Key takeaways from this article:

  • In practice, peak shaving rarely runs in isolation: PV, charging infrastructure and process loads need clear priorities in the energy management system.
  • Trade-off: if PV surplus is used entirely for self-consumption in the morning, the SoC reserve for peak shaving is often missing in the afternoon.
  • Recommended EMS order: first the mandatory reserve for HLZF (high-load time windows set by the German grid operator) and peak shaving, then self-consumption, and only after that optional arbitrage.
  • AC coupling is usually the pragmatic retrofit solution for existing systems. DC coupling mainly pays off in new builds with extensive PV integration.
  • In practice, peak shaving rarely exists as a "standalone discipline". Battery storage, PV systems, charging infrastructure and flexible processes work together, or in the worst case get in each other's way. 

    The key is clear prioritisation in the energy management system (EMS) and a realistic understanding of the technical coupling.

    PV + peak shaving: opportunities & trade-offs

    Photovoltaics can be a strong partner for peak shaving, if the load peaks fall within the generation windows. In many industrial businesses, however, peak consumption occurs in the morning or late afternoon, when PV output is already declining.

    Opportunities:

    • PV surplus can be used to charge the storage system specifically before HLZF hours.

    • If peaks coincide with PV time windows, PV generation directly reduces grid consumption.

    Trade-offs:

    • If PV surplus is used entirely for self-consumption in the morning, the SoC reserve needed for peak shaving is missing in the afternoon.

    • If the storage system is optimised primarily for self-consumption, critical peaks at the grid connection point can go unmitigated.

    Solution: a clear SoC reservation for peak shaving in the EMS, and only after that additional use for self-consumption or arbitrage.

    Charging infrastructure and process loads working together

    As electric fleets ramp up, new load peaks emerge in logistics and plant traffic. At the same time, process loads such as refrigeration or compressed air offer short-term flexibility.

    Example, charging infrastructure:

    • 20 charge points of 22 kW each can, if used at the same time, produce a peak of almost half a megawatt.

    • With load management, charging power can be staggered or shifted to PV hours.

    Example, process loads:

    • Cold stores can tolerate slightly higher temperatures for 10 to 20 minutes before product quality suffers.

    • Compressed air storage or thermal storage buffer loads and decouple generation from consumption.

    Properly integrated, charging infrastructure and process loads together with a storage system can enable a considerably more efficient peak shaving strategy.

    {{cta}}

    EMS priorities: self-consumption, arbitrage, peak shaving

    Battery storage can serve several purposes at the same time:

    • Self-consumption optimisation (using PV power yourself instead of feeding it in).

    • Arbitrage (charging cheap electricity, discharging expensive electricity).

    • Peak shaving (cutting load peaks).

    Without clear rules, these applications compete with each other. Typical problems:

    • The storage system is empty when peak shaving is needed.

    • The storage system is used for arbitrage although grid costs offer the bigger lever.

    Best practice: set priorities in the EMS.

    1. Mandatory reserve for HLZF/peak shaving.

    2. Use for self-consumption.

    3. Optional arbitrage.

    This ensures that the biggest cost effect, the reduction of demand charges, is not blocked by secondary applications.

    DC vs. AC coupling in the C&I context

    The type of system integration affects economic viability and flexibility:

    • DC coupling (PV and storage system on the direct current side):


      • Advantage: lower conversion losses, direct PV charging.

      • Disadvantage: more complex integration, often only economically viable for new builds.

    • AC coupling (PV and storage system connected separately to the grid):


      • Advantage: retrofit-capable, can be integrated flexibly into existing systems.

      • Disadvantage: additional conversion losses, higher installation effort.

    For many existing customers in the C&I sector, AC coupling is the pragmatic choice, while DC coupling makes sense for new builds with extensive PV integration.

    ____________________

    Our tip:

    With minimum.energy you can work through Multi-Use strategies step by step. The platform simulates how storage systems are prioritised between self-consumption, arbitrage and peak shaving, including SoC reservation and charging infrastructure integration. This shows which combination has the highest economic effect.

    ____________________

    We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.

    Ready for quotes that actually hold up?

    Bring an example project. In 30 minutes, we will show you how minimum energy transforms your pre-sales process.

    Sign up once and stay informed

    Email distribution list

    Sign up once and stay informed

    On this list, we keep you up to date on upcoming webinars, trade fair appearances, new blog posts and glossary entries, as well as our brand-new monthly newsletter covering all product news.
    No items found.