Most business cases for storage systems and PV calculate one representative year and extrapolate it over 15 to 20 years. The result looks neat. But it assumes that prices, spreads and loads stay the same for two decades.
No project works that way. Arbitrage spreads won't stay where they are today. E-mobility and heat pumps push up the load at the site. And the bank wants to see a business case based on the same market development that it assumes itself. A backtest on historical prices doesn't prove that.
This is exactly why minimum energy now calculates over multiple years. You upload your own Price Forward Curve or a market forecast as a time series covering several years. If you don't have complete time series, you describe the development using rates of change, for example 5% load growth per year. The optimisation then designs the storage system and system mix across all operating years together, not just for one reference year.
Leander and Leon show live:
- The new feature: upload multi-year price and load time series or generate them from rates of change, and use them directly in the optimisation
- The comparison: the same storage system calculated once with an extrapolated reference year and once over the full term. Where the design shifts and why
- The calculation method: how you balance accuracy and computing time by splitting the horizon into representative annual blocks, for example 4 times 5 years
- The bank conversation: cash flow, revenues and KPIs per year, ready for your own financial model
- The outlook: degradation of storage and PV, plus later expansions. This makes the question "design bigger now or retrofit later" calculable
45 minutes. Straight from the software. For anyone who wants to show their bank more than an extrapolated year.