30-minute initial call
Free of charge and non-binding



For a wind-dominated grid area in North Frisia and a PV-dominated one in Lower Bavaria, inframind calculated how much power the grid can absorb in each quarter-hour. minimum energy optimised a storage system with 10 MW and 20 MWh using this limit as a constraint across all 35,040 quarter-hours of 2025, against unrestricted operation and against four contract variants. The result is a price per clause instead of a verdict on "the FCA".
Three findings from the report:
You also get the three clauses that belong on the table, with their price from the calculation, and our position for grid operators and connection customers. The report follows on from Grid Connection Report Vol. 1.
Use Case
The same 10 MW storage system in the PV grid: the limit applies at midday from April to August, when power costs 35 €/MWh and the storage system is charging. Revenue loss 0.07%. Without a grid model, you would not know this.
−0,07 %
6,4 %
35 €/MWh
36,7 %
Use Case
A 10 MW storage system in a wind grid, five contract scenarios: The rule-based feed-in limit from the grid model costs 0.6% of revenue. Excluding balancing services costs 33% and halves the net present value (NPV).
−0,6 %
−33 %
36,6 %
14.9 million