30-minute initial call
Free of charge and non-binding
Yes. Our software includes stored grid fees and lets you evaluate dynamic tariffs, for example for procurement optimisation or atypische Netznutzung (atypical grid usage under § 19(2) StromNEV, reduced grid fees for shifting load out of HLZF). This information feeds automatically into the profitability calculation and enables realistic ROI forecasts.
Our software was developed at RWTH Aachen and combines mathematical optimisation with machine learning. It enables the economically sound design of PV, storage system and charging infrastructure projects, including Multi-Use cases such as self-consumption, peak shaving, arbitrage or Direktvermarktung (selling generated power via a direct marketer under the German EEG). All scenarios are calculated automatically, analysed for each specific site and presented visually.
When choosing a design tool, three factors matter most:
Forecast quality & calculation approach
Many tools work with simplified simulations or averages. For reliable ROI and load forecasts, however, you need a model with mathematical optimisation, ideally based on real consumption profiles, dynamic tariffs and site data. This also helps you spot hidden economic potential.
Multi-Asset design (combinatorial scenarios)
A modern tool should be able to combine several components intelligently, e.g. PV, storage systems and charging infrastructure. Only then can you compare scenarios realistically and size systems precisely for your customers.
Use case coverage
A good tool covers more than self-consumption. It should also handle: peak shaving, atypische Netznutzung (atypical grid usage under § 19(2) StromNEV, reduced grid fees for shifting load out of HLZF), arbitrage, Direktvermarktung (selling generated power via a direct marketer under the German EEG), electricity cost optimisation with dynamic tariffs
That depends, among other things, on how much sizing you want to do with our software.
Simply book a short call with Leon via the link below and he will answer all your questions.
Use the link below to create a new account and register on minimum.energy.
However, you can only run calculations once you have taken out a suitable package with us.
Yes. We can size and simulate battery storage so that it is charged exclusively with renewable electricity (e.g. PV/wind), with no grid consumption for charging. This covers both the technical and the economic side.
Yes. Our software covers all relevant regulatory requirements in full and is updated regularly. These include:
You can also include grid restrictions, such as feed-in limits, connection limits or load peaks, directly in the modelling.
This way, you make sure every design is economically sound and complies with technical and regulatory requirements, without additional manual checks.
minimum.energy covers all relevant use cases, including:
Yes: minimum.energy was developed for exactly this purpose.
Technical planners get precise, simulation-based designs, including site data and load forecasts. The tool also creates visual reports in your corporate design, which are ideal for customer meetings or tenders. So a planning tool becomes a sales tool too, in one interface, with no manual handovers or Excel exports.
When you run calculations with minimum energy, we set up a so-called price book for you. It stores all the technologies you want to size (for example battery storage X, battery storage Y, PV module Z, etc.) with their technical and economic parameters. This means you do not have to re-enter the parameters of your technologies for every new project. You can draw on your standard range: your price book.
You can of course also create several price books if you want to use different standards for different types of customer or project (e.g. Commercial price book, Residential price book).
As a rule, the higher the resolution of your load profile, the more accurately our model can calculate.
A 15-minute load profile is particularly useful for dynamic electricity tariffs. With an hourly load profile, the actual 15-minute values can no longer be seen. The (sometimes large) differences between electricity purchase and sale prices within an hour then lead to inaccuracies in the analysis.
In principle, there is no limit to the number of scenarios you can calculate for a project with minimum energy.
On your "My projects" home page, you can adjust your company details under "Edit company account".
These include the address, a short company description, your company colours and the logo used in the PDF report.
Once you have selected the project you want a report for, click the "PDF erstellen" button at the top right.
You can then name the PDF file and select the scenario you want to export.
The net present value (NPV) is a financial metric that shows how much an investment is worth today when you discount all future cash inflows and outflows, in other words, when you calculate its present value.
Definition: net present value = sum of all discounted future payments minus the initial investment
A positive NPV means the investment is economically worthwhile (it returns more than it costs).
A negative NPV means the investment is not economically viable.
Voltage levels at the distribution system operator refer to the different electrical voltage levels at which electricity is transported and distributed in the power grid. These levels are part of the electrical energy supply system and determine the voltage level at which electricity flows from the grid operator to the end consumer.
A typical distinction is made between high voltage (110 kV), medium voltage (10-30 kV) and low voltage (<1 kV).
The grid operator publishes these every year, usually as time windows spanning several months in which certain hours count as high load.
Grid fees are charges for using the electricity grids. They make up a considerable part of the electricity price and are levied by the grid operator for the operation, maintenance and expansion of the infrastructure.
High-load windows are periods defined by the grid operator in which particularly high loads occur on the power grid. During these periods, grid load increases, and so do the costs of transport and reserve capacity.
Atypische Netznutzung (atypical grid usage under § 19(2) StromNEV, reduced grid fees for shifting load out of HLZF) applies when companies deliberately shift their electricity consumption outside the high-load windows. This relieves the grid, and they can apply for reduced grid fees (§ 19 StromNEV).
More informationWith dynamic tariffs, the electricity price follows the current exchange price (e.g. every 15 minutes). Consumers can benefit if they use electricity mainly during the cheaper hours.
Battery storage can reduce load in high-load windows by charging during other (cheaper) periods and discharging during high-load windows. This lowers grid fees.
A load profile describes how the energy consumption (usually electricity) of a consumer (e.g. a household, company or industrial site) changes over a given period.
It is usually shown as a chart or a table. For example, it shows electricity consumption in 15-minute or hourly intervals over a day, a week or a year.
Features of a load profile:
Time resolution: e.g. 15 minutes, 1 hour
Unit: usually kW (rarely kWh)
Representation: consumption per time interval