Grid connection in 2031, charging park in 2027: how you bridge the gap with a storage system and still make the numbers work
Regulation
/
EEG 2027
Entwurf
Government draft of 29 July 2026, entry into force planned for 1 January 2027
Primary source:
Government draft EEG 2027, Bundestag printed paper 21/7867
→

EEG 2027, Direktvermarktung and refinancing contribution

What the rule says

According to the government draft of 29 July 2026, the fixed feed-in tariff ends for new PV systems from 2027, and new systems are to move into Direktvermarktung. Roofs under 100 kW could then permanently feed in only half of their output (§ 9(2b)). Systems from 100 kW pay a refinancing contribution if the market value is above the applicable value (§ 21d).

The Federal Government adopted the draft on 29 July 2026. It is before the Bundestag as printed paper 21/7867. The first reading took place on 24 September 2026. The second and third readings have not yet been scheduled. According to trade media on 6 November, the Bundesrat will take it up on 18 December 2026 at the earliest. The support rules are also subject to EU state aid approval (§ 104 EEG 2027-E).

This rule has not been adopted yet. The figures on this page are based on the stated status and may change significantly before adoption.

Status of this page
Responsible
Leander
Assumptions
Design
Government draft 07/2026
Price book
Next step
Second and third readings in the Bundestag, according to trade media in December 2026, Bundesrat on 18 December 2026 at the earliest

What the rule changes in the reference case

The same site, once without and once with the rule.

A
Consumers under 10 GWh
BTM
100,000 kWh to 10 GWh/a · interval metering · medium voltage
Preliminary calculation
Existing PV stays under the old rules, and the storage system barely notices
In the reference case with 5.3 GWh of grid consumption and existing PV in the market premium, the storage system saves €127,732 in the first year, of which only €324 comes from the market premium. According to the draft, the PV stays under the current law (§ 100(1)), so the storage case barely changes. If you add new PV of 100 kW or more in 2027, you should model the refinancing contribution as a separate scenario.
Open financing report →
B
Consumers over 10 GWh
BTM
from 10 GWh/a · interval metering · medium to high voltage
Preliminary calculation
PV surplus runs without support, so the support rules do not apply
In the reference case, the storage system saves €337,025 in the first year. The PV surplus of 2.6 GWh goes to the Day-Ahead market without a market premium, so the support rules in the draft do not apply here. The value of the storage system comes from grid fees, electricity purchasing and market sales, and the draft changes none of that.
Open financing report →
C
Generators and storage systems
FTM
own grid connection from approx. 1 MW · medium to high voltage
Preliminary calculation
Park sells without support, storage revenue remains unaffected
In the reference case with 20 MWp of ground-mounted PV, the storage system generates €1.22 million in additional revenue in the first year. In the model, the park sells on the Day-Ahead market without support, so the refinancing contribution under § 21d does not apply. If you plan with an award from the tender, calculate the draft as a separate scenario alongside the calculation without support.
Open financing report →

Result and recommendation

Until it enters into force, the EEG 2023 applies with the amendments from the Solarspitzengesetz (German solar peak law of February 2025). Its EU state aid approval expires on 31 December 2026 (decision SA.102084). For systems commissioned in early 2027, a phase without payable support is, in our view, a realistic scenario.

Recommendation: Run the draft as a scenario alongside current law, not as an assumption. For roofs under 100 kW, check the 50% limit. From 100 kW, check the refinancing contribution and the exit under § 21e. According to the draft, systems commissioned before 1 January 2027 generally remain under current law (§ 100(1)).

In the three reference cases, the draft barely moves the storage case. It mainly changes the calculation for new PV, not the storage system next to it. The calculation with and without the draft follows.

Change history

Every version stays available to read, with its date and what has changed.

A · Consumers under 10 GWh
B · Consumers over 10 GWh
C · Generators and storage systems
October 1, 2026
Determination 10/2026
BNetzA adopts the determination. Transition period until the end of September 2027. Until then, only with the consent of the grid operator and the metering point operator.
Dr.-Ing. Leander König-Kotzur
MiSpeL
September 24, 2026
Government draft 07/2026
First reading in the Bundestag, referred to the Committee on Economic Affairs and Energy. The hearing was held on 5 October 2026.
Dr.-Ing. Leander König-Kotzur
EEG 2027
August 6, 2026
Draft determination 08/2026
The Bundesnetzagentur publishes the full draft determination and starts the consultation.
Dr.-Ing. Leander König-Kotzur
AgNes
May 27, 2026
Interim status 05/2026
BNetzA presents its interim status. From 2029, generators are to pay a grid fee of around €4 to €7 per kW and year.
Dr.-Ing. Leander König-Kotzur
AgNes
September 18, 2025
Consultation draft 09/2025
BNetzA puts the key points and the draft determination out for consultation.