Up to 80% discount on grid fees: atypische Netznutzung currently underpins many storage business cases. The AgNes draft from the Bundesnetzagentur (BNetzA, Germany's Federal Network Agency) of 6 August 2026 ends it. From 1 January 2029, the capacity charge model replaces the demand charge. Existing cases keep their discount, frozen, until the end of 2031 at the latest. After that, it ends.

 

What replaces it depends on a threshold: 10 GWh of annual consumption. Above it, the BNetzA is testing a successor in pilot projects that ties discounts to proven load shifting. Below it, there is no individual successor instrument. Then, for grid fees, what mainly counts is which capacity you order and which exceedances you deliberately allow.

 

This means every business case running beyond 2028 faces the same question: what is the storage system worth if the fee regime changes halfway through? In our model case with 9 GWh, the value contribution of peak shaving falls from plus €19,602 to minus €4,258 per year. The return on the storage system drops from 11.8% to 7.3%.

 

A single figure does not answer that. A range does. That is exactly what the Scenario Modeler is for: the same storage system, the same load profile, calculated across several fee regimes side by side. StromNEV with atypische Netznutzung until the end of 2028, frozen existing discount until the end of 2031, then the capacity charge model or the flex model from the pilot projects.

 

Leander and Leon show live:

  • The new feature: layer grid fee regimes as scenarios over the same business case, instead of building a new project for every assumption
  • The practical case: a storage system designed today with atypische Netznutzung. What happens to the business case when the capacity charge applies in 2029 and grandfathering ends in late 2031
  • The ordered capacity: why it is the biggest single lever in the model case and costs no investment
  • The design check: which storage size only works in one fee regime and which holds up in all of them
  • The customer conversation: how to present the range instead of promising a figure that regulation can overturn

 

Current status: the AgNes draft is not final. The consultation period ended on 18 September 2026, and the final determination is due by the end of 2026. The final rules for industrial grid fees will only come with a follow-up determination, announced for 2027. That is exactly why we calculate scenarios rather than forecasts: if you know the range, you design more robustly than someone waiting for the final version.

 

45 minutes. Straight from the software. For everyone whose storage system will run for longer than the regulation it was calculated on.

 

Register now.

Die Ausgangslage

Die Lösung

Im Webinar

Das nimmst du mit

Webinar Speaker

Dr. Leon Alberts

Head of Sales

Supporting our customers and partners in marketing complex energy systems with ease.

Dr.-Ing. Leander König-Kotzur

Managing Director Product

People and weather are volatile, and so are energy demand and energy supply. With optimisation, we reduce the deviation between them to a minimum.