Starting point. A standalone storage system with 10 MW and 20 MWh in a wind-dominated grid area in Nordfriesland. Instead of waiting for the full grid connection, the grid operator offers a flexible connection agreement (FCA, § 17(2b) EnWG). The question is not whether the FCA costs the storage system money. The question is which line in the contract costs how much. That is why we do not calculate "the FCA", but five contract scenarios on the same storage system.
Model case, not a customer reference: The storage system is generic, the feed-in limit is real. inframind calculated it in the grid simulation for the grid area, as a time series per quarter-hour for 2025.
Methodology
Five runs in minimum energy, same storage system, same prices, only the contract text changes. The reference is the full grid connection without FCA. Scenario two adds the rule-based feed-in limit as a constraint in the dispatch optimisation, across all 35,040 quarter-hours. Scenario three also excludes FCR and aFRR. Scenarios four and five add a ramp of 2 and 0.5% of rated power per minute respectively. Framework: Day-Ahead, Intraday auction and continuous Intraday, FCR and aFRR, price year 2025 (ENTSO-E, regelleistung.net), investment €5.6 million (€280/kWh), 20 years, 8% interest rate, maximum 730 full cycles per year, residual value after 20 of 30 years of service life.
Result
Without restrictions, the storage system earns €2.18 million per year, half of it from balancing services. Net present value (NPV) €15.0 million, return 36.8%, payback period 2.7 years.
- Rule-based feed-in limit: -0.6% revenue. €13,000 less per year, NPV €14.9 million, return 36.6%. The limit applies in 14% of quarter-hours, around the clock from September to January. It mainly shifts positive aFRR capacity reservation, while arbitrage remains practically unaffected.
- Plus balancing services excluded: -33% revenue. The storage system runs 471 instead of 327 cycles and earns €370,000 more on the spot market. That replaces a third of the €1.1 million balancing services revenue. NPV €7.9 million, return 23.6%.
- Plus ramp 2%/min: -36%. Ramp 0.5%/min: -43%. NPV €7.3 million and €5.9 million respectively. At 0.5% per minute, the storage system needs 200 minutes to go from zero to full power, longer than its own discharge duration. The ramp values are lower bounds, see Assessment.
Why the limit costs so little: It applies when there is a lot of wind in the grid and power is cheap. In the affected quarter-hours, the Day-Ahead price averages €63/MWh, and in 14% of them it is zero or below. The storage system feeds in at an annual average of €153/MWh. Grid congestion and low prices have the same cause, so the optimiser avoids the limit almost without loss.
Assessment
Three limitations of the calculation belong here. First, perfect foresight: The optimiser knows prices and limit for the whole year. Real trading results are typically 10 to 20% below the optimum, equally for all five scenarios. Second, the ramp is set per flow direction. The optimiser can partly bypass it with a simultaneous import and feed-in loop, so the ramp losses are lower bounds. Third, every ramp below 20% per minute in effect also costs you the balancing services, because aFRR requires full power within five minutes. Partial participation saves little.
Conclusion
In a wind grid, balancing services are the point worth discussing. The connection customer can accept the rule-based limit without endangering the business case. Excluding balancing services halves the NPV, and every ramp below 20% per minute is a hidden exclusion of balancing services. If you go to the grid operator with these numbers, you negotiate over contract text instead of gut feeling.
The south reacts differently to the same clause: FCA in the Niederbayern PV grid. All five contracts, the methodology and our position are in the Grid Connection Report Vol. 2, which we published together with inframind. Also see the webinar with inframind.