04.12.2026

lcmd onsiteOur next webinar

Grid connection in 2031, charging park in 2027: how you bridge the gap with a storage system and still make the numbers work
Use Case

C&I: MiSpeL-compliant storage sizing for arbitrage 2026

A C&I site with existing PV is assessing how battery storage can move from a pure cost optimiser to a MiSpeL-ready market revenue asset.

Use Case key data

290k

Savings/year

866k

Net present value (NPV)

262 MWh

Arbitrage vol./yr

-42%

Running costs

A C&I site with an existing 1.1 MWp PV system has an annual electricity demand of around 4.7 GWh. Despite on-site generation and grid feed-in, running energy costs were still around €690,000 per year.
Goal: to identify the most economical storage sizing, one that optimises existing procurement and marketing logic and at the same time makes the site MiSpeL-ready for market-based flexibility from 2026.

Methodology

Three scenarios were modelled in minimum energy:
the baseline without storage, storage operation without arbitrage and MiSpeL-compliant arbitrage operation.

The optimisation takes into account dynamic electricity tariffs, peak shaving, PV self-consumption and the sale of green electricity on the Day-Ahead spot market. For the arbitrage scenario, the storage system was also modelled as a standalone flexibility asset, with a clear separation between supplier electricity and market activity in line with MiSpeL logic.

Results

Scenario 1: storage without arbitrage
The optimal storage size is 1.5 MWh.
Procurement optimisation, PV shifting and selling on the spot market deliver savings of around €82,000 in the first year with a payback period of 5.2 years. The storage system acts purely on site and serves as an economically robust baseline solution.

Scenario 2: storage with arbitrage (MiSpeL-compliant)
With the introduction of market integration, the optimum shifts to around 6.0 MWh.
The storage system additionally moves 262 MWh per year across market-based price cycles. As a result, annual savings rise to €290,000 and the net present value (NPV) to €866,000, while running energy costs fall by around 42%.

Conclusion

The case shows how MiSpeL fundamentally changes the economic character of battery storage:
from a pure efficiency and cost optimiser to a regulation-compliant market factor.

The storage system is already economically viable today. With MiSpeL from 2026, scaling makes sense, driven not by technology but by market logic. minimum energy makes exactly this transition transparent, comparable and investment-ready.

Sign up once and stay informed

Here is how you can calculate it:

What our customers calculate with it.

Commercial roof with 99 kWp: EEG 2027 calculated with feed-in limit and market premium

Model calculation for a commercial business with 500 MWh consumption and 99 kWp PV, under current law and under the draft EEG 2027. Because the business consumes 87% of its PV power itself, the feed-in limit barely changes the result. With a market premium, the benefit of the storage system rises by 10%.

87 %

Self-consumption rate of the PV system

0,3 %

of generation lies above the feed-in limit

19,2 %

Return on storage system with market premium (today 15.7%)

5.0 years

Payback period with market premium (today 6.0)
View Use Case →

20 MWp solar park: redispatch reservation calculated with and without a green electricity storage system

Model calculation for a 20 MWp solar park in the other Direktvermarktung (selling generated power via a direct marketer under the German EEG), under current law and with the redispatch reservation from the draft grid package. Without storage, the internal rate of return falls from 7.0 to 5.4%. With a green electricity storage system, it falls from 9.1 to 8.7%.

5,4 %

Rate of return without storage (today 7.0%)

2.5 GWh

additionally curtailed per year

60 %

of the revenue loss is offset by the storage system

8,7 %

Rate of return with storage (today 9.1%)
View Use Case →

AgNes capacity charge: what happens to the peak shaving calculation from 2029

Same site, same storage system, new grid fee system: the value contribution from peak shaving falls from €19,602/a to minus €4,258/a. The return falls from 11.8 to around 7 per cent.

11,8%

Return until 2028

7,3%

Return from 2029

-100%

Value contribution from peak shaving

43.5k

Additional costs p.a. from AgNes
View Use Case →

MiSpeL BTM with three stakeholders: The free grid connection as a business case

The site has a 750 kW grid connection and uses 413.7 kW of it. How a BESS investor uses the free 336 kW in line with MiSpeL, and what is left for the site and the direct marketer.

12,8%

Investor IRR

-44%

Site operating costs

103k

Total benefit per year

336 kW

Free grid connection
View Use Case →

C&I (commercial and industrial): one storage system, all revenues. The same storage system with and without MiSpeL

A commercial site with 750 kWp of PV is assessing a 2 MWh storage system. The same storage system, calculated twice: with full grid fees and levies on the trading electricity, and MiSpeL-compliant. The net present value (NPV) rises from €287,000 to €762,000.

132k

Savings/year (previously 80k)

762k

NPV (previously 287k)

3.8 yrs

Payback period (previously 6.3)

2,7×

NPV through MiSpeL
View Use Case →

From PPA to energy contracting: how the contract model decides the battery business case

Same site, same PV, but depending on the contract model, the business case ends up almost 10× larger. And the best part: the investor earns, the consumer saves, with no CAPEX of their own.

22,2%

Return

4.8 yrs

Payback period

7.59M

Net present value

-33%

Ongoing costs
View Use Case →