Key takeaways from this article:
- Status quo: § 19 grid fee agreements reward passive load shifting in 15 peak hours a year. The system is static and backward-looking.
- New pilot concept (BNetzA, February 2026): Daily flexibility requirement of ≥ 3% deviation in defined time windows. Model A (spot market) and Model B (defined by the distribution system operator).
- Simulation (fictional demo case, Kreuzau): Grid fee models alone do not carry the BESS investment. Only the combination with dynamic electricity procurement gives an NPV of +€141,223 at a 12.1% return.
- AGNES is the missing digital infrastructure for the automated signal and verification chain between the distribution system operator, EMS and consumer.
- What matters now: Prepare investment decisions before AGNES goes live, with tools that calculate all value streams at the same time.
In brief: what is this about?
In February 2026, the Bundesnetzagentur presented a pilot concept for flexibility-based grid fees. It replaces the previous logic of atypical grid use, 15 critical hours a year, with a daily flexibility requirement. That sounds like a minor technical change. It is not. It is a paradigm shift with direct economic consequences for industry, EPCs and energy utilities.
In this article we show what changes in concrete terms, what the simulation shows for a real industrial site, and why the AGNES system will be the decisive enabler.
Status quo: how individual grid fees work today
Large industrial consumers with an annual consumption of at least 10 GWh/a can negotiate individual grid fees today on the basis of § 19(2) StromNEV. The logic: anyone who uses the grid atypically, that is, not during the HLZF (high-load time windows set by the German grid operator) of the upstream grid operator, receives a discount on regular grid fees, often 50 to 80% on the demand charge.
The system is, however, static and backward-looking. Proof is based on historical peak hours, typically 15 hours a year, and must be provided retrospectively. Anyone caught in a single one of these hours loses the discount in full or in part. Forecasting and proof are laborious and often unreliable, and optimisation against them is largely reactive.
In short: the existing model rewards passive load shifting in very rare peak hours. Continuous, grid-supportive flexibility is not rewarded.
The BNetzA pilot concept: daily flexibility instead of annual peaks
The pilot concept of 19 February 2026 fundamentally shifts the logic. There are two models to choose from:
Model A: spot market flexibility
The consumer takes responsibility for following Day-Ahead or Intraday prices. In at least 3 expensive and 3 cheap hours each day, grid load must deviate from the reference load by ≥ 3%. The grid retains a right of veto in case of local congestion. Price signals come from the market, not from the grid operator.
Model B: grid-supportive flexibilisation (HLZF)
The distribution system operator actively defines high-load and low-load time windows, with up to 48 hours' notice. Within these windows, the consumer must stay within the ±3% threshold. Assessment is daily. Up to 10% tolerance days are allowed.
The structural difference: instead of 15 critical hours a year, there are now two assessed time windows every day, theoretically more than 700 a year. Without automation and without a storage system, most sites cannot meet this reliably.
What this means economically: 6 scenarios for a paper mill in Kreuzau
We simulated the case as an example: a small paper mill in Kreuzau (Westnetz GmbH, 3,200 kW grid connection, ~22 GWh/a consumption). Data year 2025, WACC 8%, observation period of 20 years. All assumptions and data are fictional and serve solely to demonstrate the methodology.
You can find the full interactive case, with all scenarios, flow charts and KPIs, in our Use case: Flexibility-based grid fees § 19 StromNEV vs. AGNES pilot concept.
1. Baseline: without BESS (reference)
Operating costs: €2,793,822/a. No storage system, no active flexibility management. Net present value: €0 (reference).
2. Model A: spot market flexibility (BESS 865 kWh / 433 kW)
Investment: €243,787. NPV: -€283,141 at a -9.1% return, no payback period. The grid fee savings do not cover the investment.
3. Model B: grid-supportive flexibilisation / HLZF (BESS 574 kWh / 287 kW)
Smaller storage system, lower investment: €162,192. NPV: -€227,557 at a -12.7% return. Again, no positive business case from the grid fee model alone.
The key finding
Flexibility-based grid fees alone do not finance the necessary infrastructure. The discount covers operating costs, but not the debt service for the BESS investment.
4. Model A + dynamic electricity procurement (BESS 1,539 kWh / 770 kW)
As soon as the storage system is used for grid fee optimisation and Day-Ahead arbitrage at the same time, the picture changes: NPV +€141,223, return +12.1%, payback period 7.5 years. First-year savings of ~€57,700. Operating costs fall by 2% compared with today.
5. Model B: HLZF + dynamic electricity procurement (BESS 1,448 kWh / 724 kW)
A combination of time windows defined by the distribution system operator and arbitrage. Investment: €406,853. NPV: +€47,519, return +9.6%, payback period 8.1 years.
6. Model A (30%) + grid connection increase to 4.2 MW (BESS 5,564 kWh / 2,782 kW)
Grid-scale storage with an extended grid connection and an aggressive arbitrage strategy. Investment: €1,114,258. NPV: +€817,195, return +17%, payback period 5.5 years. Operating costs 7% lower than the baseline.
The jump from an NPV of -€228,000 (Model B alone) to +€141,000 (Model A + dynamic procurement) does not come from higher grid fee discounts, but from using the storage system for electricity procurement optimisation at the same time. That is the central message: The stack makes the business case, not the grid fee model alone.
View all 6 scenarios in detail with the interactive results page →
{{use-case}}
Why AGNES is the missing building block
The pilot concept works from a regulatory point of view. What is still missing is the infrastructure for automated signal transmission between the distribution system operator, metering system and consumer. That is exactly what AGNES is meant to provide, the BNetzA's automated grid fee management system: the digital interface through which distribution system operators transmit time windows, consumers give flexibility commitments and fulfilment is verified.
Without AGNES, Model B is in effect a bilateral contract business with manual reporting. Transaction effort is high and it is hardly scalable. With AGNES, the pilot concept becomes a process that can be standardised.
What then shifts in concrete terms:
- Lower transaction barrier: § 19 contracts move from bilateral negotiation to standardised, digitisable tariffs, accessible to more sites with less overhead.
- Combinable revenue streams: A storage system optimised for AGNES signals can run arbitrage in parallel, shave load peaks and generate direct marketing revenues. Economic viability comes from the stack, not from a single use case.
- New requirements for planning tools: Anyone deciding on BESS investments today needs tools that calculate all value streams at the same time: grid fee model, market signals, load profile and investment return in one model.
What you can do now
AGNES is not live yet, but the decisions made today on storage system sizing, tariff strategy and EMS architecture determine whether a site can benefit from it or not.
With minimum energy, you can already run this case today: import the load profile, enter the grid fee model, and optimise the storage system and electricity procurement together, including a 1-click presentation for the decision-maker.
Do you have questions or want to simulate the case for your site? Use our contact form or book an appointment directly.
We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.
Flexibility-based grid fees: § 19 StromNEV vs. the AgNes pilot concept
6 scenarios show that flexibility-based grid fees alone do not carry the BESS investment. Only the combination with dynamic electricity procurement delivers an NPV of +€141,223 at a 12.1% return.
+141k
12,1%
7.5 yrs
57.7k