A large industrial site with an electricity demand of 138,621 MWh/a and a heat demand of 132,534 MWh/a, a near 1:1 ratio. Operating costs: €27.4 million/a. Price book: MISPEL (German BNetzA rules for storage that charges both grid power and on-site renewable power) 2026 (beta), WACC 6%, 20 years. This exact ratio is what makes the combined effect so strong: with a lower share of heat, the effect is correspondingly smaller.
BESS only or thermal storage only?
BESS only (4,890 kWh): €1.22 million investment, €749k net present value, 12.4% return, 7.4-year payback period. The storage system reduces load peaks, but the site's large heat share remains economically unused.
Thermal storage only (13,302 kWh): €399k investment, €2.44 million net present value, 62% return, 1.6-year payback period. With a third of the investment, you get three times the net present value, because the thermal storage makes the heat pump flexible and optimises electricity purchasing costs in low-cost hours.
The sweet spot: both systems combined
€9.77 million investment: 72.2% return, 1.4-year payback period, €71.7 million net present value.
BESS (432.4 kWh) and thermal storage (105,317 kWh) act on the same lever (the electricity price), but on two levels at once: the battery optimises procurement and peak shaving in the power grid. The thermal storage decouples the heat pump from heat demand and maximises its running time in low-cost hours. A 10 MWp PV system also complements the setup, with savings over 20 years of €140.9 million. Together they multiply, but only because heat and electricity demand are on a par here.
And then? atypische Netznutzung (atypical grid usage under § 19(2) StromNEV, reduced grid fees for shifting load out of HLZF) keeps scaling
+atypische Netznutzung (87,343 kWh BESS): €21.8 million investment, 31.9% return, €58.3 million net present value. Sensible for very large portfolios, but the return falls because capital rises disproportionately.