Key takeaways from this article:
- In the model calculation, commercial and industrial (C&I) storage remains a viable investment even with a capacity charge from 2029 and a falling price path: €546,000 investment, net present value (NPV) of €0.43 million at a 3% discount rate, internal rate of return of 14%, payback period of 5.0 years.
- The rules change during the lifetime of the storage system. Since 1 October 2026, MiSpeL has allowed trading on the market, and from 2029 the AgNes draft replaces the demand charge and atypische Netznutzung (atypical grid usage under § 19(2) StromNEV, reduced grid fees for shifting load out of HLZF) with a capacity charge model.
- With storage build-out, revenues per storage system fall. The balancing power market is saturating: the aFRR share of large-scale batteries' revenue fell from 94 to 54% in twelve months. According to a Fraunhofer ISE simulation, 20 GW of additional batteries would have cut the 2025 daily spread by almost 60%.
- In the model calculation for a commercial site (4.7 GWh consumption, just under 2 MWh storage, 20 years, capacity charge from 2029, FfE price path), the revenue sources shift. In 2027, 81% of the benefit comes from procurement and 26% from peak shaving. From 2029, the storage system costs grid fees on balance, but trading on the Day-Ahead and Intraday markets brings in €0.76 million over 20 years.
- A design only becomes a basis for investors once rule changes, market ramp-up and ageing are included in the calculation. If you only extend the first year, the document shows a 27% return instead of 14%.
If you designed a commercial and industrial (C&I) storage system around the 2025 reference year in January 2026, you worked with 573 negative hours on the Day-Ahead market and a spread of €116 per MWh between the two most expensive and the two cheapest hours of a day. In September 2026, this two-hour spread averaged €220 for the month, its highest level since 2022. The gas price has more than doubled year on year, and the aFRR capacity price, in 2025 still the most important revenue source for large-scale batteries, is around 50% below the previous year.
Both spreads are correct for their year. The backtest reliably shows how the storage system would have behaved optimally in the reference year and how large it would have needed to be. An investor also needs the years that follow, because regulation and the market change: MiSpeL and the AgNes draft shift the revenue sources, and storage build-out pushes down revenues on the balancing power market and in the daily spread. The model calculation in the next section shows what that adds up to over twenty years.
Status note: This article combines law in force (MiSpeL determination of the Bundesnetzagentur (BNetzA, Germany's Federal Network Agency) of 1 October 2026, § 41a and § 118(6) EnWG), ongoing proceedings (AgNes draft determination of 6 August 2026, GBK-25-01-1#3, consultation ended on 18 September 2026, decision announced for 2026) and announcements (dynamic grid fees from 2030 at the earliest). Draft versions are marked as such and may change until the final version. The model calculation is a platform calculation on typical days, not a customer reference. All information as at 9 November 2026.
A commercial site, calculated over twenty years
The following figures come from a model calculation on our platform and are not a customer reference. The site is connected at medium voltage, consumes 4.7 GWh a year, has a grid import peak of 1,474 kW, buys on a spot-indexed basis and has no PV. The storage system has a capacity of 1,951 kWh and a power of 976 kW and costs €546,000.
The calculation covers the operating years 2027 to 2046 in twenty phases with the 2025 reference year, from 2029 with the capacity charge model from the AgNes draft and with Day-Ahead prices based on the FfE target scenario 2026–2050 of the Forschungsstelle für Energiewirtschaft. The storage size is the same in all phases.
Because the calculation runs on typical days rather than the full time series, the values illustrate the mechanism and are not suitable as documentation for a bank.
In the first operating year, 2027, the storage system cuts the site's energy costs by around €149,000, which is 18%, with 416 full cycles. 81% of this comes from procurement optimisation, that is, from load shifting into low-cost hours, and 26% from peak shaving: the storage system lowers the grid import peak from 1,474 to 1,139 kW. The operating costs of the storage system deduct 7%.
In 2029, the grid fees pillar changes sign. Until 2028, the storage system saves grid fees of €34,000 to €39,000 a year. Under the capacity charge model, the site without a storage system pays around €229,000 a year and with a storage system €241,000 to €252,000, so €13,000 to €23,000 more, because more energy flows above the contracted capacity. The storage system then no longer caps the peak. It uses the connection up to its full power of 1,800 kW in every year from 2029 to 2046.
The procurement pillar follows the price path. It falls from €121,000 in the first year to €60,000 in 2031 and €38,000 in 2039, and rises again to €61,000 by 2046. The number of full cycles falls from 416 to around 260 to 330 in the 2040s.
From 2029, market sales are added, meaning feeding back into the Day-Ahead and Intraday markets, including grid fee refunds. They bring in around €52,000 in 2029 and €29,000 to €48,000 a year in the 2040s. Balancing services are not included in any phase. The calculation only includes feed-in from 2029, because it requires a feed-in commitment from the grid operator, and the grid fee exemption for electricity passed through storage systems behind the meter (BTM) is only clearly regulated with the AgNes (BNetzA reform of German grid fees towards capacity-based pricing) draft.
Degradation costs rise from around €500 in the second year of operation to around €17,000 in the eighteenth. After that, the calculation replaces the storage system.
The annual benefit after operating costs and degradation therefore falls from €149,000 in the first year to €42,000 in the eleventh, and then stays between €33,000 and €57,000. Over the twenty years, procurement brings in €1.19 million and market sales €0.76 million. Grid fees cost €0.23 million net, and operating costs and degradation of the storage system together cost €0.42 million.
For the investment decision, what counts are metrics that are defined in the same way in both calculations. Both include the investment of €546,000, the storage replacement after 18 years of operation, the residual value at the end and a discount rate of 3%.
| Metric | One-year calculation for 2027, extrapolated | Multi-year calculation 2027 to 2046 |
|---|---|---|
| Net present value (NPV) | €1.56 million | €0.43 million |
| Internal rate of return | 26.5% | 14.2% |
| Payback period | 3.7 years | 5.0 years |
The storage system remains a viable investment in the multi-year calculation too. The chart shows free cash flow by item, including the investment, storage replacement and residual value.

For investors and banks, the right-hand column is the reliable one. It includes the rule change in 2029, the price path and the ageing of the storage system, and the investment still holds up under these assumptions.
The storage size of 1,951 kWh is the result of optimising across the whole roadmap. The optimum for the reference year alone, 1,922 kWh, is only 1.5% lower.
Why one year behind the meter was enough for a long time
Until recently, the business case for C&I storage was largely deterministic. Energy market dynamics were less pronounced, and the regulatory changes were still to come. The demand charge is listed in the price sheet of the grid operator, the atypische Netznutzung (atypical grid usage under § 19(2) StromNEV, reduced grid fees for shifting load out of HLZF) has fixed HLZF (high-load time windows set by the German grid operator), and the electricity price was set in the supply contract. Where it was tied to the spot market, you at least knew its annual pattern. Because your own load profile also changes little from year to year, you were almost always right if you sized the storage system on the previous year.
Our platform data shows where the savings came from: 76% come from two levers, 40% from atypische Netznutzung and 36% from procurement via the dynamic tariff.
Under these conditions, the backtest holds up well. For a C&I storage system that 1PUNKT5 designed with our platform in July 2025, the design gave 66% electricity cost savings. In the first half of operation in 2026, 68% were actually possible, of which the energy management captured 93%. The target peak of 32 kW held in 99.75% of quarter-hours.
Peak shaving on your own load can be forecast well, which is why a design based on the reference year works well here. With the AgNes draft, however, this use case loses its basis.
What is changing in regulation
Three sets of rules are changing the case at the same time, and they have different status: MiSpeL (German BNetzA rules for storage that charges both grid power and on-site renewable power) is in force, AgNes is going through the procedure, and dynamic grid fees are announced.
Law in force. The determination on the market integration of storage systems and charging points, MiSpeL, was adopted on 1 October 2026 (BNetzA, Germany's Federal Network Agency, ref. 618-25-02). With the separation option, a storage system behind the meter may store PV electricity, charge grid electricity, cap peaks and trade on the market, without a single kWh from the grid putting the year's entitlement to support at risk. Every kWh fed in is either eligible for the market premium or eligible for netting, and netting is done per calendar month. Until 30 September 2027, this requires the consent of the grid operator and the metering point operator, after which there is an entitlement.
From a regulatory point of view, the storage system is therefore no longer limited to cost optimisation and can trade on the market. In addition, since 1 January 2025 every supplier under § 41a EnWG must offer customers with a smart metering system a dynamic tariff. For interval metering customers, spot-indexed procurement is market practice anyway.
Ongoing procedure. The draft determination on the general grid fee system, AgNes (BNetzA, GBK-25-01-1#3), was in consultation until 18 September 2026. The decision is announced for 2026. The draft names 1 January 2027 as the date of publication, and nothing has been adopted so far.
Under the draft, atypische Netznutzung (atypical grid usage under § 19(2) StromNEV, reduced grid fees for shifting load out of HLZF) and the demand charge on annual peak load will no longer apply from 1 January 2029. They are replaced by a capacity charge model: the customer orders a capacity between 10% of their previous-year peak load and their grid connection capacity, and energy above that costs two to three and a half times the energy charge. Bundesnetzagentur (BNetzA, Germany's Federal Network Agency) itself writes that the marginal cost of exceeding the ordered capacity is comparatively low. That leaves hardly any revenue for peak shaving. In the model calculation, this affects the 26% of the benefit in the first year.
For the grid fee exemption under § 118(6) EnWG, the draft provides a transitional rule. If you take the investment decision by 31 December 2026, meaning you have placed a binding order for at least half of the investment volume, and go into operation by August 2029, you keep the exemption for the electricity fed back into the grid. All later projects fall under the new regime.
Announced. The AgNes (BNetzA reform of German grid fees towards capacity-based pricing) draft names dynamic grid fees for storage systems for 2030 at the earliest and 2033 at the latest, subject to a follow-up determination. It cannot yet be modelled as a number, but as an open question it belongs in every design.
Of the three revenue pillars of a commercial and industrial (C&I) storage system, grid optimisation therefore ends in 2029 under the draft. The other two, procurement optimisation and arbitrage, depend on the Day-Ahead spread.
How storage build-out changes revenues
The more storage systems there are on the market, the less each one earns from the same revenue sources. This affects balancing services first, because the transmission system operators tender a limited volume there and every additional provider pushes the price down. According to Modo Energy, in September 2025 94% of the revenue of a two-hour battery came from aFRR capacity provision and 5% from trading. A year later it was 54% aFRR, 16% FCR and 30% Day-Ahead and Intraday, and total revenue was 39% lower. In the same period, a pure trading strategy earned almost 20% more than in the previous year.
In trading, the same mechanism works through the daily spread. Storage systems charge in the cheap hours and discharge in the expensive ones, so they raise the low prices and lower the high ones. Fraunhofer ISE simulated this on the basis of the real bid curves for 2025. In 2025, the average gap between the most expensive and the cheapest quarter hour of a day was €130/MWh. With 2 GW more batteries it would have been €93/MWh, with 5 GW €78/MWh and with 20 GW €53/MWh, which is almost 60% lower.
Modo Energy expects the revenues per megawatt of a two-hour battery to halve by 2030, while enervis sees no decline by 2027.
The build-out that triggers these effects is already under way. At the end of 2025, around 3.5 GWh of grid-scale storage was installed in Germany. From January to September 2026, another 3.8 GWh was added, more than four times the figure for the same period of the previous year. Grid connection requests stand at over 720 GW. How much of that will be built is an open question, and forecasts differ widely as a result.
So far, other drivers such as the gas price and PV build-out outweigh the dampening effect of storage systems. The average daily gap between the two most expensive and the two cheapest hours on the Day-Ahead market, a different measure from the quarter-hour spread above, was €76/MWh in 2021 and €177/MWh in 2022. In 2023 it fell to €92/MWh and has since risen via €104/MWh and €116/MWh to €152/MWh in the first nine months of 2026 (data: batteriespeicher-report.de, as of 30 September 2026).
In the same period, the number of negative-price hours rose from 69 in 2022 to 573 in 2025, and the annual market value for solar fell from 7.2 cents/kWh in 2023 to 4.5 cents in 2025.
A reference year captures a single snapshot of all this. A price path over twenty years can carry build-out, saturation and falling spreads with it.
What the multi-year calculation adds
A one-year model treats each year on its own, but over the project lifetime the years are connected. Degradation links them, because every cycle today reduces tomorrow's capacity. If the price path drops in 2031, that changes how many cycles are worthwhile in 2028, and a rule change in 2029 changes which ordered capacity makes sense in 2027. A one-year model represents this as a flat-rate deduction, while a multi-year model calculates it.
In energy system research, transformation paths have been calculated this way for years: investment decisions today, operating decisions in every year, and states such as state of charge or ageing as the link between them. Multi-year optimisation transfers this approach from the energy system to the individual site.
Sensitivities show how strongly the result depends on the assumptions. To run them, you calculate the same roadmap again with a different price path or different assumptions on regulation and compare the key figures. Each run calculates one path, so the storage size is not chosen across several paths at the same time.
A 2014 study by Carpinelli and colleagues for an industrial site with nine price and load scenarios shows that this comparison is worthwhile. Depending on the scenario, the optimal storage size was either zero or 900 kWh. Across all scenarios, the robust sizes were between 500 and 650 kWh.
How we calculate this in minimum energy
In minimum energy, this runs in three stages on the same optimiser.
The backtest over the reference year delivers the theoretical optimum across all 35,040 quarter hours and calculates all use cases simultaneously. Peak shaving, procurement and arbitrage compete for the same state of charge. If you calculate them one after the other, first the reserve for the peak and then the remainder for the market, you get revenues that cannot be achieved at the same time in operation.
The Scenario Modeler splits the project lifetime into phases, each with its own rules, its own price paths and its own degradation. One example is MiSpeL (German BNetzA rules for storage that charges both grid power and on-site renewable power) with a consent phase until September 2027, a capacity charge from 2029 and dynamic grid fees as an open question from 2030. This is a simulation that shows what each phase does to your storage system.
The multi-year optimisation combines the phases into one problem. The entire period is optimised in a single run, and the storage size is the decision that applies across all phases. Each run calculates one price path, and further paths run as separate sensitivities. The price paths come from our own market scenarios, versioned and with an assumptions register, or from your own curve.
We explicitly do not provide a forecast that a bank is meant to rely on. The calculation is set up so that you can test it against your own assumptions about the future.
What you should ask your tool
If you are sizing a commercial and industrial (C&I) storage system today, three questions are worth asking your tool.
- Does it calculate one year or the whole lifetime with degradation?
- Does it represent rule changes such as the capacity charge from 2029 as separate phases?
- Can you swap the price path so that you can run sensitivities?
For projects that run beyond 2029, so practically all of them, you need all three.
{{cta}}
Sources
- BNetzA (Germany's Federal Network Agency), determination on the market integration of storage systems and charging points (MiSpeL, German BNetzA rules for storage that charges both grid power and on-site renewable power) of 1 October 2026, file ref. 618-25-02, proceedings page and background paper.
- BNetzA, Grand Ruling Chamber for Energy, draft determination on the general grid fee system for electricity (AgNes, BNetzA reform of German grid fees towards capacity-based pricing) of 6 August 2026, ref. GBK-25-01-1#3, sections 8.4, 8.5, 12.2, 20, paras 192, 312, 500, 518.
- § 41a EnWG, § 118(6) EnWG, § 19(2) StromNEV.
- Modo Energy, Germany BESS Revenue Benchmark September 2026 (8 October 2026) and Germany Battery Investment Outlook Q2 2026 (16 March 2026).
- Fraunhofer ISE, documentation of battery storage in the electricity market 2025 and Energy-Charts price simulator (October 2026).
- BSW-Solar, storage additions January to September 2026 (22 October 2026).
- BDEW, grid connection requests for large batteries (27 November 2025).
- netztransparenz.de, annual market value solar.
- batteriespeicher-report.de, Day-Ahead spreads 2021 to 2026 (data as of 30 September 2026).
- Carpinelli, Di Fazio, Khormali, Mottola (2014), Energies 7(1).
Model calculation: minimum energy platform calculation, financing report of 9 November 2026, illustrative assumptions, not a customer reference. Not legal advice.
We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.
AgNes capacity charge: what happens to the peak shaving calculation from 2029
Same site, same storage system, new grid fee system: the value contribution from peak shaving falls from €19,602/a to minus €4,258/a. The return falls from 11.8 to around 7 per cent.
11,8%
7,3%
-100%
43.5k