Grid connection in 2031, charging park in 2027: how you bridge the gap with a storage system and still make the numbers work
Use Case

Commercial roof with 99 kWp: EEG 2027 calculated with feed-in limit and market premium

Model calculation for a commercial business with 500 MWh consumption and 99 kWp PV, under current law and under the draft EEG 2027. Because the business consumes 87% of its PV power itself, the feed-in limit barely changes the result. With a market premium, the benefit of the storage system rises by 10%.

Use Case key data

87 %

Self-consumption rate of the PV system

0,3 %

of generation lies above the feed-in limit

19,2 %

Return on storage system with market premium (today 15.7%)

5.0 years

Payback period with market premium (today 6.0)

The draft EEG 2027 changes two points for new rooftop systems between 25 and 100 kW, and both show up in every design. Grid feed-in is to be limited to 50% of installed capacity, and Direktvermarktung (selling generated power via a direct marketer under the German EEG) with a market premium is to apply instead of the fixed feed-in tariff. In the webinar on 19 November, Felix Kullmann used a commercial roof to calculate what both mean for the PV system and for a storage system.

Note on status: the calculation uses the government draft (Bundestag printed paper 21/7867). It has not been adopted, and it is open whether the feed-in limit and market premium will come in this form for this size class. The calculation is a model calculation on our platform, not a customer reference. Status: 22 November 2026.

The site

The business in Bochum consumes 500 MWh a year, and its peak grid draw is 146 kW. The PV system has 99 kWp and generates around 112 MWh a year, of which the business consumes 87% itself. Electricity costs 16 cents per kWh, plus a demand charge of €80.34 per kW. The optional storage system has 60 kWh and costs €15,000. The fixed tariff and the market premium are both set at 6.2 cents per kWh, so the calculation shows only the change of mechanism.

The feed-in limit affects only a few hours a year

Because the business consumes most of its PV power itself, grid feed-in exceeds the limit of 49.5 kW in only 230 quarter-hours, almost all of them around midday between March and August. 379 kWh a year lie above the limit. That is 0.3% of generation and, at the applicable value, around €24. For systems with lower self-consumption, the limit matters correspondingly more.

The storage system pays off even under current law

With a storage system, the site's energy costs fall by €2,546 a year, with an internal rate of return of 15.7% and a payback period of 6.0 years. Most of this comes from grid fees, because the storage system cuts the peak grid draw from 146 to 119 kW. The feed-in limit does not change this effect.

With a market premium, the timing of feed-in counts

With a fixed tariff, every kWh fed in is worth the same, except in quarter-hours with negative prices. With a market premium, the system receives the Day-Ahead price of the respective quarter-hour plus the premium, which only tops up to the monthly solar market value. This makes it worthwhile to shift PV power from midday into more expensive hours. Even without a storage system, costs fall by €237 a year as a result. In this scenario the storage system charges only PV power, feeds in 3,948 kWh a year at higher prices, and its benefit rises from €2,546 to €2,796 a year. Compared with today's reference, the internal rate of return is 19.2% and the payback period is 5.0 years. This requires a metering concept that the grid operator accepts for the green-power storage system.

As a mixed-use storage system under MiSpeL (German BNetzA rules for storage that charges both grid power and on-site renewable power), the same storage system may also charge grid electricity. It then lowers the peak grid draw further to 116 kW, which brings another €216 a year. There is no more to gain with a flat electricity tariff, because there is no procurement to optimise.

Assessment

For a commercial roof under 100 kWp with high self-consumption, the draft barely changes the economic viability, and under the market premium a storage system becomes somewhat more valuable. Not included are the direct marketer's fee, which at around 15 MWh of grid feed-in a year can eat up the advantage of the market premium, and the uncertainty of real forecasts, because the optimisation knows prices and load profile for the whole year. How strongly a business is affected depends mainly on its load profile and its self-consumption rate. For ground-mounted systems the effect is much larger, as the solar park case shows. All scenarios are on the results page.

Sign up once and stay informed

Here is how you can calculate it:

What our customers calculate with it.

Commercial roof with 99 kWp: EEG 2027 calculated with feed-in limit and market premium

Model calculation for a commercial business with 500 MWh consumption and 99 kWp PV, under current law and under the draft EEG 2027. Because the business consumes 87% of its PV power itself, the feed-in limit barely changes the result. With a market premium, the benefit of the storage system rises by 10%.

87 %

Self-consumption rate of the PV system

0,3 %

of generation lies above the feed-in limit

19,2 %

Return on storage system with market premium (today 15.7%)

5.0 years

Payback period with market premium (today 6.0)
View Use Case →

20 MWp solar park: redispatch reservation calculated with and without a green electricity storage system

Model calculation for a 20 MWp solar park in the other Direktvermarktung (selling generated power via a direct marketer under the German EEG), under current law and with the redispatch reservation from the draft grid package. Without storage, the internal rate of return falls from 7.0 to 5.4%. With a green electricity storage system, it falls from 9.1 to 8.7%.

5,4 %

Rate of return without storage (today 7.0%)

2.5 GWh

additionally curtailed per year

60 %

of the revenue loss is offset by the storage system

8,7 %

Rate of return with storage (today 9.1%)
View Use Case →

AgNes capacity charge: what happens to the peak shaving calculation from 2029

Same site, same storage system, new grid fee system: the value contribution from peak shaving falls from €19,602/a to minus €4,258/a. The return falls from 11.8 to around 7 per cent.

11,8%

Return until 2028

7,3%

Return from 2029

-100%

Value contribution from peak shaving

43.5k

Additional costs p.a. from AgNes
View Use Case →

MiSpeL BTM with three stakeholders: The free grid connection as a business case

The site has a 750 kW grid connection and uses 413.7 kW of it. How a BESS investor uses the free 336 kW in line with MiSpeL, and what is left for the site and the direct marketer.

12,8%

Investor IRR

-44%

Site operating costs

103k

Total benefit per year

336 kW

Free grid connection
View Use Case →

C&I (commercial and industrial): one storage system, all revenues. The same storage system with and without MiSpeL

A commercial site with 750 kWp of PV is assessing a 2 MWh storage system. The same storage system, calculated twice: with full grid fees and levies on the trading electricity, and MiSpeL-compliant. The net present value (NPV) rises from €287,000 to €762,000.

132k

Savings/year (previously 80k)

762k

NPV (previously 287k)

3.8 yrs

Payback period (previously 6.3)

2,7×

NPV through MiSpeL
View Use Case →

From PPA to energy contracting: how the contract model decides the battery business case

Same site, same PV, but depending on the contract model, the business case ends up almost 10× larger. And the best part: the investor earns, the consumer saves, with no CAPEX of their own.

22,2%

Return

4.8 yrs

Payback period

7.59M

Net present value

-33%

Ongoing costs
View Use Case →