In 2024, 4.4 TWh of renewable electricity were curtailed in German distribution networks. The data comes from our own IFG request to the Bundesnetzagentur (BNetzA, Germany's Federal Network Agency), analysed for the 20 largest distribution system operators. We have not seen a dataset in this form before.
Three findings from the report:
The cost: €422 million, passed on to grid fees. That is €96 per MWh not delivered.
Use Case
A C&I site with existing PV is assessing how battery storage can move from a pure cost optimiser to a MiSpeL-ready market revenue asset.
290k
866k
262 MWh
-42%
Use Case
Industrial site in NRW with 9.3 GWh consumption and existing PV: three storage system scenarios across two grid fees regimes. The smaller storage system with a dynamic tariff beats 5 MWh Multi-Use.
323k
1.1 yrs
2.86M
-23%
Use Case
10 MW grid connection, standalone BESS: arbitrage alone delivers a net present value of €6.3 million. With FCR and aFRR in the stack, it becomes €17.3 million, and a grid operator's ramping requirement can be quantified to the euro.
40,9 %
17.3 million
2.4 yrs
2,7×