Grid connection in 2031, charging park in 2027: how you bridge the gap with a storage system and still make the numbers work
Use Case

MiSpeL BTM with three stakeholders: The free grid connection as a business case

The site has a 750 kW grid connection and uses 413.7 kW of it. How a BESS investor uses the free 336 kW in line with MiSpeL, and what is left for the site and the direct marketer.

Use Case key data

12,8%

Investor IRR

-44%

Site operating costs

103k

Total benefit per year

336 kW

Free grid connection

A C&I site with 750 kWp of PV covers an annual electricity demand of 1,000 MWh. The key figures look solid: 43% self-sufficiency, 67% self-consumption, around €110,000 in operating energy costs per year. Two items stand out on closer inspection.

First, 105 MWh of PV electricity per year is curtailed. Second, the grid connection is designed for 750 kW, while the actual peak load is 413.7 kW. 336 kW of connection capacity is paid for and sits idle.

For the site, this is a blemish. For a BESS investor, it is the scarcest resource on the market. A separate connection point means a Baukostenzuschuss (construction cost contribution for a grid connection in Germany), a grid compatibility assessment and a wait, often of several years. An existing connection with free capacity is available immediately.

Until now, this gap could not be tapped economically. Under the exclusivity option, storage feed-in lost its eligibility for support for the entire calendar year as soon as even one kilowatt hour of grid electricity was stored. The separation option of the MiSpeL determination changes that. Mixed storage systems remain eligible for support, and the levies under § 21 EnFG no longer apply to grid electricity that is deliberately drawn, stored and fed back in.

Objective: Can the free connection capacity at a third party's site support a BESS business case? And what is left for the site when a third party invests there?

Methodology

In minimum energy, the site was set up with three parties, each with its own calculation: BESS investor as owner and capital provider, consumer with PV, load and grid connection, direct marketer for market access and trading.

The contract model is deliberately simple. The site provides space and free connection capacity, invests nothing and keeps the benefit that arises behind its meter. The investor bears the investment and earns on the market side. The direct marketer receives a revenue share of the trading proceeds. The grid connection is the site's contribution, not part of its calculation.

Six applications were optimised at the same time: procurement optimisation, peak shaving, atypische Netznutzung (atypical grid usage under § 19(2) StromNEV, reduced grid fees for shifting load out of HLZF), self-consumption optimisation, arbitrage and Direktvermarktung (selling generated power via a direct marketer under the German EEG) from the storage system. Two constraints decide the result.

The connection capacity is a hard limit. The optimal storage system has 764 kW of power, and the site load reaches 413.7 kW. Together, that is more than the 750 kW connection can deliver. The optimiser decides in 15-minute resolution when charging has priority and when the load does. Two separately calculated tables produce figures at this point that do not exist in operation.

MiSpeL separates the quantities. Every kilowatt hour fed in from the storage system is either eligible for the market premium or eligible for netting, never both. Netting is done per calendar month, and surpluses lapse. Both paths are calculated in parallel and compared, not added together.

Result

The optimal design is 1,528 kWh / 764 kW with an investment of €351,527. The storage system runs 323 cycles per year.

Investor perspective

  • Arbitrage revenue: €56,742 per year
  • IRR: 12.8%
  • Payback period: 7.0 years
  • Net present value (NPV) over 20 years: €132,854

What stands out is not the level of the return, but how you get there. No Baukostenzuschuss, no grid compatibility assessment, no wait for a separate connection point. The revenue side is purely market side, and the site benefit stays with the site.

Site perspective

  • Operating energy costs: from €110,155 to €62,042 per year, down 44%
  • Capacity relevant for grid fees: from 222.8 to 90.7 kW, down 59%
  • Curtailment: from 105 to 30.2 MWh per year, down 71%
  • Self-sufficiency: from 43 to 52%
  • NPV over 20 years: €472,383, with €0 investment

The most interesting value is in the second line. Physically, the connection is now used up to 750 kW, because the storage system takes in grid electricity for trading. The capacity relevant for grid fees still falls by 59%. The reason is the optimisation against the HLZF (high-load time windows set by the German grid operator): charging happens when it does not hurt the demand charge. Anyone who looks at arbitrage and atypische Netznutzung separately considers this combination impossible. It is a question of the objective function, not of technology.

Direct marketer perspective

  • Revenue from the revenue share: €3,171 per year, without any own investment
  • NPV over 20 years: €31,132

Small by comparison, but scalable. The value of this perspective lies in the fact that it is shown at all. Anyone who submits a quote as a direct marketer should know whether their own margin holds at this split before the contract is in place.

The total adds up

All three perspectives together give the project view, to the euro. Benefit in the first year: €51,875 investor plus €48,113 site plus €3,171 direct marketer equals €103,159. Over 20 years: 943,687 plus 962,265 plus 63,417 equals €1,969,369. NPV: 132,854 plus 472,383 plus 31,132 equals €636,369.

From the project view, that is a 28.7% IRR with a payback period of 3.4 years. Operating costs fall from €110,155 to €6,995 per year.

That is the real point of the case. A project that returns 12.8% from the investor's view returns 28.7% from the project view, because two thirds of the benefit arise at the site and at the direct marketer. Anyone who calculates only one perspective negotiates with the wrong number.

One related detail: the site's emissions fall by 14%. On the investor's account, arbitrage charging creates 4,100 kg of new CO2 equivalent. Net, the project stays at minus 12%. Arbitrage behind the meter is a business model, not an argument for climate protection.

Regulatory status

The case is based on the working draft of the MiSpeL determination of 5 August 2026 (BNetzA, Germany's Federal Network Agency, ref. 618-25-02). Publication is planned there for 1 October 2026, and the date is still in brackets in the document. Until 30 September 2027, application is only planned with the agreement of the grid operator and the metering point operator.

With 750 kWp of PV, only the separation option is possible, as the flat-rate option applies to solar systems up to 30 kWp. The choice of option, the metering concept and the priority allocation are binding for at least one calendar year. With two owners at one connection point, the metering concept and final consumer status must be clarified in advance, not afterwards. And the determination itself describes MiSpeL's effect on grid fees as a transitional arrangement that the new AgNes (BNetzA reform of German grid fees towards capacity-based pricing) approach may replace. Grid fees belong in cases like this as a scenario, not as a constant.

Conclusion

The site has invested nothing and saves 44%. The investor has not built a connection and earns 12.8%. The direct marketer has tied up no capital and earns too. This works because MiSpeL allows, for the first time, a storage system behind a third party's meter to work on the market and at the site at the same time.

The deal stands or falls with the split. As long as nobody calculates how much benefit arises where, three parties negotiate over a number that none of them knows. The case One storage system, all revenues shows what the same site looks like without the stakeholder split.

Sign up once and stay informed

Here is how you can calculate it:

What our customers calculate with it.

Commercial roof with 99 kWp: EEG 2027 calculated with feed-in limit and market premium

Model calculation for a commercial business with 500 MWh consumption and 99 kWp PV, under current law and under the draft EEG 2027. Because the business consumes 87% of its PV power itself, the feed-in limit barely changes the result. With a market premium, the benefit of the storage system rises by 10%.

87 %

Self-consumption rate of the PV system

0,3 %

of generation lies above the feed-in limit

19,2 %

Return on storage system with market premium (today 15.7%)

5.0 years

Payback period with market premium (today 6.0)
View Use Case →

20 MWp solar park: redispatch reservation calculated with and without a green electricity storage system

Model calculation for a 20 MWp solar park in the other Direktvermarktung (selling generated power via a direct marketer under the German EEG), under current law and with the redispatch reservation from the draft grid package. Without storage, the internal rate of return falls from 7.0 to 5.4%. With a green electricity storage system, it falls from 9.1 to 8.7%.

5,4 %

Rate of return without storage (today 7.0%)

2.5 GWh

additionally curtailed per year

60 %

of the revenue loss is offset by the storage system

8,7 %

Rate of return with storage (today 9.1%)
View Use Case →

AgNes capacity charge: what happens to the peak shaving calculation from 2029

Same site, same storage system, new grid fee system: the value contribution from peak shaving falls from €19,602/a to minus €4,258/a. The return falls from 11.8 to around 7 per cent.

11,8%

Return until 2028

7,3%

Return from 2029

-100%

Value contribution from peak shaving

43.5k

Additional costs p.a. from AgNes
View Use Case →

MiSpeL BTM with three stakeholders: The free grid connection as a business case

The site has a 750 kW grid connection and uses 413.7 kW of it. How a BESS investor uses the free 336 kW in line with MiSpeL, and what is left for the site and the direct marketer.

12,8%

Investor IRR

-44%

Site operating costs

103k

Total benefit per year

336 kW

Free grid connection
View Use Case →

C&I (commercial and industrial): one storage system, all revenues. The same storage system with and without MiSpeL

A commercial site with 750 kWp of PV is assessing a 2 MWh storage system. The same storage system, calculated twice: with full grid fees and levies on the trading electricity, and MiSpeL-compliant. The net present value (NPV) rises from €287,000 to €762,000.

132k

Savings/year (previously 80k)

762k

NPV (previously 287k)

3.8 yrs

Payback period (previously 6.3)

2,7×

NPV through MiSpeL
View Use Case →

From PPA to energy contracting: how the contract model decides the battery business case

Same site, same PV, but depending on the contract model, the business case ends up almost 10× larger. And the best part: the investor earns, the consumer saves, with no CAPEX of their own.

22,2%

Return

4.8 yrs

Payback period

7.59M

Net present value

-33%

Ongoing costs
View Use Case →