Separation option and MiSpeL: market integration of storage systems and charging points, and how you can master the regulatory stage

Table of contents

More about the author

Dr.-Ing. Leander König-Kotzur

Managing Director Product

Go to author page
Go to Google Scholar profile

More about the co-author

Dr.-Ing. Felix Kullmann

Managing Director Customer Success

Go to author page
Go to Google Scholar profile

Share this post

Key takeaways from this article:

  • With arbitrage electricity, MiSpeL introduces a third category alongside green electricity and grid electricity. This fundamentally changes storage system planning and system simulation.
  • Two procedures are available: the separation option with 15-minute accuracy (interval-metered systems) and the simplified flat-rate option for PV storage systems up to 30 kWp.
  • Economically, relief of up to 4–5 ct/kWh is possible on volumes fed back into the grid, as levies and taxes partly fall away (§ 21 EnFG).
  • Timeline: determination by the BNetzA by 30 June 2026. The flat-rate option can only be used once EU state aid approval has been granted.
  • 1. MiSpeL: what is changing

    With the introduction of the metering procedure for verifying the separation option (MiSpeL), the Bundesnetzagentur (BNetzA) is specifying how different electricity origins must be distinguished in future.

    While the simple split between green electricity and grid electricity applied until now, the new rule requires three-way accounting:

    1. Green electricity: locally generated (green) and stored (yellow) PV or renewable electricity
    1. Grid electricity: conventional electricity purchased and consumed from the public grid or local systems  (black)
    1. Arbitrage electricity: electricity purchased specifically, temporarily stored and exempt from levies, for price optimisation ("netting-eligible" share, red)

    Figure 1: KEY POINTS FOR THE CONSULTATION (as of 17 September 2025) Market integration of storage systems and charging points (MiSpeL) Annex 1: Separation option

    This third category is new, and it fundamentally changes how storage system planning and system simulation are understood.

    MiSpeL is part of the Solarspitzengesetz (German solar peak law of February 2025) and is intended to enable the market integration of storage systems and charging points. The aim is to make storage systems economically usable without losing EEG support, which means real system flexibility instead of rigid exclusivity rules.

    2. Why MiSpeL is more than regulation

    MiSpeL is not a niche topic. It is a real turning point for system planners and EPCs.

    The correct separation of these three energy flows will determine:

    • the eligibility for support of fed-in electricity (EEG § 19(3b) and (3c)),
    • the exemption from levies under § 21 EnFG,
    • and the economic viability of a project.

    According to current estimates by the Bundesnetzagentur, 10–40% of the energy volumes in hybrid PV storage systems may be arbitrage electricity. With price differences of €50–100/MWh, that means a potential additional annual revenue of €5,000–30,000, provided the separation is done cleanly.

    3. Two options, one goal: compliant flexibility

    The BNetzA introduces two technical procedures to implement MiSpeL:

    (a) Separation option: precision on a 15-minute basis

    Here, each 15-minute interval is balanced individually.

    In line with EEG § 19(3b), the system calculates exactly which share of the stored electricity comes from PV (eligible for support) and which from the grid (not eligible for support).

    This "separation fiction" is applied using high-resolution time series and clearly defined priority rules: the grid share is always deemed to be fed in first, and only then the green electricity share.

    This creates a legally robust and audit-proof model that also works for DC-coupled storage systems.

    Example:

    A 1 MWh storage system charges 600 kWh of PV electricity and 400 kWh of grid electricity during the day.

    In the evening, 800 kWh are fed in.

    → 400 kWh count as grid electricity (not eligible for support), 400 kWh as green electricity (eligible for support).

    This option is aimed at larger, professionally operated systems and requires interval metering with 15-minute resolution.

    (b) Flat-rate option: simplification for small systems

    For PV storage systems up to 30 kWp, the flat-rate option offers a simplified procedure:

    Up to 500 kWh per kWp of installed PV capacity count as stored green electricity on a flat-rate basis and receive full support, without 15-minute metering.

    Any volumes above that are automatically treated as grid electricity feed-in.

    Prerequisite: only PV systems, storage systems and bidirectional charging points may be operated behind the same feed-in point.

    As of Q4 2025, the flat-rate option has not yet been cleared under state aid rules, but it is due to come into force in 2026.

    4. What planners and EPCs need to know now

    For planners, MiSpeL means the era of simplified energy volume models is over.

    From now on, every 15-minute interval counts.

    This has direct consequences for project planning:

    • Simulations must represent time-resolved electricity flows (PV → storage system → grid).
    • With dynamic tariffs (EPEX Spot, redispatch 2.0), price and grid fee logic must be integrated.
    • Metering concepts require several meter points (grid connection, storage system, and a charging point where applicable).
    • All data must be synchronised and recorded in line with interval metering requirements.

    For existing systems, this often means retrofitting smart meters or adding metering points.

    The aim of the Bundesnetzagentur is to create uniform, verifiable rules so that storage system operators can in future act in a way that is eligible for support, active in the market and beneficial to the system.

    5. Economic dimension: support meets market logic

    MiSpeL brings a clear economic advantage for storage system operators:

    • EEG support is retained proportionally, even if the storage system takes in grid electricity.
    • Levies & taxes on electricity fed back into the grid are partly waived (§ 21 EnFG):
    • CHP and offshore levy: approx. 1.09 ct/kWh
    • § 19 StromNEV levy: approx. 1.56 ct/kWh
    • Electricity tax (planned): 2.05 ct/kWh

    → potentially up to 4–5 ct/kWh relief on volumes fed back into the grid.

    For large C&I storage systems with 1 MWh capacity and ~300 cycles a year, this equates to savings of around €15,000–20,000 a year, while also improving grid efficiency.

    {{use-case}}

    6. The timeline

    This is what the current timeline looks like:

    • September 2025: draft published by the Bundesnetzagentur
    • October 2025: MiSpeL workshop and consultation
    • by 30 June 2026: determination to be completed (statutory deadline)
    • from 2026: separation option usable, flat-rate option after EU approval

    As a result, storage system planning is shifting from a "PV plus storage" mindset to integrated energy system modelling, which brings together the regulatory, technical and economic levels.

    7. How minimum energy masters this complexity

    minimum energy was developed out of academia, at the intersection of mathematical optimisation, energy market logic and regulatory modelling.

    Our aim: "Understand complexity, model it precisely and make it usable in practice."

    Our platform already:

    • models green electricity and grid electricity flows separately,
    • integrates time-resolved price signals and grid fees,
    • and enables compliant simulations for EEG, EnFG and StromNEV scenarios.

    With the upcoming MiSpeL update, we will:

    • introduce arbitrage electricity as a third electricity category,
    • model the BNetzA's separation logic (15-minute intervals) directly in the model,
    • and so enable MiSpeL-compliant project simulations: automated, transparent and scientifically sound.

    This is how we deliver what MiSpeL demands but hardly anyone can provide:

    Regulatory precision with technical simplicity.

    8. Conclusion

    MiSpeL marks the start of a new phase in the energy industry: regulation becomes measurable, flexibility becomes plannable. For EPCs, planners and operators, this is both a challenge and an opportunity.

    minimum energy combines scientific depth with market-ready technology. We develop software that does not just simulate assets but understands rules, from EEG § 19 and EnFG § 21 to price arbitrage and dynamic grid fees.

    minimum energy: software for the energy markets of the future.

    Precise. Compliant. Scientifically sound.

    We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.

    Ready for quotes that actually hold up?

    Bring an example project. In 30 minutes, we will show you how minimum energy transforms your pre-sales process.

    Sign up once and stay informed

    Email distribution list

    Sign up once and stay informed

    On this list, we keep you up to date on upcoming webinars, trade fair appearances, new blog posts and glossary entries, as well as our brand-new monthly newsletter covering all product news.
    No items found.