A fictional commercial or industrial site in Vienna (Maria-Theresien-Platz 1, 1010 Vienna, AT, Vienna 2026 MS) with an electricity demand of 1,187 MWh/a and operating costs of €226,611/a evaluates several expansion scenarios with PV and battery storage. Calculated with MiSpeL (German BNetzA rules for storage that charges both grid power and on-site renewable power) 2026 (beta), WACC 8%, observation period 20 years.
Methodology
In minimum.energy, two scenarios were modelled and compared directly:
S1: + PV (1,172 kWp)
PV system without battery storage. Investment: €839,106. Net present value (NPV): €442,248, return: 14.1%, payback period: 6.7 years. Operating costs: €101,762/a (-55%). Self-sufficiency: 43%, CO₂: 270,200 kg/a (-43%).
S2: + BESS (dyn. tariff + PV + power arbitrage + EVO, 940.9 kWh)
PV combined with battery storage, a dynamic tariff, power marketing and EVO integration. Investment: €1,074,328. Net present value (NPV): €601,542, return: 14.5%, payback period: 6.5 years. Operating costs: €62,353/a (-72%). Self-sufficiency: 57%, CO₂: 208,600 kg/a (-56%).
Result
The combination of battery storage, a dynamic tariff and Direktvermarktung (selling generated power via a direct marketer under the German EEG) delivers -72% operating costs and a 14.5% return with a payback period of 6.5 years. minimum.energy calculates all scenarios in minutes, including Austrian grid fees and MiSpeL-compliant pricing logic.