30-minute initial call
Free of charge and non-binding


With changing energy markets and new rules such as MiSpeL (German BNetzA rules for storage that charges both grid power and on-site renewable power) or AgNes (BNetzA reform of German grid fees towards capacity-based pricing), C&I battery storage becomes a strategic lever in 2026 for businesses, EPCs and investors. But how do you navigate regulation, grid connection and economic viability? Our free white paper gives you a practical compass through the German storage market, with real use cases from more than 2,000 completed projects.
Use Case
Industrial site in NRW with 9.3 GWh consumption and existing PV: three storage system scenarios across two grid fees regimes. The smaller storage system with a dynamic tariff beats 5 MWh Multi-Use.
323k
1.1 yrs
2.86M
-23%
Use Case
A C&I site with existing PV is assessing how battery storage can move from a pure cost optimiser to a MiSpeL-ready market revenue asset.
290k
866k
262 MWh
-42%
Use Case
6 scenarios show that flexibility-based grid fees alone do not carry the BESS investment. Only the combination with dynamic electricity procurement delivers an NPV of +€141,223 at a 12.1% return.
+141k
12,1%
7.5 yrs
57.7k