For ground-mounted systems, the most relevant part of the current legislation is the redispatch reservation in the draft grid package. Under it, new systems in grid congestion areas would have to accept part of the curtailment by the grid operator without compensation. The repayment via contracts for difference in the EEG 2027 only affects systems with a market premium and plays no role for a solar park in the other Direktvermarktung. In the webinar on 19 November, Felix Kullmann calculated what the redispatch reservation costs a solar park and how much of that a storage system offsets.
Note on status: The basis is the drafts of the EEG 2027 and the grid package, and neither has been adopted. How the redispatch reservation will finally be designed is still open. The calculation is a model calculation on our platform, not a customer reference. Status: 22 November 2026.
The solar park
The park has 20 MWp and a grid connection of 20 MW, and the investment is €12 million. The power is sold on the Day-Ahead market without a market premium, calculated with 2025 prices over 20 years at a 6% discount rate. The redispatch reservation is modelled by a random, stepped curtailment profile, designed for up to 20% uncompensated curtailment. The optional green electricity storage system has 44.6 MWh and 22.3 MW, costs €8.9 million and charges only from the PV system.
Without storage, the rate of return falls to 5.4%
Under current law, the park sells 15.8 GWh a year and earns €1.16 million from it, with an internal rate of return of 7.0% and a payback period of 11.6 years. Around 6.9 GWh are already curtailed by the park itself today, about 90% of that in quarter-hours with prices at or below zero. With the curtailment profile, it additionally may not feed into the grid, or only partly, in 1,490 quarter-hours, mainly at midday in summer. This loses 2.5 GWh, revenue falls by around €150,000 a year, and the internal rate of return drops to 5.4%. The payback period moves to 13.5 years, and the net present value (NPV) turns negative at a 6% discount rate.
With a green electricity storage system, most of the revenue is retained
Under current law, the storage system takes in around 12 GWh of PV electricity, mainly at midday, and later sells it at an average of 16.3 cents per kWh. Revenue rises to €2.47 million a year, and for the total investment of €20.9 million the internal rate of return is 9.1%. With the redispatch reservation, revenue falls by only around €59,000 a year and the rate of return to 8.7%. The grid operator limits grid feed-in at the grid connection, and the storage system may keep charging during that time. Of the 3.1 GWh that the PV system could generate in the curtailed quarter-hours, it takes in 2.3 GWh. Over the year, it offsets around 60% of the revenue loss.
Context
The optimisation knows prices and curtailment times in advance. In practice, a storage system only takes in curtailed power deliberately if it has capacity free in time and the measure is announced early enough. The share offset is therefore an upper limit, and for a specific project you should calculate several random curtailment profiles and look at the range. Arbitrage with grid electricity and balancing services are not included. Both scenarios use the same storage system. For new solar parks in congestion areas, the storage system therefore belongs in the initial design. For commercial rooftops with high self-consumption, the effect of the legislative package is much smaller, as the commercial rooftop case shows. All scenarios are on the results page, and the webinar recording shows both cases.