costs: €720,082/a (−13%). Net present value (NPV): €623,854, return: 16.4%, payback period: 5.8 years.

Scenario 2: Scenario 1 + atypische Netznutzung

Identical components, identical investment (€637,241), only one difference: atypische Netznutzung is activated. The battery specifically shaves load peaks in the HLZF (high-load time windows set by the German grid operator), which reduces the grid connection from 1,011.4 to 918.8 kW and permanently lowers grid fees.

Operating costs: €706,860/a (−15%). NPV: €751,196, return: 18.5%, payback period: 5.2 years.

Result

With an identical investment, configuring atypische Netznutzung correctly raises the return from 16.4% to 18.5%. That equals +€127,000 NPV and a payback period 0.6 years shorter. If you don't know about this lever or don't plan for it, you systematically leave return on the table. minimum.energy identifies and calculates this effect automatically.

Sign up once and stay informed

What our customers calculate with it.

Commercial roof with 99 kWp: EEG 2027 calculated with feed-in limit and market premium

Model calculation for a commercial business with 500 MWh consumption and 99 kWp PV, under current law and under the draft EEG 2027. Because the business consumes 87% of its PV power itself, the feed-in limit barely changes the result. With a market premium, the benefit of the storage system rises by 10%.

87 %

Self-consumption rate of the PV system

0,3 %

of generation lies above the feed-in limit

19,2 %

Return on storage system with market premium (today 15.7%)

5.0 years

Payback period with market premium (today 6.0)
View Use Case →

20 MWp solar park: redispatch reservation calculated with and without a green electricity storage system

Model calculation for a 20 MWp solar park in the other Direktvermarktung (selling generated power via a direct marketer under the German EEG), under current law and with the redispatch reservation from the draft grid package. Without storage, the internal rate of return falls from 7.0 to 5.4%. With a green electricity storage system, it falls from 9.1 to 8.7%.

5,4 %

Rate of return without storage (today 7.0%)

2.5 GWh

additionally curtailed per year

60 %

of the revenue loss is offset by the storage system

8,7 %

Rate of return with storage (today 9.1%)
View Use Case →

AgNes capacity charge: what happens to the peak shaving calculation from 2029

Same site, same storage system, new grid fee system: the value contribution from peak shaving falls from €19,602/a to minus €4,258/a. The return falls from 11.8 to around 7 per cent.

11,8%

Return until 2028

7,3%

Return from 2029

-100%

Value contribution from peak shaving

43.5k

Additional costs p.a. from AgNes
View Use Case →

MiSpeL BTM with three stakeholders: The free grid connection as a business case

The site has a 750 kW grid connection and uses 413.7 kW of it. How a BESS investor uses the free 336 kW in line with MiSpeL, and what is left for the site and the direct marketer.

12,8%

Investor IRR

-44%

Site operating costs

103k

Total benefit per year

336 kW

Free grid connection
View Use Case →

C&I (commercial and industrial): one storage system, all revenues. The same storage system with and without MiSpeL

A commercial site with 750 kWp of PV is assessing a 2 MWh storage system. The same storage system, calculated twice: with full grid fees and levies on the trading electricity, and MiSpeL-compliant. The net present value (NPV) rises from €287,000 to €762,000.

132k

Savings/year (previously 80k)

762k

NPV (previously 287k)

3.8 yrs

Payback period (previously 6.3)

2,7×

NPV through MiSpeL
View Use Case →

From PPA to energy contracting: how the contract model decides the battery business case

Same site, same PV, but depending on the contract model, the business case ends up almost 10× larger. And the best part: the investor earns, the consumer saves, with no CAPEX of their own.

22,2%

Return

4.8 yrs

Payback period

7.59M

Net present value

-33%

Ongoing costs