Share this post
Key takeaways from this article:
- Commercial arbitrage is not a price trick, but an operation with hard limits.
- Time resolution is decisive: 15-min is often closer to reality than hourly averages.
- Without a cost per cycle, every spread looks profitable, but only in the model. Typical guide value: 3-10 €/MWh throughput.
- η is not constant: not at high load, nor during long standby phases.
- kW decides whether you can use a time window, kWh only for how long.
- Tariff and billing logic must match the model, otherwise you are calculating at the wrong price.
Many arbitrage calculations look the same at the start: you take a price series, apply a battery size, run a few charge/discharge operations and get a nice "revenue per year" curve.
The problem: in commercial projects, arbitrage rarely fails because there are no price fluctuations. It fails because the battery is not allowed to operate the way the Excel model assumes.
In practice, arbitrage is an interplay of time resolution, operating limits, billing and wear. If one of these is missing, "looks good" quickly becomes "doesn't fit the operation" or "doesn't fit the bill". This article shows seven parameters that are often missing from quick models, and how to build them in so that your case becomes more robust.
1) Time interval: why 15 minutes is often the default in commercial projects
Arbitrage depends on short windows. A favourable window can appear and vanish again within an hour, just like a load peak. If you only calculate hourly, one of two things usually happens:
- You "smooth away" the relevant minutes and underestimate restrictions (e.g. peaks).
- Or you assume the battery can do exactly the right thing within an hour, which in reality is not possible because of connection limits and reserves.
That is why the simple rule of thumb is: if the load profile and the operation are thought of in quarter-hours, the optimisation should do the same. Even a rough 15-min model is often closer to reality than a very "clean" hourly model.
→ How to evaluate a 15-min load profile properly: Analysing load profiles properly
2) Round-trip efficiency: not just "one value", but dependent on how you operate
The round-trip efficiency (η_roundtrip) describes how much of the energy taken in during charging can be delivered as usable energy again after a full charge/discharge operation. A fixed value such as "η = 0.9" is fine as a first approximation, but for robust arbitrage calculations you should keep in mind that η_roundtrip is not constant in practice. It depends, among other things, on
- the power used (C-rate),
- the state of charge (SoC) range,
- the temperature and the operating strategy.
Important: the relationship is not simply monotonic. At high C-rates (intensive arbitrage operation), η drops noticeably. At very low C-rates or during long standby phases, on the other hand, self-discharge and auxiliary consumption can also reduce the effective efficiency. This too is often overlooked in quick models.
Why this matters: arbitrage often uses exactly those time windows in which you run the storage system intensively. If the actual efficiency under these operating conditions is lower than assumed, the economic threshold (the spread from which charging/discharging pays off) shifts noticeably.
Pragmatically, a simple improvement over a "fixed η" is often enough: either set it more conservatively or work with two operating cases (e.g. "moderate power" vs. "high power"), instead of overloading a characteristic map.
3) Cost per cycle/degradation: otherwise every cycle is "free", and that makes every spread profitable (in the model)
This is one of the most common reasons for "too good" arbitrage results: the model sees every additional charge/discharge movement as a chance to make money, because it costs nothing. In reality, every kWh put through causes wear.
If you ignore this, you optimise towards "maximum throughput", i.e. many small cycles wherever there is a bit of spread. In total this looks large, but it is often neither operationally nor economically sensible.
A pragmatic starting point is a simple cost approach:
- Cost per throughput (€/MWh) running through the battery, or
- Cost per (equivalent) full cycle.
For current lithium-ion BESS projects, the typical cost per cycle is roughly in the range of 3-10 €/MWh throughput, depending on cell chemistry, design and assumed remaining lifetime. This means that a spread below 5-10 €/MWh hardly delivers any contribution margin after efficiency losses and wear.
This order of magnitude helps you spot implausible results quickly when modelling. It forces the optimisation to take only those time windows where something is still left after losses and wear.
Note on calendar ageing: cost per cycle only captures usage-dependent degradation. But batteries also age over time, regardless of how much they run. For cases in which the battery deliberately holds large reserves (→ point 5) or is used little seasonally, calendar ageing can be the dominant factor and should be considered separately.
→ How an arbitrage case that complies with MiSpeL (German BNetzA rules for storage that charges both grid power and on-site renewable power) calculates with real cycle assumptions: Use case: MiSpeL-compliant storage system design for arbitrage 2026
4) kW vs. kWh: many people size by energy, but arbitrage needs access to time windows (power)
A storage system can be large (lots of kWh) and still perform poorly for arbitrage if it does not have enough power (kW), or if the connection limits the power.
A simple picture helps:
- kWh tells you: how long can I run?
- kW tells you: how much can I deliver within the relevant time window?
Arbitrage windows are often short. If you are then only allowed to charge/discharge at low power, you "miss" part of the value, even if the price spread is large.
For quotes, this is a very important point: a business case that optimises kWh but treats kW as an afterthought is almost always open to challenge in commercial projects.
→ How power and energy sizing interact in Multi-Use cases: Use case: Retrofitting BESS Multi-Use scenarios
5) SoC limits and reserves: in reality, 100% of the battery is rarely available for arbitrage
In Single-Use calculations, the battery often runs "freely" between 0 and 100%. In commercial projects this is rarely the case. Even with a setup that is primarily meant to do arbitrage, there are usually practical reserves:
- Safety reserve (operation / availability)
- Reserve for peak events (if the site expects them)
- Limited SoC windows for lifetime or operational reasons
The effect is mundane but large: if you do not model reserves, you plan with capacity that you will not be allowed to use later. Then the case is "too good" in the first year, but permanently below plan in operation.
→ How SoC management and peak shaving reserve interact in operation: Peak shaving in C&I: implementation & practical operation
6) Connection and grid restrictions: Excel often lets batteries "drive through walls"
Whether it is a separate connection or an existing one, there are almost always hard limits that shape the operation:
- maximum import power from the grid,
- maximum feed-in power (if grid feed-in is intended or permitted at all),
- transformer/switchgear limits,
- protection and control requirements,
- and, very practically: operating rules at the site.
Many quick models do not include these limits, or only as a rough constraint. The result: the battery charges exactly when the plant is already at its limit, or discharges even though grid feed-in was not intended at all. That is not a "small deviation", it is a different world.
If you only model one block of restrictions properly, make it this one: kW limits at the connection (import/export) plus SoC limits. This often brings models much closer to real operation straight away.
→ How a separate grid connection fundamentally changes the restriction logic: Arbitrage: dedicated grid connection for battery storage in C&I
{{use-case}}
7) Tariff and billing components: the spot price is rarely what counts in the end
Even if you use exchange prices, in commercial projects the bill decides. And it does not consist only of "ct/kWh".
Typical stumbling blocks:
- A dynamic tariff does not reproduce the exchange price 1:1 (surcharges, structure, rules).
- Grid fees and capacity components can strongly influence the optimal operating strategy.
- The metering and billing interval (hour vs. quarter-hour) can tip the model logic.
A good reality check is therefore: can you reproduce your model logic in a traceable way on a real bill (or a real tariff sheet)? If not, there is a high risk that you are optimising at the "wrong price".
→ Where exactly arbitrage and dynamic tariffs differ in billing: Arbitrage vs. dynamic tariffs in commercial projects
→ How dynamic tariffs work in the C&I segment: Dynamic electricity tariffs in C&I: opportunity and challenge
Mini framework: a clean arbitrage case in 5 steps
- Set the time base: 15-min, if the load profile and restrictions are available at that resolution.
- Parameterise the battery realistically: power, energy, η, SoC window, cost per cycle (including a plausibility check against ~3-10 €/MWh).
- Make restrictions explicit: connection (import/export), reserves, operating rules.
- Formulate the objective clearly: what should be optimised primarily (cutting costs, revenue, robustness)?
- Check plausibility: not "simulate a year and done", but manually check 2-3 representative weeks. Does the operating strategy make operational sense? Does it match the billing?
Typical failure patterns (briefly, from practice)
- "Price series in, result out" without a cost per cycle → many small cycles, unrealistically good revenue.
- Hourly model with quarter-hour reality → peaks and windows are hit wrongly.
- kWh optimisation without a kW bottleneck analysis → large battery, small effect.
- Tariff ignored → the model optimises on spot, the bill follows a different logic.
- Restrictions added too late → the operation later has to limit "conservatively", and the business case shrinks.
Practical checklist: what you need at minimum for a robust calculation
- 15-min load profile (or at least representative weeks in high resolution)
- clear connection/power restrictions (import/export, transformer/protection, operating rules)
- tariff/procurement logic (price sheet of the grid operator, components, time interval)
- storage system parameters (kW/kWh, SoC limits, η assumption, cycle assumption including calendar ageing)
- objective (arbitrage only or Multi-Use with priorities)
We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.
Cross-market instead of arbitrage-only: How FCR and aFRR almost triple the net present value of a 10 MW BESS
10 MW grid connection, standalone BESS: arbitrage alone delivers a net present value of €6.3 million. With FCR and aFRR in the stack, it becomes €17.3 million, and a grid operator's ramping requirement can be quantified to the euro.
40,9 %
17.3 million
2.4 yrs
2,7×
Ready for quotes that actually hold up?
Bring an example project. In 30 minutes, we will show you how minimum energy transforms your pre-sales process.