Key takeaways from this article:
- Atypische Netznutzung means deliberately shifting loads out of the HLZF + application + monitoring. It is clearly distinct from pure peak shaving with no regulatory reference.
- The legal basis is § 19 StromNEV. The distribution system operator sets the HLZF individually for each grid area and adjusts it every year.
- A strong sign of suitability: clear, recurring HLZF peaks with an identifiable cause. Random one-off events speak against it.
- Robust applications need 12 to 24 months of gapless 15-minute load profiles, clean tariff components and a production/operations calendar.
Many businesses already smooth load peaks today. What matters, though, is whether and how this translates into reduced grid fees. This article walks you step by step through the terms, rules and data, so that even non-experts can follow easily.
Understanding atypische Netznutzung in 5 steps
The following 5 steps are the foundation for understanding and implementing atypische Netznutzung: clarify the terms, understand the legal framework, check the site requirements, secure the data basis, and only then calculate scenarios.
Definition & objective (atypische Netznutzung vs. "normal" peak shaving)
Atypische Netznutzung means that a site shifts its highest loads deliberately out of the grid operator's HLZF and proves this. Reduced grid fees may be available for this. Peak shaving only smooths maximum power technically, without any link to the HLZF and without a formal procedure.
In short: Peak shaving may save on demand charges, while atypische Netznutzung can additionally reduce grid fees if the requirements are met and approved.
Easy to remember:
- Atypische Netznutzung = deliberate shifting relative to the HLZF + application + monitoring
- Peak shaving = technical smoothing with no regulatory reference
- Both can be combined, with the HLZF logic taking priority
Regulatory framework: § 19 StromNEV and the roles of the Bundesnetzagentur (BNetzA, Germany's Federal Network Agency) and the distribution system operator
The rules are set out in the Stromnetzentgeltverordnung (StromNEV), § 19. It regulates under which conditions and in which procedure grid fees can be reduced for atypische Netznutzung. It also covers deadlines, data formats and evidence.
The Bundesnetzagentur sets the guidelines. The distribution system operator sets the HLZF, reviews applications and applies the reduced fees. The HLZF can differ by grid area and can be adjusted every year.
Requirements on the site and project side
Not every business starts from zero. An honest look is important: where do peaks occur, what can be controlled, and who decides on it?
1. Load structure & "hit pattern" (for end customers and EPCs)
Look at the 15-minute values of the last 12 to 24 months:
- How often do the highest peaks fall within the HLZF?
- Are there recurring patterns (e.g. weekdays from 17:00 to 20:00, Monday start-up, simultaneous charging)?
- Can you name specific drivers (charging park, heat booster, pump start)?
Clear, recurring HLZF peaks with an identifiable cause are a strong signal, because atypische Netznutzung is then realistic in principle if this cause can be controlled or shifted.
Note on working together:
- End customer: Knows their own processes best, from shift schedules and start-up times to quality and safety limits, and can say what can realistically be shifted or buffered.
- EPC/integrator: Examines the measurement data, spots recurring patterns and translates them into workable rules and technology (e.g. storage, charging or process control) so that atypische Netznutzung works reliably day to day.
2. Know the technical room for manoeuvre and its limits
In this context people often talk about technical flexibility, meaning all the practical levers with which load peaks can be shifted or buffered in time without putting quality or safety at risk. In concrete terms, this can include:
- Shift processes: Adjust start times, stretch start-up ramps, change sequences (e.g. do not ramp everything up at the same time).
- Buffer energy: Battery storage uses electricity from quiet periods and releases it within the HLZF.
- Control charging: Limit charging power, set priorities, stagger charging sessions (AC/DC settings, queueing).
- Bring heating/cooling forward: Charge cold or thermal storage (thermal buffer) somewhat earlier so that less power is needed within the HLZF.
- Automated rules (EMS): "If HLZF, then …", e.g. discharge the storage system, throttle chargers, delay processes.
Rule of thumb: Technical flexibility = What can we shift or store temporarily?
The end customer provides the approvals and limits (quality, shifts, safety). The EPC/integrator implements them in metering, control and storage technology.
{{cta}}
3. Organisational readiness
Atypische Netznutzung is teamwork. Sites that do well with it are those that:
- prioritise their EMS rules clearly on the HLZF,
- bring production, facility and energy together early (operating windows, approvals, escalation routes),
- name responsibilities (energy, maintenance, IT/OT) and make monitoring routine.
This builds trust, internally and with the grid operator.
4. Recognise examples of stop signals or no-go patterns
These can include, for example:
- The highest peaks are mostly outside the HLZF or are random with no pattern.
- One-off events (fault, test) drive the annual maxima. This is not reproducible.
- Flexibility is theoretical but not operationally approved (no approvals, no process).
{{use-case}}
Data basis: what you really need
Good decisions are data-driven, and with atypische Netznutzung this applies twice over. The data must be complete, plausible and traceable. This is what a practical basis looks like:
1. Five-minute load profiles (12 to 24 months)
- Original sources from the metering/grid operator (CSV/EDIFACT), without gaps, with the correct time zones/daylight saving time.
- Plausibility checks: Are public holidays visible? Are there outliers or measurement errors?
- The EPC analyses power peaks, daily and weekly seasonality and HLZF hits.
- In addition, temperature and public holidays help to tell causes apart (e.g. heating peaks in cold weather).
2. Tariff components
The EPC breaks down the cost structures so that effects become visible:
- Demand charges, energy charges, metering/base charges, grid fees, taxes/levies.
- Important for modelling: the assessment period of the power (monthly/quarterly/annual), the contracted power and the penalties for exceeding it.
This shows where atypische Netznutzung really has an effect, and where it does not.
3. Production/operations calendar
- Shift schedules, maintenance, seasonal peaks, charging park profiles, OT events* (e.g. start-up ramps).
- Aim: separate structural from random peaks and identify shiftable blocks.
This makes later approvals easier and keeps the plan realistic.
*OT events are processes in operational and automation technology (operational technology), meaning everything that directly controls machines, plants and building automation (as opposed to IT/office systems).
Output of this stage (clear, tangible, ready for decisions)
On this basis, gut feeling becomes a robust plan. You should now have the following three items:
- Suitability score: e.g. HLZF hit rate, shiftable kW, stability of the patterns
- Baseline KPIs: P95/P99 power in and outside the HLZF, annual energy consumption, share of shiftable load
- Data checklist (complete/valid), which you can later use as an annex to the application
With an honest site assessment and a clean data basis, atypische Netznutzung turns from a buzzword into a robust project, for you, your team and the grid operator.
_____
Tip:
minimum.energy takes the legwork off your hands: import load profiles, check them for plausibility automatically and assign them directly to the HLZF. You then get a suitability score with baseline KPIs and can calculate scenarios for atypische Netznutzung, self-consumption and arbitrage side by side, including optimised storage size and EMS rules. Finally, the platform generates the charts and tables needed for the application and monitors HLZF compliance during operation with alerts.
_____
We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.
Sector coupling with BESS for commercial sites: heat pump, battery and thermal storage as one system
Sector coupling with BESS for commercial sites: how a heat pump, BESS and thermal storage as an integrated system save 78% of gas consumption, and how atypische Netznutzung raises the return to 18.5% without additional investment.
18,5%
5.2 yrs
751.2k
-15%
Ready for quotes that actually hold up?
Bring an example project. In 30 minutes, we will show you how minimum energy transforms your pre-sales process.