Key takeaways from this article:
- Atypische Netznutzung and 7,000h baseload expire under the AgNes draft. Existing cases keep their discount frozen until the end of 2031, after which it ends (point 17.1/17.2, para. 192 of the draft).
- From 2029, the capacity charge model replaces the demand charge: you order capacity instead of avoiding an annual peak load. Exceedances cost the AP2 surcharge of 200 to 350% of the energy charge, not a demand charge.
- The successor to individual grid fees is only being piloted for large consumers: at least 10 GWh annual consumption and an existing agreement under § 19(2) StromNEV. The final rules come only with a follow-up determination, announced for 2027.
- Below 10 GWh there is no individual successor instrument. The calculated 9 GWh model case shows what that means: the value contribution from peak shaving falls from €19,602 to minus €4,258 per year, and the return on the storage system from 11.8 to 7.3%.
- If you invest now, you are calculating against three regimes: StromNEV until the end of 2028, a frozen existing-case discount until the end of 2031, then the capacity charge or the flex model. Grid fees belong in the calculation as a scenario, not as a constant.
Up to 80% off grid fees for predictable load shifting: that is atypische Netznutzung, and the AgNes draft ends it. What comes next is split in two. For companies with annual consumption of 10 GWh or more, the Bundesnetzagentur (BNetzA, Germany's Federal Network Agency) is testing a successor in pilot projects that ties discounts to proven flexibility. For everyone else, the general capacity charge model takes its place. Both routes change the same calculation, but in very different ways.
Note on status: This article is based on the BNetzA's AgNes draft determination of 6 August 2026 (Grand Ruling Chamber for Energy, ref. GBK-25-01-1#3) and the concept for pilot projects on industrial grid fees of 19 February 2026. The draft determination is a draft, not a final decision. The consultation period ended on 18 September 2026, and the determination is planned to be announced on 1 January 2027. Individual provisions may change before the final version. All information is as of 4 October 2026.
What applies today: two discounts, one section
§ 19(2) StromNEV provides for two individual grid fees, and both work on the same principle: if you relieve the grid in a predictable way, you pay less.
The atypische Netznutzung (sentence 1) rewards load shifting. If you predictably shift your peak load out of the HLZF (high-load time windows set by the German grid operator), you pay an individual grid fee of at least 20% of the published fee, so a discount of up to 80%. There is no consumption threshold. That is exactly why atypische Netznutzung is the instrument for mid-sized businesses: it works as well for a business using 2 GWh as for a site using 20 GWh, and it is the reason why many storage and flexibility projects make financial sense today.
The baseload rule (sentence 2) rewards the opposite, namely an even load. From 10 GWh annual consumption and at least 7,000 utilisation hours, the individual fee falls to 20%, from 7,500 hours to 15%, and from 8,000 hours to 10%. This is the instrument of basic industries, from chemicals to aluminium.
Both instruments rest on the StromNEV. And the StromNEV is being phased out.
What the AgNes draft ends
The draft determination on the general grid fee system replaces the StromNEV logic on 1 January 2029. The list of provisions that then lapse includes both industrial instruments (para. 192): atypische Netznutzung and 7,000h baseload then apply only to existing cases, with a frozen discount, at most until 31 December 2031 (points 17.1 and 17.2). After that it ends, according to the current draft.
For interval-metered customers with annual consumption above 100,000 kWh, the capacity charge model replaces the demand charge. You order a capacity between 10% of your previous year's peak load and the contractual grid connection capacity, and you pay a price in euros per kilowatt per year on it. Consumption below the ordered capacity costs the energy charge AP1, and every exceedance costs the surcharge AP2, which in the draft is 200 to 350% of AP1 (points 8.4 and 8.5). The BNetzA itself calls the marginal cost of an exceedance "comparatively low" (para. 312).
This overturns the foundation of two decades of load management: the annual peak load is no longer priced, and load shifting is no longer rewarded across the board.
Important for context: the final system for industrial grid fees is not part of the AgNes decision. The BNetzA has postponed it to a follow-up determination, announced for 2027, and wants to build in the experience from the ongoing pilot projects. So if you plan today, you are planning against an interim position.
The timeline at a glance: until the end of 2028, the StromNEV applies, and atypical grid use and baseload work as before. From 1 January 2029, the capacity charge model applies, and existing cases keep their frozen discount until the end of 2031. From 2032, under the current draft, there is no atypical grid use and no baseload any more, only whatever the 2027 follow-up determination makes of them.
Over 10 GWh: the successor is being piloted
On 19 February 2026, the Bundesnetzagentur (BNetzA, Germany's Federal Network Agency) presented a pilot concept for the baseload successor. You can take part if you have an existing agreement under § 19(2) StromNEV and consume at least 10 GWh a year. This applies to baseload customers as well as to large atypical consumers. The discount is based on the historical discount percentage, the term is 6 to 12 months, and the minimum threshold for the flexibility proof is 3% load shifting.
Two models are being tested.
Model A, spot market flexibility: At least three hours of high-load and three hours of low-load time windows per day, derived from electricity prices. Day-Ahead, Intraday or a forecast with a lead time of up to three days are permitted as the price basis. The reference load is the average load outside the time windows, plus or minus one hour. The distribution system operator keeps a right of veto if market-oriented operation makes bottlenecks worse.
Model B, grid-supportive flexibilisation: Here the grid operator defines the time windows, for example along the high-load hours of the upstream grid. Two to six hours per window, a maximum of two windows per day, and a lead time of up to 48 hours. The reference load is formed in the same way as in Model A.
The logic behind both models is the same, and it is the real message: in future, a discount will no longer be granted for a load profile, but for proven, window-specific load shifting against a reference load. A characteristic becomes a service. If you can provide it, with process flexibility or a storage system, you have a successor instrument in sight. The parameters for it, however, will only be set with the follow-up determination.
Under 10 GWh: the capacity charge is the successor
For everyone below the 10 GWh threshold, there is no pilot route and so far no individual successor instrument. Atypical grid use ends for this group without replacement, and the general capacity charge model takes its place. The lever therefore moves completely: away from the question of how you cut the peak or shift it out of the HLZF (high-load time windows set by the German grid operator), towards the question of which capacity you order and which exceedances you knowingly allow.
We have calculated what this means in practice in minimum energy. It is a model case, not a customer reference, and the assumptions are open: a commercial site in Bochum with around 9 GWh of annual consumption, so exactly in the class below the pilot threshold, an annual peak load of 2,036 kW, plus a storage system with 1,722.5 kWh and 861 kW for €482,300.
Three results from this calculation:
The change of system alone costs money, even though nothing changes at the site. Under the capacity charge, running costs rise by €43,458 per year. The decision behind it is more interesting: the optimisation orders only 1,305 kW, which is 64% of the annual peak load, and knowingly accepts 783,609 kWh of exceedance, because the AP2 surcharge is cheaper than a higher ordered capacity. The right ordered capacity is the biggest single lever in the new regime, and it costs no investment at all.
The value contribution from peak shaving turns negative. It goes from plus €19,602 per year under the StromNEV to minus €4,258 under the capacity charge. The storage system charges at high power in cheap hours and so creates additional exceedance volumes. What supports it is procurement optimisation alone.
Calculated over the full term, the return falls from 11.8 to 7.3%. An investor decides once: two years of StromNEV, then the capacity charge. If you calculate today with the full peak shaving payback period, you rely on a revenue source that will exist in this form for only two more years. The full calculation with all four scenarios is in the use case AgNes (BNetzA reform of German grid fees towards capacity-based pricing) capacity charge: what happens to the peak shaving calculation from 2029.
Our view: the threshold is the problem, the scenario calculation is the answer
At minimum energy, we consider the overhaul consistent. A grid fee system that is meant to reward flexibility cannot permanently support an instrument that rewards evenness. But three points deserve to be named honestly.
The 10 GWh threshold cuts out mid-sized businesses. Today's atypical grid use has no consumption threshold, but the pilot route does. For everything between 100,000 kWh and 10 GWh, there is currently no individual successor, only the ordering lever in the capacity charge model. It is real and costs nothing, but it is smaller than an 80% discount. If you operate atypically in this class today, you lose an instrument and get no new one.
The reference load is an incentive problem. Using the average load outside the time windows as the reference means that if you consume more outside the windows, you raise your reference and make the flexibility proof easier. A sound model calculates the operating mode against the windows instead of massaging the reference. Design questions like these decide in the end whether the successor rewards grid-supportive behaviour or clever arithmetic.
Three regimes, one investment decision. If you invest in flexibility or a storage system in 2026 or 2027, you are calculating against the StromNEV until the end of 2028, against the frozen existing discount until the end of 2031, and against a regime after that whose parameters will only come with the 2027 follow-up determination. In this situation, a single assumption about grid fees is not a simplification but a risk. That is why we calculate grid fees as a scenario: the same load profile, the same system, several regimes side by side, with the difference shown instead of a forecast.
We have already implemented the two pilot models for this as a generalised time window model: high-load windows with load reduction against the reference, low-load windows with load increase, reference load formation in the remaining time window, and the time window source either automatically from Day-Ahead prices as in Model A or as a specification from the grid operator as in Model B, including storage system sizing against the flexibility requirement. We deliberately model two points in simplified form, the grid operator's right of veto and the correlation variant of the measurement method. This also belongs to an honest calculation.
What you should do now
Four things can be derived directly from the current state of the procedure, without waiting for the final version.
First: secure and document today's discount. Existing cases keep their discount until the end of 2031, and the pilot models build on the historical discount percentage. Your own history is therefore worth real money.
Second: calculate your load profile against the regimes that are coming. Ordered capacity, AP2 tolerance and flexibility potential are optimisation variables, not gut decisions. The 9 GWh case above shows that the best answer can make a difference of €43,000 even without any investment.
Third: examine flexibility as a future source of discount. In the pilot regime, process flexibility and storage systems are what the load profile was in the old world. Whether this pays off depends on the site, not on the principle.
Fourth: if you consume more than 10 GWh, take the pilot route seriously. If you can take part, you collect exactly the evidence and experience on which the 2027 follow-up determination will be built.
What the AgNes draft (BNetzA reform of German grid fees towards capacity-based pricing) also changes for storage projects, from the capacity charge to the grandfathering period, is covered in our article Grid fees 2029: What the BNetzA draft means for storage projects. The recording of our Scenario Modeler webinar shows what the scenario calculation looks like in practice: one load profile, several grid fee regimes, calculated in minimum energy. Watch the recording here. And if you want to calculate your own site, book a demo.
Frequently asked questions about the end of atypische Netznutzung (atypical grid usage under § 19(2) StromNEV, reduced grid fees for shifting load out of HLZF)
When does atypische Netznutzung end?
Under the AgNes draft determination, the StromNEV system ends on 31 December 2028. Existing cases keep their discount, frozen, until 31 December 2031 at the latest (points 17.1/17.2 of the draft). This is the draft position. The final determination is planned for the end of 2026, with announcement on 1 January 2027.
What replaces atypische Netznutzung and baseload?
Two things. For all interval-metered customers above 100,000 kWh, the capacity charge model with ordered capacity and an AP2 surcharge for exceedances applies from 2029. For companies from 10 GWh with an existing § 19(2) agreement, BNetzA (Germany's Federal Network Agency) is also testing pilot models that tie discounts to proven load flexibility. The final industrial framework will come with a follow-up determination, announced for 2027.
Does the pilot scheme also apply to smaller companies?
No. The pilot concept of 19 February 2026 requires annual consumption of at least 10 GWh and an existing agreement under § 19(2) StromNEV. For companies below that, there is currently no individual successor instrument.
Is peak shaving still worthwhile from 2029?
As a standalone business case, in most cases no longer. In the modelled case, the value contribution of peak shaving falls from €19,602 to minus €4,258 per year, because exceedances of the ordered capacity then only cost the AP2 surcharge. What remains are procurement optimisation, flexibility marketing and the right ordered capacity. The result depends on the load profile and cannot be generalised.
What should I do before the final determination?
Document your existing discount and load history properly, calculate your own load profile against the StromNEV and capacity charge regimes, and assess your flexibility potential, including storage systems. If you are above 10 GWh, follow the pilot projects and the 2027 follow-up determination closely.
Sources: BNetzA, Grand Ruling Chamber for Energy, draft determination on the general electricity grid fee system (AgNes) of 6 August 2026, ref. GBK-25-01-1#3, in particular points 8.4, 8.5, 17.1, 17.2 and paras 192 and 312, consultation period ended on 18 September 2026. BNetzA, concept for pilot projects on industrial grid fees of 19 February 2026. § 19(2) StromNEV. Model case: platform calculation from minimum energy (use case "AgNes capacity charge"), illustrative assumptions, no customer reference. All statements on the future legal position refer to draft and concept stages and may change in the final version. This is not legal advice.
We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.
AgNes capacity charge: what happens to the peak shaving calculation from 2029
Same site, same storage system, new grid fee system: the value contribution from peak shaving falls from €19,602/a to minus €4,258/a. The return falls from 11.8 to around 7 per cent.
11,8%
7,3%
-100%
43.5k
Webinar recording
One load profile, several grid fee regimes: in the Scenario Modeler recording, we calculate in minimum energy what the end of atypische Netznutzung means for a real site, from ordered capacity to the flex model of the pilot projects. Scenarios, not forecasts, straight from the software.