The robust FCA. Rule-based, not rigid.

One storage system, two grid areas, five contracts. We calculated what each clause of a flexible connection agreement costs the storage system.
iPhone mockup
Dashboard mockupDashboard mockup

0.6%. That is all the rule-based limit costs.

For a wind-dominated grid area in North Frisia and a PV-dominated one in Lower Bavaria, inframind calculated how much power the grid can absorb in each quarter-hour. minimum energy optimised a storage system with 10 MW and 20 MWh using this limit as a constraint across all 35,040 quarter-hours of 2025, against unrestricted operation and against four contract variants. The result is a price per clause instead of a verdict on "the FCA".

Three findings from the report:

  • The rule-based limit costs almost nothing. 0.6% of revenue in North Frisia, 0.07% in Lower Bavaria. The limit applies when there is a lot of wind or sun on the grid and power is cheap. That is exactly when the storage system does not want to feed in.
  • Rigid clauses cost a third or more. Excluding balancing services costs 33% of revenue and halves the net present value (NPV). Ramp rates of 2 and 0.5% per minute add a further 4% and 14%.
  • North and south need different conversations. In the north, the limit applies around the clock from September to January. In the south, it applies at midday from April to August. In the north, the conversation about balancing services is worth having. In the south, look at everything else the contract regulates rigidly.

You also get the three clauses that belong on the table, with their price from the calculation, and our position for grid operators and connection customers. The report follows on from Grid Connection Report Vol. 1.

Download the report for free

FCA in the Lower Bavaria PV grid: the limit applies at midday, when the storage system is charging. Loss 0.07%

The same 10 MW storage system in the PV grid: the limit applies at midday from April to August, when power costs 35 €/MWh and the storage system is charging. Revenue loss 0.07%. Without a grid model, you would not know this.

−0,07 %

Revenue with rule-based limit

6,4 %

of quarter-hours in which the limit applies

35 €/MWh

Return with limit

36,7 %

Return with limit
View Use Case →

FCA in the Nordfriesland wind grid: The rule-based feed-in limit costs 0.6%, excluding balancing services 33

A 10 MW storage system in a wind grid, five contract scenarios: The rule-based feed-in limit from the grid model costs 0.6% of revenue. Excluding balancing services costs 33% and halves the net present value (NPV).

−0,6 %

Revenue with rule-based limit

−33 %

Revenue without balancing services

36,6 %

Net present value (NPV) with limit

14.9 million

Net present value (NPV) with limit
View Use Case →