Peak shaving in commercial and industrial (C&I): getting strategy and sizing right

Table of contents

More about the author

Dr.-Ing. Leander König-Kotzur

Managing Director Product

Go to author page
Go to Google Scholar profile

More about the co-author

Dr.-Ing. Felix Kullmann

Managing Director Customer Success

Go to author page
Go to Google Scholar profile

Share this post

Key takeaways from this article:

  • In peak shaving, power (kW) usually matters more than energy (kWh): what counts is the discharge power available at short notice.
  • In practice, efficiency losses (round-trip efficiency usually 85 to 92%) and an SoC reserve of 20 to 30% come on top of the pure energy balance.
  • The control strategy determines battery lifetime: setpoint control is simple, droop control is gentler on the battery, and forecast-based control hits peaks most reliably.
  • A common mistake is sizing for average load instead of critical peaks. The result is a business case that only works on paper.

Many peak shaving projects fail not because of the technology, but because of incorrect sizing. The key question is: How much power (kW) and how much energy (kWh) does a storage system really need to cap peaks economically? Control strategies, efficiency losses and the question of whether the investment pays off in the long term also come into play.

kW vs. kWh: power demand, energy reserve, SoC window

In peak shaving, power (kW) is usually more decisive than energy (kWh). The storage system must be able to absorb a certain load peak at short notice.

Example:

  • Grid load jumps from 1,200 kW to 1,800 kW for 15 minutes.

  • If the peak is to be limited to 1,300 kW, the storage system must provide 500 kW of discharge power.

The energy required depends on the duration of the load peak. For three 15-minute intervals at 500 kW, that is 375 kWh, plus losses.

The calculation:

3 intervals of 15 min = 3 × 0.25 h = 0.75 h

E = 500 kW × 0.75 h = 375 kWh

This gives a pure energy requirement of 375 kWh.

In practice, you also need to take into account efficiency losses (round-trip efficiency 85 to 92%) and an SoC reserve. Realistically, that means 420 to 450 kWh of usable storage capacity.

Rule of thumb: For short, high peaks, discharge power counts. For long load peaks, storage capacity becomes decisive.

The SoC window (state of charge). In practice, the full battery capacity is never used. A safety or reserve margin (e.g. 20 to 30%) must be planned in to make sure enough energy is available at the critical time, especially in HLZF (high-load time windows set by the German grid operator) hours.

Control: setpoint, droop, forecast and rebound protection

A storage system only delivers its full effect with a suitable control strategy:

  • Setpoint control: The grid connection point is limited to a fixed maximum value (e.g. 1,300 kW). The storage system supplies everything above it. Advantage: simple and robust. Disadvantage: often over- or undercontrols.

  • Droop control: The storage system responds in stages when the limit is exceeded, instead of delivering full power straight away. Advantage: reduces battery wear and gives smoother transitions.

  • Forecast-based: Uses production schedules, weather data (PV/refrigeration) and empirical values to charge the storage system in good time and target peaks precisely. Advantage: high hit rate in HLZF.

Another critical point is the rebound effect. After a discharge, the storage system must not recharge immediately at full power, otherwise the next load peak occurs. Solutions include recharging windows, power limits or PV-led charging.

{{cta}}

Efficiency, degradation and cost per cycle

When sizing, you need to use realistic assumptions for efficiency and ageing, for example:

  • Round-trip efficiency is typically between 85 and 92%, depending on the operating mode (more in the article Strom-Arbitrage sauber rechnen: Die 7 Parameter). Losses from conversion (AC/DC), temperature or standby consumption must be factored in.

  • Degradation: Batteries lose 2 to 3% of usable capacity per year (the webinar recording on battery degradation shows how to factor in degradation realistically). This means a storage system with 1,000 kWh usable today often delivers only 850 to 900 kWh after 5 years.

  • Cost per cycle: Every charge and discharge cycle causes costs through ageing. If the grid fees saved per cycle are lower than the cost per cycle, the strategy does not pay off.

If you ignore these factors, you end up with a business case that works in Excel but not at the meter.

Business case & sensitivities: savings logic, payback, anti-patterns

The saving is relatively easy to calculate:

  • Monthly maximum: Difference between the actual and the capped peak × demand charge (€/kW·month).

  • Annual maximum: Difference × demand charge (€/kW·a). This then applies to all months of the year.

Example:

  • Annual maximum: reduction from 1,800 to 1,300 kW (-500 kW).

  • Demand charge: €120/kW·a.

  • Saving: 500 × 120 = €60,000/a.

Check sensitivities

A robust business case tests different scenarios:

  • Tariff changes (±20% demand charge).

  • Production changes (e.g. an additional shift).

  • Weather deviations (lower or higher PV output).

  • Battery ageing (degradation).

Typical anti-patterns

  • Sizing the storage system for average load instead of critical peaks.

  • Ignoring the SoC reserve: the storage system is empty when it matters.

  • Using PV surplus at the wrong time: charging in the morning, discharging at midday, and no reserve left in the evening.

  • Looking only at kWh and not at the discharge power (kW) needed.

Our tip:

With minimum.energy you can run through different storage system sizes and applications or use cases in a single model. The software shows which combination of kW, kWh and SoC reserve really works, and how ROI and payback develop under different scenarios.

We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.

Ready for quotes that actually hold up?

Bring an example project. In 30 minutes, we will show you how minimum energy transforms your pre-sales process.

Sign up once and stay informed

Email distribution list

Sign up once and stay informed

On this list, we keep you up to date on upcoming webinars, trade fair appearances, new blog posts and glossary entries, as well as our brand-new monthly newsletter covering all product news.
No items found.