04.12.2026

lcmd onsiteOur next webinar

Grid connection in 2031, charging park in 2027: how you bridge the gap with a storage system and still make the numbers work

From 2027, the monthly peak has a price everywhere. Calculate the storage system that cuts it.

minimum energy calculates PV, storage systems, grid fees and tariffs as one system. Ready to sell, in minutes instead of days.

30-minute initial call
·
Free of charge
·
Austrian grid fees included
New grid fee structure · Grid level 7
from 1 January 2027
The highest quarter hour of the month is the one that gets billed
Load profile of a commercial business · one month · with and without a storage system
Monthly peak without a storage systemPeak shaved with a storage systemDay 1Day 30
Demand charge
due every month
Storage system cuts the peak
reduces it directly
+30 to 40
%
Multi-Use revenue
through storage systems
20
Min
From enquiry to
indicative quote
70
%
Increased
planning efficiency

The regulation is changing. And your Excel spreadsheet can no longer keep up.

The ElWG is in force, and the new grid fee structure applies from 1 January 2027. The binding cent amounts only follow in December 2026 with the SNE-T-V.

Demand charge down to grid level 7
Structure in force (ElWG) · Detailed design in draft (SNE-G-V)

The highest quarter hour of the month is billed, including for businesses that pay no demand charge today.

A storage system that cuts the peak reduces the demand charge directly.
Peak shaving for new PV
In force (§ 101 ElWG) · Curtailment right from 1 January 2027

New PV may be curtailed to 70% of module peak output without compensation. On commercial roofs, the loss is noticeable.

If you charge the peak into the storage system instead of feeding it into the grid, you lose nothing.
Time-variable grid fees SNAP and WiNAP
SNAP in force since 1 April 2026 · WiNAP from 2027 in draft

20% lower grid energy charge in summer between 10:00 and 16:00, mirrored from 2027 in winter at night.

A storage system shifts grid consumption into these windows.
New grid connection fee
In force (§ 130 ElWG) · effective from 31 December 2026

A fee with a flat component in euros per kW of connection capacity. In case of bottlenecks, flexible grid access applies, with temporarily reduced capacity.

Every kW saved pays off immediately. A storage system bridges the bottleneck phase.
If you can't run the numbers by December, you will have no quotes in January.
Book a demo

Selling PV was easy. Storage systems in Austria are a different league.

Your current process
✕

Grid fees, tariffs and peak shaving in separate spreadsheets. You estimate how they interact.

✕

The tariff ordinance arrives in December. Your quote from October is then out of date.

✕

A quote with two scenarios takes a day. The customer meeting is tomorrow morning.

With minimum energy
✓

All components act on the same load profile. The optimisation finds the best schedule.

✓

Tariffs are parameters. Enter the new rates and the quote stays valid.

✓

Scenarios are calculated in parallel. Indicative quote in 20 minutes, export in your own corporate design.

To be honest: peak shaving alone rarely carries the investment. Only the combination with self-consumption, a dynamic tariff and marketing pays off, which is why the calculation has to handle all four together.

System in. Economic optimum out.

1
Capture the system

Import the load profile, set the site and grid level. Add PV, storage system, heat pump and charge points as building blocks.

2
Set regulation and tariffs

Austrian Systemnutzungsentgelte are already included. You enter the structure from 2027 as a tariff assumption and update it once the SNE-T-V is published.

3
Optimise and deliver

The optimisation finds the storage size and schedule with the highest net present value (NPV). Result as a report in your own corporate design or as a Magic Link.

Want to go deeper? All features in detail.
Digital twin, optimisation, Tariff Manager, reporting: the whole platform on one page.
Go to the platform →

Calculate your first Austrian case before your competitors do.

Bring a load profile. We lay out PV, storage system, Austrian grid fees and tariff as one system, live in the call. After 30 minutes, you have a result that can go straight into your quote.

Does a storage system pay off in Austria? The Vienna case shows you.

A commercial site in Vienna, two scenarios, calculated side by side in minimum energy.

Scenario 1: PV only
Scenario 2: PV plus storagedynamic tariff, energy marketing
Configuration
1,172 kWp
1,172 kWp plus 940.9 kWh BESS, dynamic tariff, energy marketing
Investment
€839,106
€1,074,328
Net present value (NPV), 20 years
€442,248
€601,542
Return
14.1%
14.5%
Payback period
6.7 years
6.5 years
Operating costs
−55%
−72%
Self-sufficiency
43%
57%

€235,000 more investment, €159,000 more net present value (NPV). That is the kind of comparison a managing director understands and a buyer cannot pick apart.

Model calculation, fictional site in Vienna, medium voltage, WACC 8%, 20 years, grid fees as of 2026. Structure from 2027 not yet included.

Built with Austrian customers.

Officially live in Austria since April 2026, developed with Austrian customers such as AC/DC PowerSphere.

„

The combination of technical depth, economic assessment and practical optimisation allows us to make reliable decisions for our customers on battery storage, PV and energy management systems.”

Heinz Steiner
Managing Director, AC/DC PowerSphere
Aufzeichnung · 38 Min
Official launch in Austria

Which use cases work in Austria straight away, and how the grid fees are set up in the software.

Watch the recording
Over 50 customers in DACH calculate with minimum energy.
GoldbeckSolarMaxSolar1PUNKT5B&W EnergyEmondo
AC/DC
PowerSphere
E.ONEnergiequelleBurgenland EnergieStadtwerke BochumSTABLRheinEnergie

Are you planning grid-scale storage? Then you are up against 25 gigawatts.

The grid connection is the bottleneck, not the permit. Your economic viability must hold with and without system-serving operation under § 127 ElWG (Austria's Electricity Industry Act), with full and with flexible grid access. Four scenarios, one site, side by side in minimum energy.

25 GW
Grid connection requests for battery storage
3–5 GW
expected demand in ten years
20 years
Exemption from charges for system-serving storage systems (§ 127 ElWG)
4
Scenarios, one site, calculated side by side

Frequently asked questions

What changes in 2027 for grid fees for commercial businesses in Austria?
−
The ElWG introduces a new grid fee structure from 1 January 2027. According to the SNE-G-V draft, the demand charge will be extended to all grid levels up to NE 7 and billed on the highest quarter-hour peak in the month. The aim is a ratio of 50% power to 50% energy, introduced over three years. The specific amounts will be set by the SNE-T-V, which is expected in December 2026.
Is peak shaving with battery storage worthwhile in Austria?
+
From 2027, the monthly peak will carry a cost across the board for the first time. Whether a storage system pays for itself as a result depends on the load profile: how high and how short the peaks are, and how often they occur. In most cases peak shaving alone does not cover the investment. The combination with self-consumption, a dynamic tariff and energy marketing decides it. This is exactly what minimum energy calculates on your load profile.
What is the difference between the system admission charge and the system provision charge?
+
Until the end of 2026, the system admission charge covers the actual connection costs and the system provision charge covers the proportionate grid expansion, billed in € per kW of agreed capacity. From 2027, the ElWG combines both into a single grid connection charge with a cost-based component and a flat-rate component. In both systems the same applies: the less connection capacity you need, the lower the charge.
Are Austrian Systemnutzungsentgelte included in minimum energy?
+
Yes. You can set up the structure from 2027 as your own tariff assumption and update it with the binding values once the SNE-T-V has been published.
Can I calculate the economic viability of PV and storage together?
+
Yes. PV, storage, heat pump and charging infrastructure are optimised as one system. You see net present value (NPV), return, payback period and operating costs side by side for each scenario.
What does minimum energy cost?
+
Licence per user, details in the initial call.

How long does it take you to produce a quote? And how long does your competition take?

30-minute initial call. We calculate your case live, with your load profile, at your site in Austria. Free of charge and non-binding.

All information on the grid fee structure from 2027 is based on the ElWG (BGBl. I Nr. 91/2025) and the consultation draft of the SNE-G-V from July 2026. Binding amounts will follow with the SNE-T-V. As of September 2026.