PV > 100 kWp: when does the move to Direktvermarktung really pay off?
Many project developers and companies face the same question:
Should I keep my PV system just under the 100 kWp limit, or is it worth thinking bigger?
The reality is more complex than simple threshold logic. Here is why:
Under 100 kWp: automatic feed-in tariff under the EEG
From 100 kWp: mandatory Direktvermarktung + market premium model
From 750 kWp: tendering obligation + market premium model
But how do these thresholds affect economic viability, especially when battery storage is integrated?
Our analyses show:
Larger PV systems can be significantly more attractive economically, but only if the storage system is also sized and operated correctly.
Combining Direktvermarktung, intelligent storage management and multi-use strategies unlocks significantly higher revenue potential than the conventional feed-in tariff.
Even for systems just above 100 kWp, a smart entry into Direktvermarktung can pay off if you consider the energy system as a whole.
Today's analyses were carried out with an example load profile for the Umweltministerium NRW site, so there is definitely still room on the roof.
Let's optimise it.
{{cta}}
We use AI to support research, structuring and language editing. minimum.energy is responsible for the technical content, classification and approval. Figures, claims and project-specific statements are checked before publication.
Grid connection report front of the meter: feed in and sell
Three stages front of the meter: how each additional revenue stream increases the net present value almost eightfold, from PV only to a mixed storage system with arbitrage.

10,2 %
1.3 million
~8×
3
Ready for quotes that actually hold up?
Bring an example project. In 30 minutes, we will show you how minimum energy transforms your pre-sales process.