Monday morning, 6:45: The refrigeration system ramps up, two compressors start, and in the kitchen the combi oven preheats. For one quarter of an hour the business draws 60 kW from the grid, and for the rest of the month rarely more than 35. Until the end of 2026, that quarter of an hour costs nothing on grid level 7, as only consumption in kilowatt hours is billed. From 1 January 2027, exactly that quarter of an hour determines the demand charge for the month. And because the Monday morning start-up happens every month, one quarter of an hour becomes a permanent cost item.
What the demand charge tariff is and how it is calculated
Today, demand-metered sites on grid levels 3 to 6 already pay a demand charge, whereas grid level 7 pays a pure energy charge plus a fixed demand flat fee (€54 per year at Wiener Netze) and the metering charge. From 2027, the demand-based logic applies throughout: the smart meter measures the average demand per quarter of an hour, the highest quarter of an hour of the month is priced with the demand charge, and consumption continues to be priced with an energy charge (then a lower one). According to the draft, the flat fee and metering charge are dropped, and the grid operators' total revenue stays the same. So it does not become more expensive across the board, it is distributed differently: away from low-volume users with a flat load and towards connections with high peaks.
The legal division of roles behind this deserves a closer look, because it determines what is already settled today. The ElWG states bindingly that the new fee structure comes into effect on 1 January 2027. The Systemnutzungsentgelte-Grundsatzverordnung (SNE-G-V) of E-Control regulates the how: it was in consultation until 24 July 2026, its adoption is announced for autumn 2026, and as of mid-September 2026 it has not yet been promulgated. Everything on the calculation basis (monthly maximum demand, tiers, minimum values) therefore currently remains a draft. The amounts in euros and cents only follow with the annual tariff ordinance (SNE-T-V), expected towards the end of 2026.
Who is affected from 2027
All off-takers on grid level 7 with demand metering are affected, so practically every commercial business with a smart meter and 15-minute metering enabled. For grid level 7, the draft provides a two-stage tariff tier: one demand charge up to and including 10 kW, and a higher one above that. On top comes the minimum billing basis: at least 20% of the agreed capacity, and in any case 2 kW, is billed per month, even if the measured peak is lower. Oversized connections therefore cost money on an ongoing basis for the first time, not just once through the system provision charge.
On grid levels 3 to 6, less changes structurally, as the demand share there is already around 40 to 50% today. For businesses on grid level 6, the main change is the weighting shifting towards 50 to 50. If you are billed today without demand metering and stay below the thresholds, the system only changes for you with the switch to 15-minute values, which becomes standard anyway with the ElWG.
What it costs in practice: a worked example with monthly maximum demand
A model case, not a customer reference, calculated with the reference values from the ordinance procedure. E-Control has given these population-weighted Austrian averages: an energy charge in future of around 4.53 cents per kWh instead of today's around 7.36 cents plus the €54 flat fee, and a demand charge of around €33.82 per kW and year up to 10 kW and around €67.64 per kW and year above that. These are reference values to illustrate the system, not tariffs. The binding rates for your grid area will only be set by the SNE-T-V, and they will differ by federal state and grid operator.
The business from the introduction: grid level 7, demand-metered, annual consumption of 80,000 kWh, monthly peak demand constant at 60 kW.
- Today: 80,000 kWh × 7.36 cents plus a €54 flat fee plus the metering charge (at most €2.40 per month for a three-phase meter), together around €5,971 grid usage charges per year.
- From 2027, peak stays at 60 kW: 80,000 kWh × 4.53 cents is €3,624, plus the demand charge of 10 kW × €33.82 plus 50 kW × €67.64, together €3,720.20. Total around €7,344, so around €1,373 more per year.
- From 2027, peak reduced to 40 kW: demand charge of 10 kW × €33.82 plus 30 kW × €67.64, together €2,367.40. Total around €5,991, so almost exactly today's level.
At these indicative values, the 20 kW difference is €1,352.80 per year, every year. Two caveats apply. First, the example assumes that the peak occurs in every month. A one-off outlier in January only costs the demand charge for that month, not for twelve. It is not the outlier that gets expensive, but the recurring pattern. Second, businesses with a flat load and few peaks can also benefit from the lower energy charge. The demand-based tariff is not a blanket increase. It is a redistribution based on maximum quarter-hourly demand.
Why the highest quarter hour of the month sets the price
The quarter-hour logic is the core of the reform. Grid costs arise from capacity, and capacity has to be designed for the highest simultaneous load. That is why the draft prices not the average load but the peak: the highest quarter-hourly average demand of the month. A single quarter hour at 60 kW sets the monthly value at 60 kW, even if the business never exceeds 35 kW otherwise. The term annual peak demand, which many know from billing for demand-metered systems, therefore loses importance: billing is monthly, and every month starts at zero. That is good news for anyone who can control their peaks, because every monthly peak you avoid shows up immediately on the next bill.
This is exactly where the design question lies: the monthly peak almost always results from simultaneity. Three consumers of 20 kW each only produce 60 kW if they run in the same quarter hour. Simultaneity can be controlled, which makes the demand charge the first grid fee component at grid level 7 that a business can actively reduce.
Three levers against monthly peak demand
Load management. Controllable consumers are run in a staggered way instead of at the same time: charge points, refrigeration, hot water, start-up ramps. This is the cheapest lever. It needs metering, control and prioritisation rules, but no hardware in the power path. Its limit: processes that cannot wait.
Battery storage. The storage system covers the peak from the battery, so grid consumption stays below the target value. This also works for processes that cannot be shifted, and it combines with other applications such as self-consumption optimisation and charging in the SNAP window, the 20% discount on the grid energy charge that has applied since April 2026 in the summer half-year between 10 am and 4 pm for quarter-hourly metered systems at grid level 7. How peak shaving works technically is explained in the basics article.
Process shifting. Some peaks are organisational: the combi oven that preheats exactly when the refrigeration starts up, the overnight charging that starts at 10 pm sharp. A half-hour offset costs nothing and lowers the peak permanently.
Why storage size does not come from a rule of thumb
Rules of thumb circulate for peak shaving, such as one kilowatt hour of capacity per kilowatt shaved. They fail in two places. First, on peak duration: if you shave 20 kW over one quarter hour, you need 5 kWh. If you shave the same 20 kW over three consecutive hours, you need 60 kWh, plus a reserve for recharging before the next peak. That only shows up in the real quarter-hourly load profile, not in the connection rating. Second, on the competition between applications: the same storage system is meant to shave peaks, increase self-consumption and use cheap grid time windows. These applications compete for state of charge and power. If the battery is empty in the morning because it served self-consumption in the evening, it is not available for the Monday-morning peak. If you calculate the applications one after another, you add up revenues that exclude each other. The design only becomes reliable when all applications are optimised simultaneously across the load profile and the tariff structure.
{{use-case}}
What businesses should do now
First: activate quarter-hourly metering if you have not already, and download the load profile for the last twelve months from the grid operator portal. Second: identify the monthly peaks. When do they occur, how long do they last, which consumers cause them, and how far above the base load are they? Third: calculate instead of estimating. Use your own load profile, the indicative values as a scenario, and the binding rates as soon as the tariff regulation is available. If you know by then which 15 minutes a month cost you money, you will not be deciding under time pressure in January.
In minimum energy, you calculate this with your real load profile: peak shaving, self-consumption and tariff windows optimised simultaneously, the grid fee structure of your grid area stored, and the result as net present value and payback period for each scenario.
{{cta}}
Sources
- ElWG (Austria's Electricity Industry Act), BGBl. I No. 91/2025 (promulgated 23 December 2025, ris.bka.gv.at). Evidence: demand-based grid charge structure from 1 January 2027, extension to grid level 7, 15-minute values as standard. Law in force.
- E-Control, consultation draft SNE-G-V with explanatory notes, 30 June 2026 (consultation deadline 24 July 2026, e-control.at, document V SNE 01_26). Evidence: monthly peak demand as the billing basis, minimum assessment of 20% or 2 kW per month, two-step 10 kW scale on grid level 7, target ratio of 50/50 over three years from a starting level of around 30/70, removal of the flat fee and metering charge, WiNAP (October to March, 22:00 to 04:00), entry into force 1 January 2027 (§ 32). Status on 16 September 2026: draft, not promulgated, adoption announced by E-Control for autumn 2026.
- E-Control, reference values for the new charge structure (explanatory notes to the consultation draft and specialist event of 14 July 2026). Evidence: energy charge of around 4.53 cents per kWh (today around 7.36 cents plus a €54 flat fee), demand charge of around €33.82 per kW and year up to 10 kW and around €67.64 above that. E-Control expressly describes these as illustrative, population-weighted reference values calculated to be revenue-neutral, not tariffs.
- SNE-V 2018 as amended by the 2026 amendment, BGBl. II No. 301/2025 (ris.bka.gv.at). Evidence: current charge system on grid level 7, maximum metering charge rates (§ 10: three-phase meters at most €2.40 per month), time window of the summer low energy charge (1 April to 30 September, 10:00 to 16:00).
- Wiener Netze, price sheet for grid usage and grid loss charges 2026 (WN-EX0105) and the summer grid charge page (wienernetze.at, valid since 1 January 2026, accessed 16 September 2026). Evidence: current billing on grid level 7 with a flat fee of €54 per year, SNAP applying on grid level 7 to 15-minute-metered off-take volumes not allocated to EEG, discount of 20%.
- Wiener Netze, electricity grid terms and price information (wienernetze.at/stromnetzbedingungen, as at 11 August 2026, accessed 16 September 2026). Evidence: context on the system provision charge and minimum capacities.
As at 16 September 2026. All amounts exclude VAT. Statements on the SNE-G-V refer to the consultation draft and are not law in force.
We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.
Austria is live: PV, BESS and dynamic tariff in Vienna
Vienna site, Maria-Theresien-Platz: how PV, BESS, a dynamic tariff and power marketing combine to reach -72% operating costs and a 14.5% return.
14,5%
6.5 yrs
601.5k
-72%
Webinar recording: Scenario Modeler
The grid charge regime is changing, and your design has to work under both. In the new Scenario Modeler you run the same storage system through several grid charge scenarios and find the scenario that holds up in all of them. 45 minutes, straight from the software.