Key takeaways from this article:

  • In practice, Multi-Use fails more often because of separation and the metering set-up than because of battery technology.
  • MiSpeL addresses exactly this interface: quarter-hourly measured values and formula-based allocation are the operational basis.
  • Levy netting for arbitrage volumes (§ 21 EnFG) and the grid fee exemption (§ 118(6) EnWG) form the framework of privileges, although how the grid fee side will work in practice has not yet been conclusively clarified.
  • For EPCs, this means: the metering concept and data access belong in early planning. The best next step is a decision paper: metering set-up + restrictions + target priorities → Multi-Use simulation with conservative/best-estimate.

In practice, Multi-Use at an existing grid connection fails more often because of separation and the metering set-up than because of the battery technology itself. Peak shaving, procurement optimisation, PV self-consumption and, in suitable hours, additional market sales and arbitrage: that sounds like the "best of all worlds".

But this often depends on a topic that tends to come up too late in early storage conversations: separation. That is, the question of how, in mixed operation (grid consumption, PV, storage system, possibly a charging point, site consumption), electricity volumes can be allocated in metering and billing terms so that privileges, levies and support logic stay consistent.

Under the keyword MiSpeL (market integration of storage systems and charging points), the Bundesnetzagentur (BNetzA, Germany's Federal Network Agency) addresses exactly this interface between "technically possible" and "clean in energy-market terms". MiSpeL is part of the Solarspitzengesetz (German solar peak law of February 2025) and sets out how storage systems and charging points can be operated in the market without losing EEG support entitlements.

→ Further reading: Separation option and MiSpeL: market integration of electricity storage systems and charging points

Terms you should keep clearly separate up front

So that MiSpeL does not come "out of nowhere", a clear classification helps:

Mixed operation: Several sources and sinks come together behind one grid connection point (e.g. PV + storage system + site loads + possibly a charging point). Energy flows "mix" physically. Billing still needs an allocation.

Separation: Calculation or metering logic for allocating electricity volumes proportionally, not tracing every single kWh.

Arbitrage electricity: Electricity deliberately drawn from the grid and stored in order to optimise on price. Within the MiSpeL framework it forms its own, third category alongside green electricity and normal grid electricity, with its own privilege and netting rules.

Levy netting (simplified): A mechanism intended to ensure that levies (e.g. under § 21 EnFG) are reduced only to the extent that grid electricity is fed back into the grid with a time shift. The principle applies to the whole MiSpeL framework, i.e. to both the separation option and the flat-rate option, each with different detailed logic.

What MiSpeL is and what it is not

MiSpeL is a determination by the Bundesnetzagentur on the market integration of storage systems and charging points, adopted on 1 October 2026 (ref. 618-25-02).

What matters in practice: MiSpeL creates options for determining and evidencing certain electricity volumes in mixed operation, especially when stored renewable electricity and grid electricity occur in the same system. Three regulatory levers are involved:

  • EEG support (§ 19(3b) EEG): Market premiums are retained proportionally, even if the storage system draws grid electricity.
  • Levy exemption (§ 21 EnFG): Arbitrage electricity is not to be treated as normal final consumption if it is fed back into the grid with a time shift.
  • Grid fee exemption (§ 118(6) EnWG): A grid fee exemption is provided for stored arbitrage electricity in mixed storage systems, but the exact operational form has not yet been conclusively clarified (→ more in the section "Open").

Two options: separation option vs. flat-rate option

The BNetzA describes two paths:

Separation option: Requires a calculated separation based on quarter-hourly measured values. Each quarter-hour is balanced individually. Clearly defined priority rules determine which share of the electricity fed in counts as green electricity and which as grid electricity. Levy netting for arbitrage volumes also applies on this basis. The separation option is open to systems of all types and sizes, but it is practically relevant mainly for professionally operated systems with interval metering.

Flat-rate option: Simplifies metering and separation for certain set-ups with PV up to 30 kWp through flat-rate assumptions and limits (up to 500 kWh/kWp count as eligible green electricity). The flat-rate option has not yet been cleared under state aid rules. The determination itself was adopted on 1 October 2026, but the flat-rate option can only be used once the European Commission has approved the legal basis under state aid rules (as of 12 November 2026).

For most C&I set-ups, the flat-rate option is only of marginal relevance. For Multi-Use in commercial settings, quarter-hour logic and metering data are the prerequisite if you want to reflect mixed operation in clean billing.

What Multi-Use can gain in practice

MiSpeL is not "a new revenue model" but an enabler: it opens up room to operate storage systems and charging points in a market-oriented way, without the allocation of green and grid electricity or the levy and support logic failing because of an unclear metering set-up.

Two points are particularly tangible for C&I:

Quarter-hour-based allocation instead of "all or nothing"

The separation option works with a proportional allocation of measured values recorded every quarter-hour and mathematically unambiguous formulas, precisely because electricity flows in mixed operation cannot be traced individually. In practice, this means you can report arbitrage volumes separately without putting the EEG support for the PV shares at risk. That is the real breakthrough compared with the previous "exclusivity principle", which in effect blocked mixed operation.

According to current estimates by the Bundesnetzagentur, 10 to 40% of the energy volumes in hybrid PV-storage systems can be arbitrage electricity. With price differences of €50 to €100/MWh, that means a potential of €5,000 to €30,000 additional annual revenue, if the separation works cleanly. The effect on storage sizing is considerable: a real C&I reference site (1.1 MWp PV, 4.7 GWh annual demand) shows that the economically optimal storage size with MiSpeL-compliant arbitrage jumps from 1.5 MWh to 6.0 MWh, with annual savings rising from €82,000 to €290,000.

Levy netting for arbitrage volumes

The MiSpeL framework ensures that arbitrage electricity is not automatically treated as normal final consumption when it is fed back into the grid with a time shift, but is subject to a reduced levy burden.

The detailed logic differs between the separation option and the flat-rate option, while the basic principle applies to both. Specifically, levies under § 21 EnFG potentially fall away for arbitrage volumes fed back (CHP/offshore levy approx. 1.09 ct/kWh, § 19 StromNEV levy approx. 1.56 ct/kWh), adding up to as much as 4 to 5 ct/kWh relief for volumes fed back.

For a C&I storage system with 1 MWh capacity and ~300 cycles per year, that equals savings of around €15,000 to €20,000 a year.

→ How a MiSpeL-compliant scenario is calculated in practice: Use case: MiSpeL-compliant storage sizing for arbitrage 2026

{{use-case}}

Confirmed vs. open: What you can plan on reliably today

Confirmed (directly relevant for EPC practice)

  • Separation option = calculated separation based on quarter-hourly measured values. The reasoning is explicit: electricity flows mix physically, so allocation is only proportional, via netting and allocation logic.
  • The flat-rate option is limited to PV set-ups up to 30 kWp.
  • Quarter-hour balancing is set as the operational basis (among other things for grid consumption and grid feed-in in the market rhythm).
  • MiSpeL is a data and metering concept topic, not an "add-on" at the end of a project.
  • The grid fee exemption for arbitrage electricity in mixed storage systems is provided for in the EnWG (§ 118(6)).
  • Timetable: determination adopted on 1 October 2026 (BNetzA, ref. 618-25-02). During a transition period until the end of September 2027, both options require the consent of the grid operator and the metering point operator. Flat-rate option only after EU approval.

Open (→ run scenarios, make no promises)

  • Operational implementation in market communication processes: anchoring in existing billing and market communication processes is not yet trivially complete for 2026 onwards.
  • Grid fee privileges for mixed storage systems, detailed form: the extension of the grid fee exemption to mixed storage systems (§ 118(6) EnWG) is provided for, but detailed questions remain open: proportional effect on the base charge and demand charge, handling of time-variable grid fees, concrete netting mechanics.

Practical conclusion: You can plan MiSpeL-capable metering and data architectures and calculate Multi-Use technically and economically. But billing advantages that depend on details that are still open should be treated as a scenario (conservative vs. best-estimate), not as a fixed lever.

EPC playbook: How to make MiSpeL and separation project-ready

1) Metering set-up first, optimisation afterwards

Before you discuss operating strategies:

  • Which metering points exist today?
  • Where is the grid connection point (relevant for balancing boundaries)?
  • Is there interval metering or load profile data in sufficient granularity?
  • Who is the metering point operator, and how do you get the data (quality, latency, completeness)?

That sounds trivial, but in practice it is the difference between "ready to simulate" and "ready to bill".

→ How to prepare and analyse load profile data properly: Analysing load profiles properly

2) Define Multi-Use as a restriction problem

Formulate early the restrictions that will shape later separation and operation:

  • Import/export limits at the connection
  • SoC windows/reserves (peak reserve vs. freedom to sell on the market)
  • Charging point integration (if present): must-charge/should-charge, time windows, power limits
  • PV integration: surplus windows, curtailment, priorities

→ How conflicting goals between peak shaving, PV and arbitrage are resolved in operation: Peak shaving in C&I: integration & Multi-Use in operation

3) Economic viability as a two-scenario set (instead of "one number")

For quotes and decision papers, the following has proved effective:

  • Conservative scenario: Multi-Use benefit mainly from peak shaving, procurement and PV, with billing advantages from separation and privilege logic assumed only to a limited extent.
  • Best-estimate scenario: Separation logic and privileges taken into account as currently understood, transparent about assumptions.

That keeps you robust against regulatory shifts in the details, without concealing the potential.

→ How a MiSpeL-compliant scenario is calculated in practice: Use case: MiSpeL-compliant storage sizing for arbitrage 2026

Two short practical examples

Example A: PV + storage system + site load: Multi-Use with priorities

Goal: reduce peaks (site costs), use PV surplus, capture opportunities in price windows.

Stumbling block: without a clean metering set-up, every feed-back is discussed later. Which volumes were grid electricity, which were renewable shares? Without MiSpeL-compliant separation, mixed operation puts the EEG support for the PV system at risk.

Consequence: separation and the metering concept become part of the system architecture, not just of billing.

→ How atypische Netznutzung (atypical grid usage under § 19(2) StromNEV, reduced grid fees for shifting load out of HLZF) works as a further revenue lever: Atypische Netznutzung in practice

Example B: Storage system + charging point in mixed operation

Goal: serve charging point loads predictably, stay within connection limits, and control in a market-oriented way where applicable.

Stumbling block: quarter-hour allocation and data access must be reliable, otherwise operation stays conservative: large reserve, small market sales.

Consequence: the metering concept and data availability directly determine the economic viability you can achieve.

→ How charging infrastructure, storage systems and peak shaving work together: Use case: Battery storage for future charging infrastructure

How minimum energy covers this

MiSpeL demands what hardly any planning solution can deliver today: regulatory precision on a quarter-hour basis, combined with genuine optimisation across all revenue sources.

The minimum energy platform models green electricity and grid electricity flows separately, integrates time-resolved price signals and grid fees, and enables rule-compliant simulations for EEG, EnFG and StromNEV scenarios, already today.

With the MiSpeL update, arbitrage electricity is modelled directly as a third electricity category, including the BNetzA's separation logic at 15-minute intervals. The result: MiSpeL-compliant project simulations that are automated, transparent and come with the conservative/best-estimate set that EPCs need for their decision papers.

→ Book a demo and run a Multi-Use scenario straight away

Note: This is not legal advice. The aim is a practical overview for EPCs and integrators.

We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.

Ready for quotes that actually hold up?

Bring an example project. In 30 minutes, we will show you how minimum energy transforms your pre-sales process.

Sign up once and stay informed

Email distribution list

Sign up once and stay informed

On this list, we keep you up to date on upcoming webinars, trade fair appearances, new blog posts and glossary entries, as well as our brand-new monthly newsletter covering all product news.