Comprehensive guide

Peak shaving: how it works

Peak shaving: absorb short-term power peaks at the point of common coupling with a storage system or flexible load control.

Table of contents

More about the author

Dr.-Ing. Leander König-Kotzur

Managing Director Product

Go to author page
Go to Google Scholar profile

More about the co-author

Dr.-Ing. Felix Kullmann

Managing Director Customer Success

Go to author page
Go to Google Scholar profile

Share this post

Key takeaways from this article:

  • Billing is based on the highest 15-minute average in the billing period: short spikes lasting a few seconds are irrelevant to costs.
  • Monthly maximum and annual maximum tariffs need different strategies: with an annual maximum, a single outlier determines the cost for the whole year.
  • A reliable analysis needs at least 12 months of gapless 15-minute load profiles measured directly at the point of common coupling, not on sub-meters.
  • Only the combination of load profile data and tariff logic (including high-load time windows and atypical grid use) shows which peaks really drive costs.
  • Demand charges and grid fees make up a growing share of energy costs in the commercial and industrial sector. While many companies focus on the energy charge per kilowatt hour, in practice the highest measured quarter-hour of the year or month often determines the level of additional costs. This phenomenon is known as a load peak, and this is exactly where peak shaving comes in.

    How does peak shaving work?

    Basic principle:
    Peak shaving means that short-term power peaks at the point of common coupling (PCC) are absorbed by a storage system or flexible load control. Instead of drawing the full demand from the grid, a battery storage system (or another flexible asset) provides the additional power for a few minutes. This keeps the load measured at the grid below a defined target limit.

    Typical process (simplified):

    1. Monitoring
      An energy management system (EMS) continuously measures the load at the PCC every second.
    2. Trigger
      When the power approaches the defined limit (e.g. 1,200 kW), the EMS triggers a control action.
    3. Intervention
    • The battery storage system briefly discharges to "shave" the load peak.
    • Optional: controllable consumers (e.g. refrigeration, charge points) are shifted for a short time.
    1. Smoothing
      At the point of common coupling, the measured load stays below the threshold, even if more power is needed internally.
    2. Recharging/reset
      The storage system is carefully recharged outside the peak period (e.g. at night or when there is PV surplus).

    Example

    • A site starts up several machines at midday: the grid load jumps to 1,800 kW
    • The EMS setpoint is 1,200 kW
    • The storage system immediately supplies 600 kW for 15 minutes
    • At the grid, the operator only sees 1,200 kW instead of 1,800 kW
    • In billing, 1,200 kW counts as the peak load → saving: 600 kW × demand charge

    Ways to implement it

    • Battery storage system (classic): offers high flexibility and can be controlled quickly.
    • Process loads: e.g. pausing or staggering cooling systems for a few minutes.
    • Hybrid: storage system + load shifting, coordinated via the EMS.

    👉 Important: peak shaving always acts at the point of common coupling, no matter how the loads are distributed internally. What matters is that the 15-minute averages stay below the tariff limit.

    Cost structure: demand charge vs. energy charge

    When companies check their electricity bill, they usually notice the energy charge first: x cents per kilowatt hour (kWh). But in industry, the demand charge often accounts for a considerable share of total costs. It is calculated on the basis of the highest power drawn ("peak load") and billed in €/kW per year.

    An example from Germany:

    • Energy charge: 0.18 to 0.24 €/kWh
    • Demand charge: 100 to 200 €/kW·a

    Let's assume a site reaches a load peak of 1,800 kW for 15 minutes in June.

    • At 150 €/kW·a, this peak alone results in €270,000 in demand charge costs per year.
    • Even if the site only needs 1,200 to 1,300 kW in the remaining months, the bill stays just as high, because the highest value counts.

    👉 For energy managers, this means: it is not the average load but a single quarter-hour that can dominate the cost structure.

    Where do expensive peaks occur? Examples by industry

    Metalworking: When several presses or furnaces start up in parallel, load jumps of 400 to 800 kW occur within a few minutes.

    Plastics production: When extruders and dryers start at the same time after a shift change, characteristic peaks occur at the beginning of the early or late shift.

    Logistics centres: The simultaneous use of conveyor systems, cooling and charging infrastructure for EV fleets typically causes load peaks in the morning.

    Chemicals & pharma: Cycle-controlled refrigeration and process systems cause short but regular exceedances of the base load.

    Food industry: Clear peaks occur especially during cleaning and maintenance, for example when steam generators and pumps run at the same time, or during high-load time window hours due to additional cooling demand.

    👉 In all cases, peaks are not evenly distributed but concentrated in short, recurring time windows. These are exactly the ones you need to identify and address in a targeted way.

    Why is peak shaving worthwhile?

    • Direct savings: Every kW avoided reduces the annual demand charge.
    • Predictability: Proper peak shaving reduces the volatility of the electricity bill.
    • Combinability: Peak shaving can be combined with self-consumption optimisation or charging infrastructure management.
    • Regulatory bonus: In certain grid fee models (e.g. atypical grid use), targeted reductions during high-load time window hours are particularly valuable.

    But: peak shaving is not a cure-all. It only pays off if the load profile, tariff structure and technology are modelled properly. Otherwise, expensive misinvestments are a risk.

    Our tip:

    With minimum.energy, you can not only understand your electricity bills but actively shape them: the software analyses 15-minute load profiles, identifies expensive peaks and links them to the relevant tariff logic. And that's not all: we also have the grid fees of grid operators in the system.

    This shows which peaks are actually relevant to costs and which can be ignored. The simulation replaces gut feeling with clear figures and shows where peak shaving makes economic sense for your site.

    {{cta}}

    More on peak shaving

    Would you like to dive deeper into the topic? Here you will find our deep dive articles:

    Peak shaving in C&I: understanding measurement & data analysis properly

    Many companies invest a lot of time and money in battery storage systems or load management without first understanding the measurement and billing logic of their grid operators in detail. The result: simulations and planning based on wrong assumptions, and business cases that do not hold up in operation. The key to reliable peak shaving is a clean data basis and clear analysis.
    Read more ->

    Peak shaving in C&I: getting strategy & sizing right

    Most peak shaving projects fail not because of the technology but because of incorrect sizing. The central question is: how much power (kW) and how much energy (kWh) does a storage system really need to shave peaks economically? Then there are control strategies, efficiency losses and the question of whether the investment pays off in the long term.
    Read more ->

    Peak shaving in C&I: integration & multi-use in operation

    In practice, peak shaving rarely exists as a "standalone discipline". Battery storage systems, PV systems, charging infrastructure and flexible processes work together, or in the worst case get in each other's way. The key is clear prioritisation in the energy management system (EMS) and a realistic understanding of the technical coupling.
    Read more ->

    2,500-hour rule & peak shaving: reducing grid fees for C&I

    For commercial and industrial (C&I) customers, grid fees make up a considerable share of electricity costs. What matters is not only the energy consumed (kWh) but above all the highest measured quarter-hour power (kW). This is exactly where the 2,500-hour rule under § 19 StromNEV comes in: companies with consistently high electricity consumption (utilisation hours of over 2,500 per year) can reduce grid fees significantly. In practice, peak shaving with battery storage systems is the key lever for realising these benefits.
    Read more ->

    We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.

    Ready for quotes that actually hold up?

    Bring an example project. In 30 minutes, we will show you how minimum energy transforms your pre-sales process.

    Sign up once and stay informed

    Email distribution list

    Sign up once and stay informed

    On this list, we keep you up to date on upcoming webinars, trade fair appearances, new blog posts and glossary entries, as well as our brand-new monthly newsletter covering all product news.