Share this post

Key takeaways from this article:

  • Since 1 August 2026, the fixed feed-in tariff has been 7.70 ct/kWh (partial feed-in, up to 10 kW). From 100 kW it is not available anyway, as Direktvermarktung is mandatory there.
  • The cabinet draft of EEG 2027 of 29 July 2026 abolishes the fixed tariff for new systems and makes Direktvermarktung the standard. It is not yet in force.
  • The decisive change is not the abolition, but the switch from the one-sided market premium to a two-sided contract for difference. Revenue above the reference value will flow back in future.
  • If you commission by 31 December 2026, you keep the current system for twenty years, with no repayment obligation.
  • The value of the system shifts from grid feed-in to self-consumption and flexibility. Negative prices, feed-in caps and clawback cannot be modelled with annual averages.
  • Feed-in tariff or Direktvermarktung? From 2027, you will no longer be the one to decide

    Since 1 August 2026, the fixed feed-in tariff for a rooftop system of up to 10 kWp has been 7.70 ct/kWh. For systems above 100 kW it was never an option, as Direktvermarktung has been mandatory there for years.

    On 29 July 2026, the Federal Cabinet adopted the government draft of EEG 2027. It abolishes the fixed tariff for new systems and makes Direktvermarktung the standard for everyone. For you as a planner, though, a different change is decisive: the one-sided market premium is replaced by a two-sided contract for difference. This removes a revenue component that many business cases quietly include in their calculations.

    The draft is not yet in force. The Bundestag, the Bundesrat and EU state aid approval are still pending. If you commission by 31 December 2026, you stay in the old system.

    What applies today

    The Bundesnetzagentur (BNetzA, Germany's Federal Network Agency) publishes the support rates every six months. What counts is the commissioning date, not the order and not the building permit.

    Fixed feed-in tariff for building-mounted PV systems

    Commissioning 1 August 2026 to 31 January 2027

    Capacity band Partial feed-in
    ct/kWh
    Full feed-in
    ct/kWh
    up to 10 kW 7.70 12.22
    10 to 40 kW 6.66 10.24
    40 to 100 kW 5.44 10.24
    over 100 kW Direktvermarktung mandatory, no fixed tariff

    Tariff applied by capacity portion under § 23c EEG. The supplement of 1.5 ct/kWh under Solarpaket I for systems from 40 kW is not included, as state aid approval is still pending. Source: Bundesnetzagentur, support rates for solar systems, 1 August 2026 to 31 January 2027. Presentation: minimum energy.

    Three points that are regularly miscalculated in practice:

    The rates apply by capacity portion under § 23c EEG. For a 60 kWp system, the first 10 kW receive the first-band rate, the next 30 kW the second, and the rest the third. The result is a blended rate, not a threshold above which the whole system is paid less.

    From 100 kW installed capacity, Direktvermarktung is mandatory. The fixed feed-in tariff is not open to you there at all. From 1,000 kW, the tendering requirement applies.

    The next degression of one per cent follows on 1 February 2027.

    The applicable value is the figure that really matters in the calculation

    As soon as you move into Direktvermarktung, the fixed tariff is irrelevant. What counts then is the applicable value. It is 0.4 ct/kWh above the fixed rate. That is the marketing cost flat rate under § 53 EEG.

    The sliding market premium tops up the difference to the monthly solar market value. If the market value is higher, you keep the additional revenue. That is the core of the current system: it guarantees a floor and does not cap the upside.

    Fixed feed-in tariff for building-mounted PV systems

    Commissioning 1 August 2026 to 31 January 2027

    Capacity band Partial feed-in
    ct/kWh
    Full feed-in
    ct/kWh
    up to 10 kW 7.70 12.22
    10 to 40 kW 6.66 10.24
    40 to 100 kW 5.44 10.24
    over 100 kW Direktvermarktung mandatory, no fixed tariff

    Tariff applied by capacity portion under § 23c EEG. The supplement of 1.5 ct/kWh under Solarpaket I for systems from 40 kW is not included, as state aid approval is still pending. Source: Bundesnetzagentur, support rates for solar systems, 1 August 2026 to 31 January 2027. Presentation: minimum energy.

    How much this mechanism really delivers is shown by the 2025 annual solar market value of 4.508 ct/kWh. Individual months in winter were above 10 ct/kWh, and in sunny spring months below 2 ct/kWh. An annual average in the model hides this spread completely. If you calculate with annual values, your calculation misses reality.

    What the EEG 2027 draft changes

    The cabinet decision of 29 July 2026 provides the following for new systems:

    • The fixed feed-in tariff is dropped. For small systems it is replaced by a transitional payment limited to 36 months, equivalent to around 5.20 ct/kWh.
    • The applicable value for solar systems not subject to tender is set at a uniform 6.20 ct/kWh. The higher values for building-mounted systems and the capacity classes up to 10 and up to 40 kW are dropped.
    • Direktvermarktung becomes the standard for all new systems.
    • Larger subsidised new systems run on two-sided contracts for difference. If the market price is above the reference value, you pay the difference back.
    • The permissible grid feed-in capacity at the grid connection is limited. The draft names 50 per cent for small PV systems and 70 per cent for ground-mounted systems.

    The switch to contracts for difference implements EU Regulation 2024/1747, which applies from 17 July 2027. It makes no exception by technology.

    The difference in one sentence: until now, support was asymmetric in your favour. In future it is symmetric. High-price periods no longer feed into your return, but flow back.

    Negative prices are no longer a marginal phenomenon

    Since 25 February 2025, the applicable value for new systems from 2 kW has fallen to zero in every quarter-hour with a negative exchange price. There is no longer an hourly threshold.

    To give you the scale: in 2023 there were 301 hours with negative Day-Ahead prices, in 2024 there were 457 and in 2025 there were 573. In the first half of 2026 the frequency fell to around 291 hours, but the depth of prices increased. On 1 May 2026 the low was around minus 499 EUR/MWh.

    § 51a EEG adds part of the lost periods to the end of the support period, at a factor of 0.5 for solar systems. That is compensation after twenty years. In the cash flow calculation for the first ten years, it does not help you.

    What this means for system design

    The value of a PV system is shifting away from grid feed-in. Three consequences for modelling:

    Self-consumption beats grid feed-in, and the gap is growing. For a commercial business, a kilowatt hour of grid electricity saved is worth a multiple of the best feed-in tariff. Grid electricity prices are rising structurally, while tariff rates are falling as scheduled. This gap keeps widening.

    Flexibility becomes a source of revenue, not a nice-to-have. When the tariff falls to zero in negative quarter-hours and the feed-in capacity at the grid connection is limited, the storage system decides whether generation earns any revenue at all. That is not a bonus on top of the return. It is the return.

    Annual averages are no longer enough. If you want to model negative prices, feed-in caps and a possible clawback, you need quarter-hourly resolution and regulation built into the model. A price average in an Excel cell captures none of these effects.

    {{use-case}}

    Conclusion

    Until 31 December 2026, the familiar system with a one-sided market premium applies, for twenty years and with no repayment obligation. After that, according to the current draft, the revenue logic changes fundamentally.

    For projects entering the design phase now, this means: calculate two regimes, not one. And answer the question of whether the system still pays off when grid feed-in is no longer the main revenue.

    That is exactly what minimum energy is built for. Regulation built in, quarter-hourly resolution, both scenarios in one model. So your numbers stay reliable when the rules change.

    As of September 2026. Sources: Bundesnetzagentur, support rates for solar systems, period 1 August 2026 to 31 January 2027. EEG 2023, §§ 20, 21, 23c, 48, 49, 51, 51a, 53. Government draft EEG 2027, cabinet decision of 29 July 2026. Regulation (EU) 2024/1747. netztransparenz.de, annual solar market value 2025. SMARD.

    We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.

    Ready for quotes that actually hold up?

    Bring an example project. In 30 minutes, we will show you how minimum energy transforms your pre-sales process.

    Sign up once and stay informed

    Email distribution list

    Sign up once and stay informed

    On this list, we keep you up to date on upcoming webinars, trade fair appearances, new blog posts and glossary entries, as well as our brand-new monthly newsletter covering all product news.
    No items found.