30-minute initial call
Free of charge and non-binding
The platform
The connection point is the scarce resource. Behind the meter, the storage system cuts costs. In front of the meter, it generates revenue. minimum energy calculates both in one system.
One revenue space, optimised simultaneously, not one after another.

Capture systems, optimise economics, deliver results
The same structure as on the home page, here with the depth behind it.
Digital Twin · Technology Portfolio · Multi-Asset
Model assets and loads.
Technology Sizing · Multi-Use · Cross-Market · Stakeholder · Tariff Manager
Calculate the economic optimum.
Custom Dashboards · Whitelabel · Magic Links · Financial Reporting
Bring results into the quote.
Chapter 01
Model assets and loads: reconstruct the load profile, choose the technology portfolio and calculate everything as one system instead of nine separate calculations.
Usually only the grid consumption profile is available, and actual consumption is missing. minimum energy reconstructs it from grid consumption, PV generation and grid feed-in, and automatically fits the profiles to the real energy balance.
Commercial and industrial (C&I): retrofitting BESS, Multi-Use scenarios
View →
PV, wind, CHP, biogas plant and heat pump, plus battery and thermal storage and charging infrastructure. Instead of a separate tool for each technology: select, parameterise, calculate together.
Sector coupling with BESS for commercial sites: heat pump, battery and thermal storage as one system
View →
Efficiencies, C-rate, self-discharge, cycle budget and degradation are parameters, not assumptions. You can optimise capacity freely or calculate it using the manufacturers' real module sizes.
Convert a diesel fleet to e-trucks: BESS avoids grid expansion
View →
Create the project, parameterise components, calculate and compare variants: by voice or text. Every step lands in the System Builder, every number keeps its source and assumption register. The assistant runs on EU servers and is GDPR-compliant.
View →
Chapter 02
All revenue and savings paths optimised simultaneously, behind the meter and in front of it, in the same calculation.
One storage system, four uses: optimised simultaneously instead of calculated one after another. C&I site with 750 kWp PV and 1,200 kWh storage.
Bar height = energy volume · one full reference year in 15-minute resolution, all markets simultaneously
Direktvermarktung, arbitrage and balancing services optimised simultaneously. The same mechanics, a different order of magnitude. Grid-scale storage co-location with a PV park, green electricity storage system and trading BESS.
Bar height = energy volume · one full reference year in 15-minute resolution, all markets simultaneously
One model, two orders of magnitude: the same optimiser, the same resolution, the same presentation, just a different dataset.
Efficiencies, C-rate, self-discharge, cycle budget and degradation are parameters, not assumptions. You can optimise capacity freely or calculate with the manufacturers' real module sizes.
C&I: MiSpeL-compliant storage sizing for arbitrage 2026
View →
Stored price paths over the project term, separation of supplier power and market activity in line with MiSpeL (German BNetzA rules for storage that charges both grid power and on-site renewable power), and a backtest over a full reference year. The revenue forecast becomes traceable rather than asserted.
Cross-market instead of arbitrage-only: How FCR and aFRR almost triple the net present value of a 10 MW BESS
View →
Own investment, leasing, energy contracting, on-site PPA and Energy-as-a-Service in one run, from the investor, user and EPC perspective. The distribution of value becomes visible.
From PPA to energy contracting: how the contract model decides the battery business case
View →
Baseload tariff, spot market, dynamic tariffs and off-site PPA directly comparable, each including the optimal storage system. Separate calculations become one basis for your decision.
Model a baseload tariff and off-site PPA in your portfolio
View →
The backtest delivers the reference year. The Scenario Modeler splits the lifetime into phases, for example StromNEV, today's grid fee ordinance, until 2028 and AgNes, the Federal Network Agency's draft for new grid fees, from 2029. Shown live in the webinar of 5 November, held in German.
AgNes capacity charge: what happens to the peak shaving calculation from 2029
View →
Chapter 03
Show them in the meeting, export them in your corporate design, share them as a link and back them up to the source for the bank.
minimum energy runs on screen during the customer meeting. Each user builds the dashboard their conversation needs: widgets via drag & drop, notes on every tile, every number with its derivation.
Import your own PPTX template, populate it automatically, export. Executive summary and technical report, plus CSV, XLSX, JSON and API for all common EMS.
Commercial and industrial (C&I): retrofitting BESS, Multi-Use scenarios
View →
Instead of PDF attachments in the email chain: one link to the scenario comparison. Cumulative cash flow, break-even and net present value (NPV) stay interactive, and this view works unchanged for any project size.
Not a pitch document but an audit trail: every scenario is exported as a financing report in which every input is stored as a Q-ID with its value and source.
What we calculate with
15-minute values over a full reference year. Lifetime calculation over 15+ years, including degradation and cycle budget.
Load profiles, weather and generation data, Day-Ahead, Intraday and balancing services prices as stored time series.
You create your own products yourself, with technical parameters and sales prices. The calculation uses what you actually offer.
Process
The three phases with their five sub-steps. 7 plus 7 plus 6 makes the 20 minutes, and you can check the sum.
Choose the site, load the load profile in 15-minute resolution, enter tariffs and grid fees. Optionally add PV potential, charge points and heat generators.
Costs, payback period, self-sufficiency or load peaks: what is to be optimised, and under which constraints.
The platform searches for storage sizes and other assets (kWp/kWh/kW) as well as operating strategies, individually or in Multi-Use, mathematically optimised instead of estimated sequentially.
In front of the meter, market scenarios and the backtest over a reference year are added. This step then takes longer, but the result stands up to scrutiny by a bank.
Scenarios side by side: investment, operation, CO₂, sensitivities. Transparent, traceable, no Excel chaos.
Results as a report, time series or API. For quotes, board papers or further processing in the EMS.
Bring a sample project, behind or in front of the meter. Three routes, depending on how far along you are.
30 minutes, free of charge and non-binding. We calculate live with your numbers.
Charging park in 2027, full grid connection only in 2031? In the webinar: how you size the storage system around the demand ramp-up and whether the project pays off.